Report to Congress on Abnormal Occurrences: Fiscal Year 2012, Revision 1; Dissemination of Information, 54493-54502 [2013-21477]
Download as PDF
Federal Register / Vol. 78, No. 171 / Wednesday, September 4, 2013 / Notices
characteristics (mainly slope) making it
very suitable for calibrating the laser
altimeters that will be on NASA’s
ICESat–2.
The desired flight lines cross small
portions of the Barwick Valley Antarctic
Specially Protected Area, and the
management prohibits overflight at
altitudes less than 2500 ft. NASA is
seeking a permit to fly through ASPA
123 six times at an altitude of 1500 ft.
or higher. While flying over the ASPA,
NASA will be using airplane mounted
instruments to collect laser, radar,
gravity, and magnetic data and aerial
photography. There is no plan to land
the aircraft in the ASPA and data
collection would not disturb the ground
surface in the ASPA.
Location
ASPA 123 Barwick and Balham
Valleys
Dates
October 26, 2013 to November 30,
2013
Nadene G. Kennedy,
Polar Coordination Specialist, Division of
Polar Programs.
[FR Doc. 2013–21444 Filed 9–3–13; 8:45 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2013–0094]
tkelley on DSK3SPTVN1PROD with NOTICES
Report to Congress on Abnormal
Occurrences: Fiscal Year 2012,
Revision 1; Dissemination of
Information
Section 208 of the Energy
Reorganization Act of 1974 (Pub. L. 93–
438) defines an abnormal occurrence
(AO) as an unscheduled incident or
event that the U.S. Nuclear Regulatory
Commission (NRC) determines to be
significant from the standpoint of public
health or safety. The Federal Reports
Elimination and Sunset Act of 1995
(Pub. L. 104–68) requires that AOs be
reported to Congress annually. During
Fiscal Year (FY) 2012, 22 events that
occurred at facilities licensed by the
NRC and/or Agreement States were
determined to be AOs.
This report describes four events at
NRC-licensed facilities. The first event
at an NRC-licensed facility was an
occurrence at a commercial nuclear
power plant and the other three events
occurred at NRC-licensed medical
institutions and are medical events as
defined in part 35 of Title 10 of the
Code of Federal Regulations (10 CFR).
The report also describes 18 events at
VerDate Mar<15>2010
16:51 Sep 03, 2013
Jkt 229001
Agreement State-licensed facilities.
Agreement States are the 37 States that
currently have entered into formal
agreements with the NRC pursuant to
Section 274 of the Atomic Energy Act
(AEA) to regulate certain quantities of
AEA-licensed material at facilities
located within their borders. The first
Agreement State-licensee event
involved radiation exposure to an
embryo/fetus, and the second event
involved an exposure to a radiographer.
The other 16 Agreement State-licensee
events were medical events as defined
in 10 CFR part 35 and occurred at
medical institutions. As required by
Section 208, the discussion for each
event includes the date and place, the
nature and probable consequences, the
cause or causes, and the actions taken
to prevent recurrence. Each event is also
described in NUREG–0090, Volume 35,
‘‘Report to Congress on Abnormal
Occurrences: Fiscal Year 2012,’’ issued
May 2013 (ADAMS Accession No.
ML13149A083). The report was revised
to include editorial corrections and
reissued in August 2013 as NUREG–
0090, Volume 35, Revision 1, ‘‘Report to
Congress on Abnormal Occurrences:
Fiscal Year 2012’’ (ADAMS Accession
No. ML13225A395). This report is
available electronically at the NRC’s
Web site at https://www.nrc.gov/readingrm/doc-collections/nuregs/staff/.
Three major categories of events are
reported in this document—I. For All
Licensees, II. For Commercial Nuclear
Power Plant Licensees, and III. Events at
Facilities Other Than Nuclear Power
Plants and All Transportation Events.
The full report, which is available on
the NRC’s Web site, provides the
specific criteria for determining when
an event is an AO. It also discusses
‘‘Other Events of Interest,’’ which do not
meet the AO criteria but have been
determined by the Commission to be
included in the report. The event
identification number begins with ‘‘AS’’
for Agreement State AO events and
‘‘NRC’’ for NRC AO events.
I. For All Licensees
A. Human Exposure to Radiation From
Licensed Material
During this reporting period, two
events involving Agreement Statelicensees were significant enough to be
reported as AOs. Although one of these
events occurred at a medical facility, it
involved unintended exposure of an
individual who was not the patient.
Therefore, this event belongs under the
Criterion I.A, ‘‘For All Licensees’’
category, as opposed to the Criterion
III.C, ‘‘Medical Licensees’’ category.
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
54493
AS12–01 Embryo/Fetus Exposure to
Radiation at Lankenau Hospital in
Wynnewood, Pennsylvania
Date and Place—October 6, 2011,
Wynnewood, PA.
Nature and Probable Consequences—
Lankenau Hospital (the licensee)
reported that a patient received 2.7
gigabecquerel (GBq) (73.7 millicuries
(mCi)) of iodine-131 for thyroid ablation
therapy. Before the treatment, the
patient informed the licensee that she
was not pregnant, and was administered
a pregnancy test as a routine precaution.
The pregnancy test yielded a negative
result. Therefore, the licensee
administered iodine-131 to the patient.
On October 26, 2011, the patient
became aware that she was pregnant.
The licensee contacted the patient’s
obstetrician/gynecologist and was
informed that an ultrasound confirmed
that she was approximately 10 days
pregnant at the time of the iodine-131
treatment. The NRC contracted a
medical consultant, who estimated a
fetal or embryo dose of 174 mSv (17.4
rem) and stated that embryonic tissue
capable of concentrating iodine-131 is
not formed until 10 to 12 weeks of
gestation; therefore, this tissue had not
yet formed at the time of the treatment.
The medical consultant concluded that
there was a low possibility of
carcinogenesis or malformations.
Cause(s)—The cause of this event was
the inability of the pregnancy test to
provide a positive determination of
pregnancy in close proximity to
conception.
Actions Taken To Prevent Recurrence
Licensee—The licensee assessed the
event and determined that it is
following best practices by ordering a
pregnancy test and relying on its results.
State—The Pennsylvania Department
of Environmental Protection (PA DEP)
conducted a followup inspection to
review this incident and collect
information from the medical consultant
and the licensee to complete this
review. PA DEP has no further action
planned for this event.
AS12–02 Human Exposure to
Radiation at Non-Destructive Inspection
Corporation, in Pasadena, Texas
Date and Place—March 24, 2012,
Pasadena, TX.
Nature and Probable Consequences—
The Non-Destructive Inspection
Corporation (the licensee) reported that
a radiographer received a total effective
dose equivalent (TEDE) of 293.2 mSv
(29.3 rem). The licensee reported that
the drive cable of a radiography camera
containing 2.41 terabecquerels (TBq)
E:\FR\FM\04SEN1.SGM
04SEN1
54494
Federal Register / Vol. 78, No. 171 / Wednesday, September 4, 2013 / Notices
(65.1 curies (Ci)) of iridium-192 broke,
and the source pigtail disconnected
from the drive cable inside the source
guide tube. The radiographer trainer
disconnected the source guide tube from
the exposure device and placed it
around his neck while he climbed down
the ladder of a scaffold. The source was
in the guide tube at that time, but its
location within the guide tube is
uncertain. When the radiographer
trainer reached the platform he removed
the guide tube from his neck. He then
noted that the other radiographer was
having problems disconnecting the
crank assembly from the exposure
device and that the exposure device
locking mechanism was still unlocked.
Radiation surveys were performed of
the exposure device and source guide
tube. Radiation levels revealed that the
source was within the guide tube. The
radiographer trainer picked up the guide
tube with long tongs and the source fell
out of the guide tube onto the floor. An
authorized individual responded to the
site and performed source retrieval. The
radiographer trainer’s film badge was
processed and read 0.812 mSv (81.2
mrem). During event reenactment, it
was determined that the source guide
tube was around the radiographer
trainer’s neck for approximately 35
seconds. The licensee calculated and
assigned an estimated TEDE dose of
293.2 mSv (29.3 rem). The event was
reported as a Level 2 (incident) on the
International Atomic Energy Agency’s
International Nuclear and Radiological
Event Scale (INES).
Cause(s)—The cause of this event was
corrosion of the drive cable and
improper maintenance coupled with the
failure of the operators to perform the
proper radiation surveys.
tkelley on DSK3SPTVN1PROD with NOTICES
Actions Taken To Prevent Recurrence
Licensee—The corrective action taken
by the licensee included a complete
cessation of operations and review of
the incident with every radiographer in
the company; and an inspection of all of
the licensee’s equipment, with
replacement as needed. The
radiographer trainer was retrained and
re-tested. The licensee stated it will
incorporate routine equipment
maintenance and inspections performed
by the manufacturer.
