Federal Register / Vol. 78, No. 172 / Thursday, September 5, 2013 / Notices
long earth fill dam located between the
non-overflow structure and the right
abutment; and (3) an existing
powerhouse containing 1 turbine with
an installed capacity of 46,944kilowatts. The applicant estimates that
the total average annual generation
would be 153,604,600 megawatthours.
All generated power is utilized within
the applicant’s electric utility system.
Additionally, Alabama Power proposes
correct the mapping of the project
boundary from 46.59 acres to 50.08
acres. The change would affect privately
owned lands, resulting in no land
disturbing activities.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made
as appropriate.
Issue Notice of Acceptance
or Deficiency Letter.
Issue Scoping Document 1
Issue Scoping Document 2
Issue notice of ready for environmental analysis.
Issue draft EA ......................
ehiers on DSK2VPTVN1PROD with NOTICES
Issue Final EA .....................
November
2013.
December
2013.
February 2014.
March 2014.
September
2014.
December
2014.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: August 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–21526 Filed 9–4–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
14:10 Sep 04, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13213–003]
Lock 14 Hydro Partners; Notice of
Application Accepted for Filing and
Soliciting Motions to Intervene and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major License
(5 Megawatts or less)
b. Project No.: 13213–003
c. Date filed: May 16, 2012
d. Applicant: Lock 14 Hydro Partners,
LLC
e. Name of Project: Heidelberg
Hydroelectric Project
f. Location: At the Kentucky River
Authority’s Lock and Dam No. 14, on
the Kentucky River, near the Town of
Heidelberg, Lee County Kentucky. No
lands managed by the Federal
government are located within the
project boundary.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: David Brown
Kinloch, Lock 14 Hydro Partners, 414 S.
Wenzel Street, Louisville, Kentucky
40204, (502) 589–0975.
i. FERC Contact: Michael Spencer,
(202) 502–6093, michael.spencer@
ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13213–003.
The Commission’s Rules of Practice
and Procedures require all intervenors
filing documents with the Commission
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
54641
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The Heidelberg Project consists of:
(1) An existing 248-foot-long, 17-foothigh concrete lock and dam; (2) an
existing 182-acre reservoir having a
storage capacity of 1,820-acre-feet; (3) a
new 40-foot-high and 52-foot-wide
trashrack; (4) a new powerhouse integral
to the abandoned lock containing four
generating units for a total installed
capacity of 2,640 kilowatts; and (5) a
new 1,000-foot-long, 12.47 kilo-Volt
transmission line. The project is
estimated to generate an average of
10,484,000 kilowatt-hours annually. The
existing lock and dam are owned by the
Kentucky River Authority.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
E:\FR\FM\05SEN1.SGM
05SEN1
54642
Federal Register / Vol. 78, No. 172 / Thursday, September 5, 2013 / Notices
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
All filings must: (1) Bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ or ‘‘COMPETING
APPLICATION’’; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
Dated: August 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–21525 Filed 9–4–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13214–003]
ehiers on DSK2VPTVN1PROD with NOTICES
Lock 12 Hydro Partners; Notice of
Application Accepted for Filing and
Soliciting Motions to Intervene and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major License
(5 Megawatts or less).
b. Project No.: 13214–003.
c. Date filed: May 16, 2012.
d. Applicant: Lock 12 Hydro Partners,
LLC.
VerDate Mar<15>2010
14:10 Sep 04, 2013
Jkt 229001
e. Name of Project: Ravenna
Hydroelectric Project.
f. Location: At the Kentucky River
Authority’s Lock and Dam No. 12, on
the Kentucky River, near the Town of
Ravenna, Estill County Kentucky. No
lands managed by the Federal
government are located within the
project boundary.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: David Brown
Kinloch, Lock 12 Hydro Partners, 414 S.
Wenzel Street, Louisville, Kentucky
40204, (502) 589–0975.
i. FERC Contact: Michael Spencer,
(202) 502–6093, michael.spencer@
ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13214–003.
The Commission’s Rules of Practice
and Procedures require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The Ravenna Project consists of: (1)
An existing 240-foot-long, 17-foot-high
concrete lock and dam; (2) an existing
345-acre reservoir having a storage
capacity of 3,450-acre-feet; (3) a new 40foot-high and 52-foot-wide trashrack; (4)
a new powerhouse within the
abandoned lock chamber containing
four generating units for a total installed
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
capacity of 2,640 kilowatts; and (5) a
new 1,500-foot-long, 12.47 kilo-Volt
transmission line. The project is
estimated to generate an average of
10,673,000 kilowatt-hours annually. The
existing lock and dam are owned by the
Kentucky River Authority.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
E:\FR\FM\05SEN1.SGM
05SEN1
Agencies
[Federal Register Volume 78, Number 172 (Thursday, September 5, 2013)]
[Notices]
[Pages 54641-54642]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-21525]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13213-003]
Lock 14 Hydro Partners; Notice of Application Accepted for Filing
and Soliciting Motions to Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major License (5 Megawatts or less)
b. Project No.: 13213-003
c. Date filed: May 16, 2012
d. Applicant: Lock 14 Hydro Partners, LLC
e. Name of Project: Heidelberg Hydroelectric Project
f. Location: At the Kentucky River Authority's Lock and Dam No. 14,
on the Kentucky River, near the Town of Heidelberg, Lee County
Kentucky. No lands managed by the Federal government are located within
the project boundary.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: David Brown Kinloch, Lock 14 Hydro Partners,
414 S. Wenzel Street, Louisville, Kentucky 40204, (502) 589-0975.
i. FERC Contact: Michael Spencer, (202) 502-6093,
michael.spencer@ferc.gov.
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, recommendations, preliminary
terms and conditions, and preliminary fishway prescriptions using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-13213-003.
The Commission's Rules of Practice and Procedures require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted for filing, but is not ready
for environmental analysis at this time.
l. The Heidelberg Project consists of: (1) An existing 248-foot-
long, 17-foot-high concrete lock and dam; (2) an existing 182-acre
reservoir having a storage capacity of 1,820-acre-feet; (3) a new 40-
foot-high and 52-foot-wide trashrack; (4) a new powerhouse integral to
the abandoned lock containing four generating units for a total
installed capacity of 2,640 kilowatts; and (5) a new 1,000-foot-long,
12.47 kilo-Volt transmission line. The project is estimated to generate
an average of 10,484,000 kilowatt-hours annually. The existing lock and
dam are owned by the Kentucky River Authority.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified intervention
deadline date, a competing development application, or a notice of
intent to file such an application. Submission of a timely notice of
intent allows an interested person to file the competing development
application no later than 120 days after the specified intervention
deadline date. Applications for preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
[[Page 54642]]
Anyone may submit a protest or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210, 385.211, and 385.214. In determining the appropriate action to
take, the Commission will consider all protests filed, but only those
who file a motion to intervene in accordance with the Commission's
Rules may become a party to the proceeding. Any protests or motions to
intervene must be received on or before the specified deadline date for
the particular application.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must: (1) Bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' or ``COMPETING APPLICATION''; (2) set forth in
the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. Agencies may obtain copies of the application
directly from the applicant. A copy of any protest or motion to
intervene must be served upon each representative of the applicant
specified in the particular application.
Dated: August 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-21525 Filed 9-4-13; 8:45 am]