Lock 14 Hydro Partners; Notice of Application Accepted for Filing and Soliciting Motions to Intervene and Protests, 54641-54642 [2013-21525]

Download as PDF Federal Register / Vol. 78, No. 172 / Thursday, September 5, 2013 / Notices long earth fill dam located between the non-overflow structure and the right abutment; and (3) an existing powerhouse containing 1 turbine with an installed capacity of 46,944kilowatts. The applicant estimates that the total average annual generation would be 153,604,600 megawatthours. All generated power is utilized within the applicant’s electric utility system. Additionally, Alabama Power proposes correct the mapping of the project boundary from 46.59 acres to 50.08 acres. The change would affect privately owned lands, resulting in no land disturbing activities. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. Procedural schedule and final amendments: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Notice of Acceptance or Deficiency Letter. Issue Scoping Document 1 Issue Scoping Document 2 Issue notice of ready for environmental analysis. Issue draft EA ...................... ehiers on DSK2VPTVN1PROD with NOTICES Issue Final EA ..................... November 2013. December 2013. February 2014. March 2014. September 2014. December 2014. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: August 28, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–21526 Filed 9–4–13; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 14:10 Sep 04, 2013 Jkt 229001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13213–003] Lock 14 Hydro Partners; Notice of Application Accepted for Filing and Soliciting Motions to Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Major License (5 Megawatts or less) b. Project No.: 13213–003 c. Date filed: May 16, 2012 d. Applicant: Lock 14 Hydro Partners, LLC e. Name of Project: Heidelberg Hydroelectric Project f. Location: At the Kentucky River Authority’s Lock and Dam No. 14, on the Kentucky River, near the Town of Heidelberg, Lee County Kentucky. No lands managed by the Federal government are located within the project boundary. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: David Brown Kinloch, Lock 14 Hydro Partners, 414 S. Wenzel Street, Louisville, Kentucky 40204, (502) 589–0975. i. FERC Contact: Michael Spencer, (202) 502–6093, michael.spencer@ ferc.gov. j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, recommendations, preliminary terms and conditions, and preliminary fishway prescriptions using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–13213–003. The Commission’s Rules of Practice and Procedures require all intervenors filing documents with the Commission PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 54641 to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing, but is not ready for environmental analysis at this time. l. The Heidelberg Project consists of: (1) An existing 248-foot-long, 17-foothigh concrete lock and dam; (2) an existing 182-acre reservoir having a storage capacity of 1,820-acre-feet; (3) a new 40-foot-high and 52-foot-wide trashrack; (4) a new powerhouse integral to the abandoned lock containing four generating units for a total installed capacity of 2,640 kilowatts; and (5) a new 1,000-foot-long, 12.47 kilo-Volt transmission line. The project is estimated to generate an average of 10,484,000 kilowatt-hours annually. The existing lock and dam are owned by the Kentucky River Authority. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice. E:\FR\FM\05SEN1.SGM 05SEN1 54642 Federal Register / Vol. 78, No. 172 / Thursday, September 5, 2013 / Notices Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions. All filings must: (1) Bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION,’’ or ‘‘COMPETING APPLICATION’’; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. Dated: August 28, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–21525 Filed 9–4–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13214–003] ehiers on DSK2VPTVN1PROD with NOTICES Lock 12 Hydro Partners; Notice of Application Accepted for Filing and Soliciting Motions to Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Major License (5 Megawatts or less). b. Project No.: 13214–003. c. Date filed: May 16, 2012. d. Applicant: Lock 12 Hydro Partners, LLC. VerDate Mar<15>2010 14:10 Sep 04, 2013 Jkt 229001 e. Name of Project: Ravenna Hydroelectric Project. f. Location: At the Kentucky River Authority’s Lock and Dam No. 12, on the Kentucky River, near the Town of Ravenna, Estill County Kentucky. No lands managed by the Federal government are located within the project boundary. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: David Brown Kinloch, Lock 12 Hydro Partners, 414 S. Wenzel Street, Louisville, Kentucky 40204, (502) 589–0975. i. FERC Contact: Michael Spencer, (202) 502–6093, michael.spencer@ ferc.gov. j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, recommendations, preliminary terms and conditions, and preliminary fishway prescriptions using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–13214–003. The Commission’s Rules of Practice and Procedures require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing, but is not ready for environmental analysis at this time. l. The Ravenna Project consists of: (1) An existing 240-foot-long, 17-foot-high concrete lock and dam; (2) an existing 345-acre reservoir having a storage capacity of 3,450-acre-feet; (3) a new 40foot-high and 52-foot-wide trashrack; (4) a new powerhouse within the abandoned lock chamber containing four generating units for a total installed PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 capacity of 2,640 kilowatts; and (5) a new 1,500-foot-long, 12.47 kilo-Volt transmission line. The project is estimated to generate an average of 10,673,000 kilowatt-hours annually. The existing lock and dam are owned by the Kentucky River Authority. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions. E:\FR\FM\05SEN1.SGM 05SEN1