State—The Texas Department of State
Health Services (DSHS) collected
information from the licensee, including
medical surveillance information, and
completed its review of the event and
the licensee’s corrective actions. The
DSHS cited both the licensee and
radiographer trainer with several
violations associated with this event.
VerDate Mar<15>2010
16:51 Sep 03, 2013
Jkt 229001
II. Commercial Nuclear Power Plant
Licensees
During this reporting period, one
event at a commercial nuclear power
plant in the United States was
significant enough to be reported as an
AO.
NRC12–01 Commercial Nuclear Power
Plant Event at Fort Calhoun Station,
Unit 1, in Fort Calhoun, Nebraska
Date and Place—June 7, 2011, Fort
Calhoun, NE.
Nature and Probable Consequences—
The Omaha Public Power District
(OPPD) (the licensee) reported a
commercial nuclear power plant event
at Fort Calhoun Station (FCS), Unit 1, a
single pressurized-water reactor
designed by Combustion Engineering.
On June 7, 2011, a fire started in a
recently replaced safety-related
electrical breaker in an electrical
switchgear room at the plant. The fire
resulted in FCS declaring an alert
because the fire impacted safety-related
equipment. The catastrophic failure of
the replacement breaker and subsequent
fire resulted in a large quantity of soot
and smoke. The soot and smoke were
sufficiently conductive that arcing
occurred and the feeder breaker for the
redundant train of electrical switchgear
tripped. Operators took action to isolate
equipment potentially affected by the
fire. The event resulted in the loss of the
spent fuel pool cooling function and
could have resulted in the loss of a
safety function or multiple failures in
systems used to mitigate an event had
the event occurred while the plant was
operating at power. The reactor was
shutdown at the time of the fire.
The NRC determined that the event
represented a finding of high safety
significance (red finding). The basis for
this determination was the high fire
frequency given the short period of time
that the replacement breaker had been
in service, the significant damage
caused by the failure, and the fact that
the event affected both trains of safety
equipment. The public was never
endangered because the plant was in
cold shutdown for a planned refueling
outage at the time of the fire.
Significantly less safety equipment is
required in this plant condition to safely
cool the fuel. However, had this event
occurred while the plant was operating
at power, the response to the event
would have been much more complex.
Cause(s)—The direct cause of the fire
was the high electrical resistance of the
replacement breaker and the lack of
proper cleaning and tightening of the
electrical switchgear. Additionally, the
area of the electrical connection was
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
found to be full of hardened grease and
copper oxide because of poor electrical
maintenance practices by the licensee.
Actions Taken To Prevent Recurrence
Licensee—As a result of the event and
other factors, OPPD has maintained FCS
in a shutdown condition. Through its
root cause analysis process, the licensee
preliminarily determined that a wiring
discrepancy caused the fire to spread to
the opposite safety-related electrical
train. The licensee also performed
checks to ensure the wiring discrepancy
is no longer present in the plant on the
replacement equipment or other similar
equipment.
NRC—The NRC transitioned FCS
oversight from that described in
Inspection Manual Chapter (IMC) 0305,
‘‘Operating Reactor Assessment
Program,’’ to that described in IMC
0350, ‘‘Oversight of Reactor Facilities in
a Shutdown Condition due to
Significant Performance and/or
Operational Concerns.’’ The IMC 0350
process for FCS was implemented to:
• Establish a regulatory oversight
framework as a result of significant
performance problems and a significant
operational event.
• Ensure the NRC communicates a
unified and consistent position in a
clear and predictable manner.
• Establish a record of actions taken
and technical issues resolved.
• Verify that corrective actions are
sufficient for restart.
• Provide assurance that, following
restart, the plant will be operated in a
manner that provides for adequate
protection of public health and safety.
On February 26, 2013, the NRC issued
a revised Confirmatory Action Letter
(CAL) (EA–13–020) ‘‘Confirmatory
Action Letter—Fort Calhoun Station,’’
(available at the NRC’s Agencywide
Documents Access and Management
System (ADAMS) Accession No.
ML13057A287) to confirm those actions
that the NRC determined will need
review or inspection before the restart of
the plant. This revision supplemented
two previously issued confirmatory
action letters (ADAMS Accession Nos.
ML112490164 and ML12163A287) that
confirmed actions that were necessary
prior to restart. This revision was issued
to incorporate three additional items to
the Restart Checklist, that relate to (1)
qualifications for containment electrical
penetrations, (2) containment internal
structure deficiencies, and (3) a number
of safety system functional failures
resulting in the associated performance
indicator crossing into the white
threshold. Prior to the NRC terminating
the CAL and allowing FCS to restart, the
NRC will verify that the licensee’s
E:\FR\FM\04SEN1.SGM
04SEN1
Federal Register / Vol. 78, No. 171 / Wednesday, September 4, 2013 / Notices
corrective actions adequately address all
of the items detailed on the restart
checklist.
III. Events At Facilities Other Than
Nuclear Power Plants and All
Transportation Events
C. Medical Licensees
During this reporting period, three
events at NRC licensees and 16 events
at Agreement State-licensees were
significant enough to be reported as
AOs.
AS12–03 Medical Event at Greenville
Memorial Hospital in Greenville, South
Carolina
Date and Place—September 15, 2009,
Greenville, SC.
Nature and Probable Consequences—
Greenville Memorial Hospital (the
licensee) reported that a medical event
occurred associated with a
radioembolization brachytherapy
treatment for liver cancer involving 1.7
GBq (45.9 mCi) of yttrium-90. The
patient was prescribed to receive a total
dose of approximately 13 Gy (1,300 rad)
to the liver, but instead received a dose
of approximately 26 Gy (2,600 rad) to
the liver. This delivered dosage was
approximately 100 percent greater than
the prescribed dosage to the patient. The
patient and referring physician were
informed of this event.
On September 17, 2009, the licensee
notified the South Carolina Department
of Health and Environmental Control
that following an infusion of radioactive
yttrium-90, a postprocedure record
review revealed that the patient was
administered 1.7 GBq (45.9 mCi) of
yttrium-90 versus the prescribed dose of
0.94 GBq (25.4 mCi). Upon
investigation, it was discovered by the
licensee that errors occurred both while
preparing the treatment and estimating
the activity from the written directive.
Upon medical followup, the patient had
good tumor response with no adverse
medical effects.
Cause(s)—The cause of the medical
event was human error in failing to
administer the correct activity as stated
on the written directive.
tkelley on DSK3SPTVN1PROD with NOTICES
Actions Taken To Prevent Recurrence
Licensee—The licensee corrective
actions included: (1) Mandatory
refresher training for all participants in
this event, (2) implementation of a
requirement to confirm the prescribed
dose by two nuclear medicine
technologists prior to administration, (3)
implementation of a requirement for the
written directive to be typed or printed
with the dose amount highlighted, and
(4) discussion of the event and
VerDate Mar<15>2010
16:51 Sep 03, 2013
Jkt 229001
corrective actions at the next meeting of
the Radiation Safety Committee.
State—The South Carolina
Department of Health and
Environmental Control conducted an
investigation on September 17, 2009,
and determined that no items of noncompliance were noted. The State
forwarded the final update of this event
to the NRC on October 18, 2012.
AS12–04 Medical Event at the Duke
University Medical Center in Durham,
North Carolina
Date and Place—October 22, 2010,
Durham, NC.
Nature and Probable Consequences—
Duke University Medical Center (the
licensee) reported that a medical event
occurred associated with a high dose
rate (HDR) endobronchial brachytherapy
treatment for small cell lung cancer. The
treatment involved the use of 199.8 GBq
(5.4 Ci) of iridium-192 split between
two treatment catheters. The patient was
prescribed to receive two doses of 10 Gy
(1,000 rad) for a total dose of 20 Gy
(2,000 rad) to the tumor site. However,
the direction of the catheters was
reversed during treatment, resulting in a
dose of 20 Gy (2,000 rad) to the voice
box (wrong treatment site). The patient
and referring physician were informed
of this event.
On October 22, 2010, the medical staff
initially identified the locations of the
two treatment catheters using computed
tomography (CT) images. During the
treatment, the direction of the catheters
was mistakenly reversed. This changed
the starting position of the HDR source
and resulted in the dose being delivered
to the voice box rather than the targeted
treatment site on the left side of the
patient’s airway. The patient exhibited
minor swelling of the voice box, but no
airway compromise, hoarseness,
shortness of breath, or painful
swallowing. The licensee concluded
that the medical event would not have
a significant medical effect on the
patient. The patient was subsequently
given the correct total dose in a
followup treatment.
Cause(s)—The cause of the medical
event was human error in that the
oncology staff failed to correctly place
and verify the position of the two
treatment catheters. A contributing
factor to the cause of the event is that
the oncology staff infrequently uses two
catheters to simultaneously deliver
doses during HDR treatments.
Actions Taken To Prevent Recurrence
Licensee—The licensee’s corrective
actions included: (1) A root-cause
analysis of the event, (2) development of
a more detailed standard operational
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
54495
procedure for this type of treatment, (3)
a revised HDR patient quality assurance
form to include extra levels of
verification, and (4) a new verification
procedure. The licensee also provided
training on the revised procedures for
all radiation oncology staff approved to
conduct HDR therapy.
State—The North Carolina Division of
Radiation Protection conducted an
investigation on December 14, 2010, and
identified several procedural
weaknesses in the licensee’s HDR
program. One item of noncompliance
was issued and the State forwarded the
final update of this event to the NRC on
November 28, 2012.
AS12–05 Medical Events at Our Lady
of Bellefonte Hospital in Ashland,
Kentucky
Date and Place—October 3, 2001
through February 24, 2009 (reported on
December 13, 2010), Ashland, KY.
Nature and Probable Consequences—
The Kentucky Department of Public
Health (KDPH) identified a medical
event at Our Lady of Bellefonte Hospital
(the licensee) associated with a
brachytherapy seed implant procedure
to treat prostate cancer. The patient was
prescribed to receive a total dose of
132.8 Gy (13,280 rad) to the prostate
using 105 palladium-103 seeds, but
instead the patient received an
approximate dose of 131 Gy (13,100 rad)
to the penile bulb (glans) (wrong
treatment site). The patient and referring
physician were not informed of this
event because the licensee believed that
the treatment was satisfactory. However,
the patient was subsequently informed
of this event during a consultation at
another medical treatment facility.
The licensee was unable to perform a
dose assessment of the affected tissue
due to the radiation oncologist’s
inadequate postprocedure seed implant
records. The patient sought a second
opinion from a different radiation
oncologist, who performed a CT scan of
the treatment site. Based on the results
of this CT scan, the second radiation
oncologist determined that the penile
bulb received the majority of the
prescribed dose. On November 30, 2010,
KDPH investigated this event and the
licensee’s entire prostate brachytherapy
treatment program. The KDPH
discovered 34 additional cases of
improper prostate seed implantation
performed by the same radiation
oncologist between October 3, 2001, and
February 24, 2009. The KDPH
documented procedural violations by
the radiation oncologist including
written directives not containing the
prescribed or delivered doses, no
E:\FR\FM\04SEN1.SGM
04SEN1
54496
Federal Register / Vol. 78, No. 171 / Wednesday, September 4, 2013 / Notices
records of postprocedure implant doses,
and the lack of postprocedure CT scans.
Cause(s)—The cause of the medical
events was human error in the failure of
the radiation oncologist to follow the
licensee’s procedures and the failure of
the licensee to maintain oversight of its
brachytherapy program.
tkelley on DSK3SPTVN1PROD with NOTICES
Actions Taken To Prevent Recurrence
Licensee—The corrective actions
taken by the licensee included
providing personnel with additional
training, permanently suspending the
brachytherapy program, and removing
the radiation oncologist who performed
the implant procedures from the license.
State—The KDPH conducted an
extensive investigation from November
30, 2010 through November 2, 2012, and
cited the licensee for numerous
violations in the oversight of its manual
brachytherapy program. Additionally,
the Kentucky Medical Board
investigated the radiation oncologist for
infractions that resulted in rescinding
the Kentucky medical license.
AS12–06 Medical Event at Banner
Good Samaritan Medical Center in
Phoenix, Arizona.
Date and Place—December 22, 2010,
Phoenix, AZ
Nature and Probable Consequences—
Banner Good Samaritan Medical Center
(the licensee) reported that a medical
event occurred associated with an HDR
mammosite treatment for breast cancer,
involving approximately 139.5 GBq (3.8
Ci) of iridium-192. The patient was
prescribed to receive a total dose of 34
Gy (3,400 rad) in 10 fractionated doses
to the left breast; however, on the ninth
treatment, a kink in one of the catheters
apparently caused the source to punch
through the catheter and slide along the
skin tissue of the left breast. The patient
received a dose of 20 Gy (2,000 rad) to
the skin of the left breast (wrong
treatment site). The patient and referring
physician were informed of this event.
In preparation for the seventh
treatment, the licensee had difficulty in
attaching the transfer tube to the HDR
unit, and one catheter kinked. During
attempts to straighten and re-attach the
transfer tube, the catheter broke off
completely. The licensee used a
technique that it developed to repair the
catheter and test its integrity since the
manufacturer provides no specific
recommendations on how to deal with
damaged catheters. In addition, the
licensee determined that repairing the
catheter was the best option, versus
risking the surgical procedure to replace
the catheter. During the ninth treatment,
the patient reported a sensation of
electricity on her left breast during the
VerDate Mar<15>2010
16:51 Sep 03, 2013
Jkt 229001
positioning of the source in one of the
catheters. The remaining catheter
treatment was completed without
further complaints by the patient and
the sources were retracted into the
normal shielded position. On January 3,
2011, the prescribing physician noted
very faint erythema over the
lumpectomy site and no evidence of
erythema where the source had been in
contact with the skin. Later ulcerations
developed and healed without further
complication. The licensee concluded
that there did not appear to be any skin
effects from the ruptured catheter, and
the patient gradually improved over
time.
Cause(s)—The cause of the medical
event was a material problem with the
repaired catheter and ineffective
procedures for handling a damaged
catheter.
Actions Taken To Prevent Recurrence
Licensee—Corrective actions included
changes to the licensee’s procedures so
that the entrance site and catheters will
be visible by camera and that the
treatment will be interrupted upon any
abnormal observation or response from
the patient. In addition, the licensee
procedures were revised so that if
kinking or damage to a catheter is
observed and the catheter shows any
signs of weakening, the device will be
replaced.
State—The Arizona Radiation
Regulatory Agency conducted an
investigation and determined that the
licensee’s corrective actions were
adequate. No enforcement action was
taken, and the State forwarded the final
update of the event to the NRC on May
1, 2012.
AS12–07 Medical Event at Highlands
Regional Medical Center in
Prestonsburg, Kentucky
Date and Place—March 17, 2009
(reported on January 14, 2011),
Prestonsburg, KY.
Nature and Probable Consequences—
The KDPH performed an inspection of
Highlands Regional Medical Center (the
licensee) manual brachytherapy
program on January 14, 2011. The KDPH
identified one of the licensee’s
authorized users, a radiation oncologist,
who the KDPH investigated in prostate
brachytherapy seed implant AO medical
events at Our Lady of Bellefonte
Hospital in Ashland, Kentucky (AS12–
05). The KDPH discovered that on
March 17, 2009, a patient prescribed to
receive 100 Gy (10,000 rad) to the
prostate instead received a dose of 160.8
Gy (16,080 rad). This delivered dosage
was approximately 60 percent greater
than the prescribed dosage to the
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
patient. The KDPH documented
procedural violations by the radiation
oncologist including written directives
not containing the prescribed or
delivered doses, no records of
postprocedure implant doses, and the
lack of postprocedure CT scans. The
patient and referring physician were not
informed of this event because the
licensee believed that the treatment was
satisfactory.
The KDPH uncovered two additional
improper prostate seed implantation
events at the licensee’s facility
performed by the same radiation
oncologist. These two additional events
occurred between February 28, 2008,
and April 3, 2008, and in both events
the patients received less than the dose
prescribed for the treatment. However,
because of the radiation oncologist’s
inadequate postprocedure implantation
records, final dose assessments of these
events cannot be performed. The
licensee’s lack of oversight of the
manual brachytherapy program caused
these events to be undetected until the
KDPH inspection.
Cause(s)—The cause of the medical
event was human error in the failure of
the radiation oncologist to follow the
licensee’s procedures and the failure of
the licensee to maintain oversight of
their brachytherapy program.
Actions Taken To Prevent Recurrence
Licensee—The licensee’s corrective
actions included providing personnel
with additional training and removing
the radiation oncologist who performed
the implant procedures from the license.
Additionally, the licensee’s manual
brachytherapy program has been
suspended until the licensee can
demonstrate complete regulatory
oversight and compliance with
Kentucky regulations.
State—The KDPH conducted an
extensive investigation from January 14,
2011 through November 28, 2012, and
cited the licensee for numerous
violations in the oversight of its manual
brachytherapy program. Additionally,
the Kentucky Medical Board
investigated the radiation oncologist for
infractions that resulted in rescinding
the Kentucky medical license.