Agencies

[Federal Register Volume 78, Number 172 (Thursday, September 5, 2013)]
[Notices]
[Pages 54641-54642]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-21525]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13213-003]


Lock 14 Hydro Partners; Notice of Application Accepted for Filing 
and Soliciting Motions to Intervene and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major License (5 Megawatts or less)
    b. Project No.: 13213-003
    c. Date filed: May 16, 2012
    d. Applicant: Lock 14 Hydro Partners, LLC
    e. Name of Project: Heidelberg Hydroelectric Project
    f. Location: At the Kentucky River Authority's Lock and Dam No. 14, 
on the Kentucky River, near the Town of Heidelberg, Lee County 
Kentucky. No lands managed by the Federal government are located within 
the project boundary.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: David Brown Kinloch, Lock 14 Hydro Partners, 
414 S. Wenzel Street, Louisville, Kentucky 40204, (502) 589-0975.
    i. FERC Contact: Michael Spencer, (202) 502-6093, 
michael.spencer@ferc.gov.
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, preliminary 
terms and conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-13213-003.
    The Commission's Rules of Practice and Procedures require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. This application has been accepted for filing, but is not ready 
for environmental analysis at this time.
    l. The Heidelberg Project consists of: (1) An existing 248-foot-
long, 17-foot-high concrete lock and dam; (2) an existing 182-acre 
reservoir having a storage capacity of 1,820-acre-feet; (3) a new 40-
foot-high and 52-foot-wide trashrack; (4) a new powerhouse integral to 
the abandoned lock containing four generating units for a total 
installed capacity of 2,640 kilowatts; and (5) a new 1,000-foot-long, 
12.47 kilo-Volt transmission line. The project is estimated to generate 
an average of 10,484,000 kilowatt-hours annually. The existing lock and 
dam are owned by the Kentucky River Authority.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) named in this 
public notice.

[[Page 54642]]

    Anyone may submit a protest or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210, 385.211, and 385.214. In determining the appropriate action to 
take, the Commission will consider all protests filed, but only those 
who file a motion to intervene in accordance with the Commission's 
Rules may become a party to the proceeding. Any protests or motions to 
intervene must be received on or before the specified deadline date for 
the particular application.
    When the application is ready for environmental analysis, the 
Commission will issue a public notice requesting comments, 
recommendations, terms and conditions, or prescriptions.
    All filings must: (1) Bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' or ``COMPETING APPLICATION''; (2) set forth in 
the heading the name of the applicant and the project number of the 
application to which the filing responds; (3) furnish the name, 
address, and telephone number of the person protesting or intervening; 
and (4) otherwise comply with the requirements of 18 CFR 385.2001 
through 385.2005. Agencies may obtain copies of the application 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application.

    Dated: August 28, 2013.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2013-21525 Filed 9-4-13; 8:45 am]
BILLING CODE 6717-01-P