AS12–08 Medical Event at Eastern
Regional Medical Center in
Philadelphia, Pennsylvania
Date and Place—January 19, 2011,
Philadelphia, PA
Nature and Probable Consequences—
Eastern Regional Medical Center (the
licensee) reported that a medical event
occurred associated with a
radioembolization brachytherapy
treatment for liver cancer involving 1.42
E:\FR\FM\04SEN1.SGM
04SEN1
Federal Register / Vol. 78, No. 171 / Wednesday, September 4, 2013 / Notices
GBq (38.3 mCi) of yttrium-90. The
patient was prescribed to receive a total
dose of 117 Gy (11,700 rad) to the left
lobe of the liver, but instead received an
approximate dose of 257 Gy (25,700
rad). This delivered dosage was about
120 percent greater than the prescribed
dosage. The patient and referring
physician were informed of this event.
On January 19, 2011, during a formal
review, the licensee noted that the
activity delivered to the left lobe of the
liver was different than the activity that
was prescribed by the doctor. Upon
investigation, it was determined that a
transcription error occurred while
preparing the order form. The error was
not recognized upon receipt of the
yttrium-90, because the received
amount of yttrium-90 was compared to
the amount listed on the order form
rather than the amount prescribed on
the written directive. The licensee
concluded that this elevated dose may
result in an increased risk of atrophy to
the left lobe of the liver.
Cause(s)—The cause of the medical
event was human error in failing to
correctly transcribe the activity from the
written directive to the order form.
tkelley on DSK3SPTVN1PROD with NOTICES
Actions Taken To Prevent Recurrence
Licensee—The licensee’s corrective
actions included the generation of a
computer spreadsheet that populates
fields based on initial calculations,
written directives and the order form. In
addition, several procedure
modifications were implemented to
ensure the correct dosage is ordered and
received.
State—The PA DEP conducted a
reactive investigation on January 25,
2011, and identified one violation. The
PA DEP inspectors determined that the
licensee failed to implement the
procedures developed to provide high
confidence that each yttrium-90
microspheres treatment was in
accordance with the written directive.
Specifically, the licensee’s staff did not
verify that the activity determined with
a dose calibrator was within 10 percent
of the prescribed activity on the written
directive, nor were the decay
calculations used to check that the
activity at the time of treatment was as
prescribed on the written directive.
AS12–09 Medical Event at the
University of Colorado Hospital in
Aurora, Colorado
Date and Place—July 8, 2011, Aurora,
CO
Nature and Probable Consequences—
University of Colorado Hospital (the
licensee) reported that a medical event
occurred associated with a patient
receiving treatment for Graves Disease.
VerDate Mar<15>2010
16:51 Sep 03, 2013
Jkt 229001
The patient was prescribed to receive a
total dose of approximately 340 Gy
(34,000 rad) to the thyroid gland using
740 MBq (20 mCi) of iodine-131, instead
the patient received 3,748 MBq (101.3
mCi) of iodine-131 resulting in a dose of
approximately 1,722 Gy (172,200 rad).
This dosage was in excess of 400
percent greater than the prescribed
dosage to the patient. The patient and
referring physician were informed of
this event.
On July 8, 2011, the licensee reported
to the Colorado Department of Health
that a patient received the wrong dose
of iodine-131. The licensee stated that
the authorized user (AU) reviewed the
procedure with the patient and then left
the written directive and all associated
paperwork with the technologists. The
technologist who was administering the
iodine-131 to the patient incorrectly
assumed that the patient was receiving
treatment for cancer and did not review
the written directive. The technologist
then decided to use a therapeutic dosage
of iodine-131, which was intended and
labeled for another patient. The AU
discovered this error later that day,
when they attempted to administer the
therapeutic dosage of iodine-131 to the
intended patient. On November 10,
2011, and February 8, 2012, the licensee
reported that the patient’s thyroid
function tests indicated a normal
thyroid function with a small interval
change suggesting the patient is
becoming hypothyroid. The difference
in the incorrectly administered iodine131 dosage is expected to cause
hypothyroidism in the patient and
result in the patient needing
replacement thyroid hormone therapy.
A less likely possibility is that patient’s
hyperthyroidism will reoccur and will
need an additional dose of iodine-131.
Cause(s)—The cause of the medical
event was human error in that the
technologist did not properly review the
written directive and label on the
iodine-131 dose.
Actions Taken To Prevent Recurrence
Licensee—The licensee’s corrective
actions included the immediate
suspension of the technician from active
duty and an investigation, followed by
procedure additions—including
corroboration by two individuals for
therapy doses. The technician was
eventually allowed to return to work,
but under the direct supervision of the
lead technologist or supervisor.
State—The Colorado Department of
Public Health and Environment
(CDPHE) conducted interviews of the
licensee’s staff and reviewed the
licensee’s written report in July 2011.
The CDPHE issued a notice of violation
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
54497
(NOV) on August 17, 2011, and a
followup Compliance Order on Consent
on June 29, 2012.
AS12–10 Medical Event at the Medical
Center at Bowling Green in Bowling
Green, Kentucky
Date and Place—November 16, 2011,
Bowling Green, KY.
Nature and Probable Consequences—
The Medical Center at Bowling Green
(the licensee) reported a medical event
associated with a brachytherapy seed
implant procedure to treat prostate
cancer. The licensee scheduled back-toback seed implant procedures, on
consecutive days, for two patients who
were prescribed a dose of 145 Gy
(14,500 rad) to the prostate using 79
iodine-125 seeds. The licensee planned
separate seed implant procedures for
each patient and used the first patient’s
plan to correctly implant the seeds in
the first patient. However, the licensee
inadvertently reused the placement
procedure for the first patient while
placing the seeds in the second patient.
This resulted in the incorrect placement
of the seeds in the second patient and
a dose to the urethra (wrong treatment
site) of 310 Gy (31,000 rad). The second
patient and referring physician were
informed of this event.
On November 17, 2011, the licensee
notified the KDPH that the wrong
permanent prostate brachytherapy
implant treatment plan was used on a
patient. The radiation oncologist
identified the discrepancy immediately
upon completion of the seed implants
on the second patient. A postprocedure
CT and magnetic resonance imaging of
the patient’s prostate performed one
month later revealed the patient
received an approximate dose of 105.9
Gy (10,590 rad) to the prostate, which
was 73 percent of the prescribed dose.
The radiation oncologist placed
additional seeds into the patient’s
prostate to improve coverage and
comply with the treatment plan. The
licensee concluded that the medical
event would not have an adverse effect
on the second patient.
Cause(s)—The cause of the medical
event was human error in that the
radiation oncologist deviated from
standard operating procedures and did
not verify the information on the
prostate implantation plan.
Actions Taken To Prevent Recurrence
Licensee—The licensee’s corrective
actions included providing personnel
with additional training on the modified
process to ensure patients are treated
using the correct prostate implant plan.
Specifically, an individual will be
assigned for printing the prostate
E:\FR\FM\04SEN1.SGM
04SEN1
54498
Federal Register / Vol. 78, No. 171 / Wednesday, September 4, 2013 / Notices
tkelley on DSK3SPTVN1PROD with NOTICES
implant plan, verifying the patient’s
identity, and signing the document.
Subsequently, a second assigned
individual will then verify the
information and sign the document for
confirmation.
State—The KDPH conducted a
reactive inspection on December 7,
2011, approved the licensee’s corrective
actions, and did not issue any violations
or penalties for this event.
AS12–11 Medical Event at the
University of Toledo in Toledo, Ohio
Date and Place—December 19, 2011,
Toledo, OH.
Nature and Probable Consequences—
The University of Toledo (the licensee)
reported that a medical event occurred
associated with an HDR brachytherapy
treatment for cervical cancer; involving
148.4 GBq (4 Ci) iridium-192. The
patient was prescribed to receive a total
dose of 16 Gy (1,600 rad) in four
fractionated doses to the cervix
(treatment site). It was later determined
that the skin of the patient’s right and
left thigh (wrong treatment sites)
received doses of 12.51 Gy (1,251 rad)
and 12.74 Gy (1,274 rad), respectively.
The patient and referring physician
were informed of this event.
During a followup patient visit in
January 2012, the attending physician
noticed a reddening of the skin
(erythema) on both the right and left
upper thighs of the patient. Upon
investigation, the licensee did not
identify any errors with the treatment
plan, but discovered a problem with the
hardware used during the procedure.
During the treatment, a tandem is
inserted into the patient, and a catheter
for the sealed source is inserted in the
tandem. The vendor had recently
switched to a new catheter model that
was slightly larger in diameter and
thicker than the original. During the
procedure, the catheter got caught on a
minor blockage in the tandem and was
not fully inserted, and the source was
approximately 9 centimeter (cm) away
from the treatment site. The misplaced
source resulted in a total dose of 13.94
Gy (1,394 rad) to the treatment site and
excessive doses to the patient’s thighs.
As of March 21, 2012, the attending
physician reported that the patient had
fully recovered from the medical event.
The patient reported no bowel or
bladder problems, and the damaged skin
areas had totally healed. The physician
does not anticipate significant acute or
long-term complications because of this
medical event.
Cause(s)—The cause of the medical
event was human error in that the
licensee failed to recognize that the
catheter was not fully inserted into the
VerDate Mar<15>2010
16:51 Sep 03, 2013
Jkt 229001
tandem during at least one of the
fractionated doses. A contributing factor
was the change in catheter construction,
which allowed it to get caught on the
blockage in the tandem.
Actions Taken To Prevent Recurrence
Licensee—The corrective action taken
by the licensee includes marking the
new catheters to provide a visual
indication of full insertion into the
tandem and inservice training for all
staff involved in HDR treatments.
State—The Ohio Department of
Health (ODH) conducted an onsite
investigation and reviewed the incident
causes and corrective actions. In
February 2012, the ODH issued a notice
to all Ohio licensees advising them to
verify procedures to preclude a
recurrence of this event.
NRC12–02 Medical Event at Benefis
Hospital in Great Falls, Montana
Date and Place—January 5, 2012,
Great Falls, MT.
Nature and Probable Consequences—
Benefis Hospital (the licensee) reported
that a medical event occurred associated
with an HDR brachytherapy treatment
for esophageal cancer. The treatment
involved the use of 233.1 GBq (6.3 Ci)
of iridium-192 and the patient was
prescribed to receive a total dose of 7 Gy
(700 rad) to the esophageal region
(treatment site). However, it was
determined that a 4 cm length of tissue
in the nasal and nasopharyngeal sinus
area (wrong treatment site) received a
dose of 10 Gy (1,000 rad). The patient
and referring physician were informed
of this event.
On January 5, 2012, while planning
the treatment, the authorized medical
physicist (AMP) determined the
placement of the source using a radioopaque marker wire to simulate the
source with imaging software. During
the treatment, a nasogastric (NG) tube is
inserted into the patient through the
nostril, allowing for positioning of the
HDR catheter and source at the
treatment site. The NG tubes also have
radio-opaque markers to aid in their
placement in the patient, which the
AMP mistook for the radio-opaque
markers on the simulation wire. This
error by the AMP was compounded by
the lack of CT images of the patient’s
anatomy where the simulation wire was
positioned. When the medical staff
removed the HDR catheter and NG tube
at the end of the procedure, they
discovered that the HDR catheter had
not been fully inserted into the NG tube.
The licensee performed an investigation
and determined that the dose was
actually delivered to a location 29 cm
away from the treatment site. The
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
licensee concluded that the medical
event would not have an adverse effect
on the patient.
Cause(s)—The cause of the medical
event was human error in that the AMP
failed to recognize the source’s correct
placement relative to the treatment site.
Actions Taken To Prevent Recurrence
Licensee—The corrective action taken
by the licensee included procedure
modification such that catheter length
measurements are performed before
treatment and the NG tube and HDR
catheter are introduced to the patient as
a unit, rather than separately.
Additionally, CT scans will be taken to
cover the entire length of the HDR
catheter during all HDR procedures.
NRC—The NRC conducted a special
inspection on January 18, 2012, and
contracted with a medical consultant to
review the event. The NRC’s medical
consultant agreed with the hospital’s
analysis of this event, and the NRC
issued a NOV to the licensee.
AS12–12 Medical Event at
Presbyterian Hospital in Charlotte,
North Carolina
Date and Place—January 5 and 12,
2012, Charlotte, NC.
Nature and Probable Consequences—
Presbyterian Hospital (the licensee)
reported that a medical event occurred
associated with an HDR brachytherapy
treatment for gastric cancer; the
treatment involved 185.4 GBq (5 Ci) of
iridium-192. The patient was prescribed
to receive three fractionated doses of 7
Gy (700 rad) to the common bile duct
(treatment site). However, it was
determined that a 4 cm length of tissue
in the common bile duct and liver
(wrong treatment sites) received a dose
of 14 Gy (1,400 rad). The patient and
referring physician were informed of
this event.
On January 18, 2012, while
conducting the third fractionated HDR
brachytherapy treatment for gastric
cancer, the dosimetrist noticed that
incorrect dwell location was used on the
previous two fractioned treatments. On
the previous fractionated treatment
dates, January 5, 2012, and January 12,
2012, the dwell position on the HDR
was mistakenly adjusted outward rather
than inward. This resulted in treating
only 1 cm of the desired treatment site
of the common bile duct and delivered
a dose of 14 Gy (1,400 rad) to 4 cm of
the proximal portion of the bile duct
and surrounding liver tissue. The
licensee concluded that the medical
event would not have an adverse effect
on the patient.
Cause(s)—The cause of the medical
event was human error in that the
E:\FR\FM\04SEN1.SGM
04SEN1
Federal Register / Vol. 78, No. 171 / Wednesday, September 4, 2013 / Notices
oncology staff presumed that the source
position had been properly adjusted by
the medical physics staff and did not
notice this error until the third
fractionated treatment.
tkelley on DSK3SPTVN1PROD with NOTICES
Actions Taken To Prevent Recurrence
Licensee—The corrective action taken
by the licensee included a procedure
modification such that any catheter
dwell position adjustments of greater
than 5 millimeters (mm) mandate a
replanning of the treatment protocol.
State—The North Carolina Division of
Radiation Protection conducted a full
inspection of the brachytherapy
program (to include HDR) on February
16, 2012. There were no items of
noncompliance, and the State reviewed
and approved corrective actions. The
State did not issue any violations or
penalties for this event.
NRC12–03 Medical Event at Avera
McKennan Hospital in Sioux Falls,
South Dakota
Date and Place—January 16 and 17,
2012, Sioux Falls, SD.
Nature and Probable Consequences—
Avera McKennan Hospital (the licensee)
reported that a medical event occurred
associated with an HDR brachytherapy
treatment for breast cancer. The patient
was prescribed to receive 10
fractionated doses of 3.4 Gy (340 rad) for
a total dose of 34 Gy (3,400 rad) to the
tumor site (treatment site). However, it
was determined that the skin tissue over
the rib cage (wrong treatment site)
received a dose of 27.2 Gy (2,720 rad).
The patient and referring physician
were informed of this event.
On January 16, 2012, while
conducting the fractionated HDR
brachytherapy treatment for breast
cancer, the medical staff identified that
an incorrect treatment parameter length
had been entered into the HDR. The
programmed length was 10 cm too short
and resulted in the source traveling to
a location 10 cm short of the intended
treatment site (inside the breast). This
caused an unintended dose to the skin
over the rib cage. This error was
corrected and saved as a secondary
treatment plan in the HDR console,
which the staff used to correctly
administer the second fractionated
treatment. However, after the staff
delivered the third fraction the
following day (January 17, 2012), it was
discovered that the original incorrect
treatment plan had been inadvertently
selected by the console operator,
resulting in a second instance where the
skin over the rib cage received an
unintended dose. The licensee
performed an investigation and the NRC
contracted with a medical consultant,
VerDate Mar<15>2010
16:51 Sep 03, 2013
Jkt 229001
who determined that the patient
received approximately 27.2 Gy (2,720
rad) of unintended skin dose and
concluded that the event would not
have an adverse effect on the patient.
The patient experienced skin erythema,
or reddening, as was expected from this
level of skin exposure.
Cause(s)—The cause of the medical
event was that the licensee failed to
develop and implement effective
procedures to ensure that patient
treatment was in accordance with the
written directive.
Actions Taken To Prevent Recurrence
Licensee—The corrective actions
taken by the licensee included extensive
revisions to the HDR procedures,
including the development of
requirements for independent
verification of treatment parameter
lengths, and staff training on these
changes. The hospital also made
organizational and personnel changes to
improve the facility’s safety culture.
NRC—The NRC conducted a special
inspection from January 30 through
February 2, 2012, and identified several
procedural weaknesses in the licensee’s
HDR program. On October 3, 2012, the
NRC issued a NOV and civil penalty to
the licensee.
AS12–13 Medical Event at Thomas
Jefferson University Hospital in
Philadelphia, Pennsylvania
Date and Place—January 19, 2012,
Philadelphia, PA.
Nature and Probable Consequences—
Thomas Jefferson University Hospital
(the licensee) reported that a medical
event occurred associated with a
radioembolization brachytherapy
treatment of liver cancer for two
patients. The first patient received a
dose of 0.33 GBq (8.9 mCi) of yttrium90 to the liver, but this was the dose
prescribed for a second patient, which
was 36 percent less than prescribed. The
second patient received the dosage for
the first patient, which was 0.514 GBq
(13.9 mCi) or approximately 80 Gy
(8,000 rad) and 64 percent greater than
prescribed. The patients and referring
physicians were informed of this event.
On January 20, 2012, the licensee
reported that on the previous day the
licensee administered the incorrect
prescribed dosage of yttrium-90 to two
patients. The licensee stated that the
two patients were scheduled to be
treated on the same day, in close time
proximity, and that the worksheets were
switched and each patient received the
other patient’s dose. The licensee
concluded that the medical event would
not have an effect on the two patients.
However, the first patient received a
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
54499
higher dose than planned during the
next scheduled treatment to compensate
for the previous lower dosage described
in this event. No adverse medical
conditions are expected. The clinical
judgment with respect to the second
patient is that even though the dosage
was 35 percent above that prescribed in
the written directive, the activity was
within levels acceptable for this
particular patient and tumor size.
Cause(s)—The cause of the medical
event was human error in that the
medical staff did not verify the written
directive before commencing the
treatment, coupled with the erroneous
transposition of the written directives in
each patient’s file.
Actions Taken To Prevent Recurrence
Licensee—The corrective actions
taken by the licensee include
developing and implementing written
procedures to both minimize the chance
of errors occurring in the microsphere
dose preparation process and to identify
and correct any such errors before
administration. Independent checks by
multiple individuals will be made to
verify patient identity, treatment site,
and prescribed dosage relative to the
prepared dosage.
State—The PA DEP conducted a
reactive investigation on January 26,
2012, and identified inadequacies in the
administration procedure to provide
assurances that each treatment is in
accordance with the written directive. A
NOV was issued by PA DEP; however,
no order or final action was imposed
because a revised dosage administration
procedure was subsequently sent to PA
DEP for review.
AS12–14 Medical Event at the
Intermountain Medical Center in
Murray, Utah
Date and Place—February 2, 2012,
Murray, UT.
Nature and Probable Consequences—
The Intermountain Medical Center (the
licensee) reported that a medical event
occurred associated with a
radioembolization brachytherapy
treatment of liver cancer. The treatment
plan prescribed 5.32 GBq (143.6 mCi) of
yttrium-90 to deliver a total dose of 120
Gy (12,000 rad) to the right lobe of the
liver; however, the patient received the
dosage for a different patient. The
dosage administered to the patient was
1.77 GBq (47.8 mCi) of yttrium-90,
which was approximately 33 percent of
the prescribed activity or 67 percent
lower than the prescribed dose. The
resulting dose to the patient’s liver was
39.6 Gy (3,960 rads). The patient and
referring physician were informed of
this event.
E:\FR\FM\04SEN1.SGM
04SEN1
54500
Federal Register / Vol. 78, No. 171 / Wednesday, September 4, 2013 / Notices
On February 2, 2012, two patients
were at the licensee’s facility to receive
treatment for liver cancer using yttrium90 microspheres. The nuclear medicine
technologist inadvertently selected the
wrong yttrium-90 microsphere vial and
subsequently, administered to the first
patient the dosage that was intended for
the second patient. As a consequence,
the first patient received an under dose
of approximately 67 percent and
because the licensee identified the error
prior to administering any dose to the
second patient, the licensee was able to
treat the second patient with the correct
dose. The licensee determined that the
medical event would not have an effect
on the first patient.
Cause(s)—The cause of the medical
event was human error, which resulted
in the licensee administering the wrong
radiopharmaceutical treatment dose to
the patient.
tkelley on DSK3SPTVN1PROD with NOTICES
Actions Taken To Prevent Recurrence
Licensee—The corrective actions
taken by the licensee include a
requirement for two individuals to sign
off on the dosage vial, with the written
directive present, before administering
the dosage to the patient. In addition,
the licensee committed to following
protocol verification just before
treatment to verify the patient’s
identification, site being treated, dose to
be administered, and the correct
identification on the dose vial.
State—The Utah Department of
Environmental Quality, Division of
Radiation Control conducted an
investigation on February 6, 2012, and
concluded its investigation on April 19,
2012. The State approved the licensee’s
corrective actions and did not issue any
violations or penalties for this event.
AS12–15 Medical Event at Abbott
Northwestern Hospital in Minneapolis,
Minnesota
Date and Place—February 2, 2012,
Minneapolis, MN.
Nature and Probable Consequences—
Abbott Northwestern Hospital (the
licensee) reported to the Minnesota
Department of Health (MDH) that a
medical event occurred associated with
a SIR-Spheres (microspheres) treatment
of liver cancer involving 1.55 GBq (41.9
mCi) of yttrium-90. A postprocedure
scan of the patient identified a
significant undesired amount of activity
in the upper stomach (gastric fundus),
spleen and small intestine (duodenum)
(wrong treatment sites). The licensee
estimated doses to these tissues of 44 Gy
(4,400 rad), 35 Gy (3,500 rad), and 35 Gy
(3,500 rad), respectively. The patient
and referring physician were informed
of this event.
VerDate Mar<15>2010
16:51 Sep 03, 2013
Jkt 229001
On February 3, 2012, the licensee
notified MDH that following an infusion
of radioactive yttrium-90, a
postprocedure CT scan of the patient
revealed that some of the yttrium-90
was not in the liver as intended. The
scan indicated that 10 to 15 percent of
the yttrium-90 appeared in vessels
involving the spleen and digestive track.
The patient received followup
diagnostic scans to determine a baseline
for future treatment and the long-term
prognosis. On February 6, 2012, after
consultation with international and
domestic experts, the patient was
administered the radio-protective agent
amifostine. The licensee concluded that
the event may result in unintended,
permanent functional damage and some
form of future medical intervention was
likely needed. A special review group
including surgeons, radiation
oncologists, and interventional
radiologists are managing the care of the
patient on an ongoing basis.
Cause(s)—The licensee stated that
they had not anticipated any adverse
reactions to this treatment, and that the
treatment was correctly planned and
administered. However, the licensee
hypothesized that the cause may have
been the result of temporary blood
vessel contractions in the patient due to
the passage of the microspheres.
Actions Taken To Prevent Recurrence
Licensee—Corrective actions were not
indicated as the licensee followed
appropriate therapy procedures and the
treatment had no unusual implications.
Additionally, based upon the large
number of this type of treatment that the
licensee has performed, it appears that
this medical event is a rare occurrence.
State—On February 6, 2012, MDH
performed an onsite investigation of the
medical event. The MDH concluded that
licensee procedures were appropriately
followed and no violations were issued.
AS12–16 Medical Event at Carolina
East Medical Center in New Bern, North
Carolina
Date and Place—May 29, 2012, New
Bern, NC.
Nature and Probable Consequences—
Carolina East Medical Center (the
licensee) reported that a medical event
occurred associated with a manual
brachytherapy treatment for prostate
cancer. The treatment consisted of 27
needles containing 65 pre-stranded
seeds of iodine-125 with each seed
containing 12.6 MBq (0.34 mCi). The
physician prescribed a total dose of 145
Gy (14,500 rad) to the prostate; however,
it was determined during the post
implant seed count that all of the seeds
were implanted in the penile bulb
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
(glans) (wrong treatment site). The
resulting dose to the penile bulb was
145 Gy (14,500 rad). The patient and
referring physician were informed of
this event.
On May 29, 2012, after completion of
the implantation procedure, the licensee
performed a CT scan of the patient to
verify the placement of the implanted
seeds. The licensee confirmed that all of
the seeds were improperly implanted in
the penile bulb. The patient was
informed the following day, since he
had been under the effects of general
anesthesia during and after the
procedure. The patient and his family
were counseled at length by the AU
within a week of the occurrence of the
medical event. The AU reported that the
patient tolerated the brachytherapy
procedure well, without acute toxicity.
The AU reported that anticipated side
effects from this event will be similar to
the anticipated side effects from a
typical permanent prostate
brachytherapy implant. The licensee
concluded that the medical event would
not have a significant medical effect on
the patient.
Cause(s)—The cause of the medical
event was the incorrect identification of
the prostate during ultrasound imaging
resulting in the improper placement of
the brachytherapy seeds.
Actions Taken To Prevent Recurrence
Licensee—The AU compiled a report
and discussed corrective actions with
the urologist and the authorized medical
physicist. The licensee revised the
procedures to include a mandatory
‘‘time out’’ period during implant
procedures, and a quality assurance
procedure for pre-plan ultrasounds.
Additional licensee corrective actions
include using single shot fluoroscopy,
in addition to ultrasound, to verify
placement of the brachytherapy seed
needle at the base of the prostate.
Contrast and other additional
enhancements may be used in
conjunction with the fluoroscopy to
ensure more accurate imaging results.
State—The North Carolina Division of
Radiation Protection conducted an
investigation on June 12, 2012. Two
items of noncompliance were noted: (1)
The licensee failed to have documented
procedures to ensure that a therapy is
administered in accordance with the
written directive, and (2) the licensee
failed to have a program commensurate
with licensed activities. Enforcement
actions are pending the licensee’s
responses to the State.
E:\FR\FM\04SEN1.SGM
04SEN1
Federal Register / Vol. 78, No. 171 / Wednesday, September 4, 2013 / Notices
AS12–17 Medical Events at Wheaton
Franciscan Healthcare-All Saints in
Racine, Wisconsin
Date and Place—July 15, 2005
through May 20, 2010 (reported on July
19, 2012), Racine, WI.
Nature and Probable Consequences—
Wheaton Franciscan Healthcare-All
Saints (the licensee) reported 15
medical events associated with prostate
brachytherapy seed implant procedures,
which occurred between July 2005 and
May 2010. The medical events involved
permanent implant seeds of iodine-125
where the total dose delivered differed
from the prescribed dose by 20 percent
or more. The 15 medical events
involved 13 patients, including seven
patients who received a rectal (wrong
treatment site) dose that exceeded the
prescribed prostate dose by more than
10 Gy (1,000 rads). The patients and
physicians were informed of these
events.
The Wisconsin Department of Health
Services (WDHS) identified the medical
events during a routine inspection and
followed up with a reactive inspection
on July 18, 2012. The WDHS inspectors
determined that the licensee was not
reviewing prostate brachytherapy cases
against the medical event criteria.
Instead, the licensee was using
established dose-based criteria based
upon the postoperative CT scans of the
events. The events involved prostate
procedures where the doses were less
than 80 percent or greater than 130
percent of the prescribed dose, or
procedures where the doses to 2 cubic
centimeters (cm3) of the rectum or
bladder were greater than the prescribed
prostate dose. The AU’s review of each
of the medical events concluded that the
posterior rows of seeds were placed too
close to the rectal mucosa. The licensee
has evaluated all prostate implants
performed since 2001. The licensee
concluded that the medical events
would not have any adverse effects on
the patients and is monitoring their
medical progress.
Cause(s)—The cause of the medical
events was human error in that the
licensee was not providing adequate
oversight of the permanent implant
prostate brachytherapy program.
tkelley on DSK3SPTVN1PROD with NOTICES
Actions Taken To Prevent Recurrence
Licensee—The licensee’s corrective
actions include: (1) Revising the
prostate implant procedures to include
the use of stranded seeds, (2) allowing
only the AU to insert the needles into
the prostate, and (3) a secondary check
of the needle position prior to deploying
the seeds. Additionally, the AU is now
the only individual who contours the
VerDate Mar<15>2010
16:51 Sep 03, 2013
Jkt 229001
images on the postoperative CT scan,
which is reviewed by the medical
physicist to improve accuracy.
State—The WDHS conducted a
reactive inspection on July 18, 2012,
and did not cite the licensee because of
the licensee’s self-identified and
implemented process improvements
prior to the inspection. No additional
cases have met the medical event
reporting criteria.
NRC12–04 Medical Event at Deaconess
Hospital in Evansville, Indiana
Date and Place—August 15, 2012,
Evansville, IN.
Nature and Probable Consequences—
Deaconess Hospital (the licensee)
reported that a medical event occurred
associated with an HDR mammosite
brachytherapy treatment for breast
cancer. The patient was prescribed to
receive 10 fractionated doses for a total
dose of 34 Gy (3,400 rad) to the breast
tumor site. However, it was determined
that a 4.2-cm length of skin and fatty
breast tissue (wrong treatment sites)
received a dose of 34 Gy (3,400 rad).
The patient and referring physician
were informed of this event.
Between March 5 and 9, 2012, the
patient received two HDR mammosite
treatments per day to the right breast for
a total prescribed dose of 34 Gy (3,400
rad). During a followup appointment on
June 11, 2012, it was noted that the
catheter insertion site had not healed. A
plastic surgeon performed surgical
removal of the entire skin and breast
tissue area affected by the treatment.
The surgical pathology report revealed a
final diagnosis of fat necrosis with
granulation tissue radiation effect. Upon
reviewing the pathology report, the
prescribing physician requested
complete review of the treatment plan
by a qualified consultant. The
consultant discovered that the
unintended dose to the skin and fatty
breast tissue was the result of the
incorrect positioning of the HDR source.
The possibility of long-term effects are
low, but nonetheless additional skin
ulceration and breast tissue necrosis
could occur.
Cause(s)—The cause of the medical
event was human error in that the
medical physicist was not familiar with
the treatment planning system for the
HDR mammosite device. A contributing
factor to the cause of the event was the
licensee’s ineffective independent check
of the treatment plan prior to
commencing the procedure.
Actions Taken To Prevent Recurrence
Licensee—The corrective actions
taken by the licensee include the
independent review, by a qualified third
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
54501
party, of HDR treatment plans prior to
delivery for the first five plans provided
by each physician or physicist.
Additionally, the licensee requires the
performance of an additional
independent check that verifies the
physical orientation of any channel
(catheter) used in an HDR procedure.
Finally, the licensee implemented
appropriate training and continuing
medical education programs for all staff
participating in HDR procedures.
NRC—The NRC conducted a special
inspection on August 22, 2012, and
contracted with a medical consultant to
review the event. The NRC’s medical
consultant agreed with the hospital’s
analysis of this event. On January 31,
2013, the NRC issued a NOV to the
licensee.
AS12–18 Medical Event at the
Anderson Regional Medical Center in
Meridian, Mississippi
Date and Place—September 10, 2012,
Meridian, MS.
Nature and Probable Consequences—
Anderson Regional Medical Center (the
licensee) reported that a medical event
occurred associated with an iodine-131
treatment for thyroid carcinoma. The
patient was prescribed to receive a total
dose of 25 Gy (2,500 rad) to the thyroid
using 3.7 GBq (100 mCi) of iodine-131.
Instead, the patient received 6.03 GBq
(162.8 mCi) of iodine-131 for an
approximate dose of 40 Gy (4,000 rad)
to the thyroid, which was about 160
percent of the prescribed dosage to the
patient. The patient and referring
physician were informed of this event.
On September 10, 2012, the licensee
reported that a patient was administered
6.03 GBq (162.8 mCi) of iodine-131,
instead of the prescribed 3.7 GBq (100
mCi). An investigation performed by the
licensee revealed that the nuclear
medicine technologist misinterpreted
the patient’s admission order as a
written directive. Specifically, the
nuclear medicine technologist
incorrectly interpreted the AU’s name
and 5.55 GBq (149.9 mCi) of iodine-131
activity on the patient’s admission order
as the written directive for the patient’s
treatment. The written directive for the
patient’s treatment was never received
by the Nuclear Medicine Department.
The doctor indicated that the patient
was previously treated using a
prescribed dose of 100 mCi, and that the
thyroid would be fully saturated with
iodine-131. Additionally, the doctor
believes that the thyroid would not have
significant uptake of the excess iodine131 and this excess would be quickly
excreted from the patient. Therefore, the
licensee concluded that this elevated
E:\FR\FM\04SEN1.SGM
04SEN1
54502
Federal Register / Vol. 78, No. 171 / Wednesday, September 4, 2013 / Notices
dose would not result in any adverse
health effects to the patient.
Cause(s)—The medical event was
caused by human error coupled with a
new communication process, in which
written directives were not directly
communicated to the Nuclear Medicine
Department.
Actions Taken To Prevent Recurrence
Licensee—The licensee restored its
previous written directive
communication policy, which required
the communication of written directives
directly from the AU to the Nuclear
Medicine Department and required
written directives for iodine-131 on a
specific therapy form.
State—The Mississippi Division of
Radiological Health conducted an
investigation on September 19, 2012,
and cited the licensee with a violation
for its failure to follow written directive
procedures. The investigation revealed
this violation was an isolated incident
during a two-month period where the
change in written directive
communication policy took place.
Dated at Rockville, Maryland, this 28th day
of August, 2013.
For the Nuclear Regulatory Commission.
Annette Vietti-Cook,
Secretary of the Commission.
[FR Doc. 2013–21477 Filed 9–3–13; 8:45 am]
BILLING CODE 7590–01–P
POSTAL REGULATORY COMMISSION
Sunshine Act Meetings
4. Report from the Office of
Accountability and Compliance.
5. Report from the Office of the
Secretary and Administration.
6. Report on the Public Representative
program pursuant to 39 U.S.C. 505.
PORTION CLOSED TO THE PUBLIC:
7. Discussion of pending litigation.
CONTACT PERSON FOR MORE INFORMATION:
Stephen L. Sharfman, General Counsel,
Postal Regulatory Commission, 901 New
York Avenue NW., Suite 200,
Washington, DC 20268–0001, at 202–
789–6820 (for agenda-related inquiries)
and Shoshana M. Grove, Secretary of the
Commission, at 202–789–6800 or
shoshana.grove@prc.gov (for inquiries
related to meeting location, access for
handicapped or disabled persons, the
audiocast, or similar matters).
By direction of the Commission.
Ruth Ann Abrams,
Acting Secretary.
[FR Doc. 2013–21506 Filed 8–30–13; 11:15 am]
BILLING CODE 7710–FW–P
SECURITIES AND EXCHANGE
COMMISSION
[Release No. 34–70276; File No. SR–FINRA–
2013–036]
Self-Regulatory Organizations;
Financial Industry Regulatory
Authority, Inc.; Notice of Filing of a
Proposed Rule Change Relating to
Wash Sale Transactions and FINRA
Rule 5210 (Publication of Transactions
and Quotations)
August 28, 2013.
Wednesday, September
11, 2013, at 11 a.m.
PLACE: Commission Hearing Room, 901
New York Avenue NW., Suite 200,
Washington, DC 20268–0001.
STATUS: Part of this meeting will be
open to the public. The rest of the
meeting will be closed to the public.
The open session will be audiocast. The
audiocast may be accessed via the
Commission’s Web site at https://
www.prc.gov. A period for public
comment will be offered following
consideration of the last numbered item
in the open session.
MATTERS TO BE CONSIDERED: The agenda
for the Commission’s September 11,
2013 meeting includes the items
identified below.
PORTIONS OPEN TO THE PUBLIC:
1. Report on legislative activities.
2. Report on handling of ate and service
inquiries from the public.
3. Report from the Office of General
Counsel on the status of
Commission dockets.
tkelley on DSK3SPTVN1PROD with NOTICES
TIME AND DATE:
VerDate Mar<15>2010
16:51 Sep 03, 2013
Jkt 229001
Pursuant to Section 19(b)(1) of the
Securities Exchange Act of 1934
(‘‘Act’’) 1 and Rule 19b–4 thereunder,2
notice is hereby given that on August
15, 2013, Financial Industry Regulatory
Authority, Inc. (‘‘FINRA’’) filed with the
Securities and Exchange Commission
(‘‘SEC’’ or ‘‘Commission’’) the proposed
rule change as described in Items I and
II below, which Items have been
prepared by FINRA. The Commission is
publishing this notice to solicit
comments on the proposed rule change
from interested persons.
I. Self-Regulatory Organization’s
Statement of the Terms of Substance of
the Proposed Rule Change
FINRA is proposing to add
Supplementary Material .02 to FINRA
Rule 5210 (Publication of Transactions
and Quotations) to emphasize that wash
sale transactions are generally non-bona
fide transactions and that members have
1 15
2 17
PO 00000
U.S.C. 78s(b)(1).
CFR 240.19b–4.
Frm 00059
Fmt 4703
Sfmt 4703
an obligation to have policies and
procedures in place to review their
trading activity for, and prevent, wash
sale transactions.
Below is the text of the proposed rule
change. Proposed new language is in
italics; proposed deletions are in
brackets.
*
*
*
*
*
5000. SECURITIES OFFERING AND
TRADING STANDARDS AND
PRACTICES
*
*
*
*
*
5200. QUOTATION AND TRADING
OBLIGATIONS AND PRACTICES
5210. Publication of Transactions and
Quotations
No Change.
• • • Supplementary Material:
.01 Manipulative and Deceptive
Quotations. No Change.
.02 Wash Sales. Transactions in a
security that involve no change in the
beneficial ownership of the security,
commonly known as ‘‘wash sales,’’
generally are non-bona fide transactions
for purposes of Rule 5210. Members
must have policies and procedures in
place that are reasonably designed to
review their trading activity for, and
prevent, wash sale transactions.
Transactions that originate from
unrelated algorithms or separate and
distinct trading strategies within the
same firm would generally be
considered bona fide transactions and
would not be considered wash sales,
even if the transactions did not result in
a change of beneficial ownership, unless
the transactions were undertaken for
manipulative or other fraudulent
purposes. Algorithms or trading
strategies within the most discrete unit
of an effective system of internal
controls at a member firm are presumed
to be related (e.g., within an aggregation
unit, or individual trading desks within
an aggregation unit separated by
reasonable information barriers, as
applicable). This Supplementary
Material does not change members’
existing obligations under NASD Rule
3010 and FINRA Rule 2010.
*
*
*
*
*
II. Self-Regulatory Organization’s
Statement of the Purpose of, and
Statutory Basis for, the Proposed Rule
Change
In its filing with the Commission,
FINRA included statements concerning
the purpose of and basis for the
proposed rule change and discussed any
comments it received on the proposed
rule change. The text of these statements
may be examined at the places specified
E:\FR\FM\04SEN1.SGM
04SEN1
Agencies
[Federal Register Volume 78, Number 171 (Wednesday, September 4, 2013)]
[Notices]
[Pages 54493-54502]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-21477]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2013-0094]
Report to Congress on Abnormal Occurrences: Fiscal Year 2012,
Revision 1; Dissemination of Information
Section 208 of the Energy Reorganization Act of 1974 (Pub. L. 93-
438) defines an abnormal occurrence (AO) as an unscheduled incident or
event that the U.S. Nuclear Regulatory Commission (NRC) determines to
be significant from the standpoint of public health or safety. The
Federal Reports Elimination and Sunset Act of 1995 (Pub. L. 104-68)
requires that AOs be reported to Congress annually. During Fiscal Year
(FY) 2012, 22 events that occurred at facilities licensed by the NRC
and/or Agreement States were determined to be AOs.
This report describes four events at NRC-licensed facilities. The
first event at an NRC-licensed facility was an occurrence at a
commercial nuclear power plant and the other three events occurred at
NRC-licensed medical institutions and are medical events as defined in
part 35 of Title 10 of the Code of Federal Regulations (10 CFR). The
report also describes 18 events at Agreement State-licensed facilities.
Agreement States are the 37 States that currently have entered into
formal agreements with the NRC pursuant to Section 274 of the Atomic
Energy Act (AEA) to regulate certain quantities of AEA-licensed
material at facilities located within their borders. The first
Agreement State-licensee event involved radiation exposure to an
embryo/fetus, and the second event involved an exposure to a
radiographer. The other 16 Agreement State-licensee events were medical
events as defined in 10 CFR part 35 and occurred at medical
institutions. As required by Section 208, the discussion for each event
includes the date and place, the nature and probable consequences, the
cause or causes, and the actions taken to prevent recurrence. Each
event is also described in NUREG-0090, Volume 35, ``Report to Congress
on Abnormal Occurrences: Fiscal Year 2012,'' issued May 2013 (ADAMS
Accession No. ML13149A083). The report was revised to include editorial
corrections and reissued in August 2013 as NUREG-0090, Volume 35,
Revision 1, ``Report to Congress on Abnormal Occurrences: Fiscal Year
2012'' (ADAMS Accession No. ML13225A395). This report is available
electronically at the NRC's Web site at https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/.
Three major categories of events are reported in this document--I.
For All Licensees, II. For Commercial Nuclear Power Plant Licensees,
and III. Events at Facilities Other Than Nuclear Power Plants and All
Transportation Events. The full report, which is available on the NRC's
Web site, provides the specific criteria for determining when an event
is an AO. It also discusses ``Other Events of Interest,'' which do not
meet the AO criteria but have been determined by the Commission to be
included in the report. The event identification number begins with
``AS'' for Agreement State AO events and ``NRC'' for NRC AO events.
I. For All Licensees
A. Human Exposure to Radiation From Licensed Material
During this reporting period, two events involving Agreement State-
licensees were significant enough to be reported as AOs. Although one
of these events occurred at a medical facility, it involved unintended
exposure of an individual who was not the patient. Therefore, this
event belongs under the Criterion I.A, ``For All Licensees'' category,
as opposed to the Criterion III.C, ``Medical Licensees'' category.
AS12-01 Embryo/Fetus Exposure to Radiation at Lankenau Hospital in
Wynnewood, Pennsylvania
Date and Place--October 6, 2011, Wynnewood, PA.
Nature and Probable Consequences--Lankenau Hospital (the licensee)
reported that a patient received 2.7 gigabecquerel (GBq) (73.7
millicuries (mCi)) of iodine-131 for thyroid ablation therapy. Before
the treatment, the patient informed the licensee that she was not
pregnant, and was administered a pregnancy test as a routine
precaution. The pregnancy test yielded a negative result. Therefore,
the licensee administered iodine-131 to the patient.
On October 26, 2011, the patient became aware that she was
pregnant. The licensee contacted the patient's obstetrician/
gynecologist and was informed that an ultrasound confirmed that she was
approximately 10 days pregnant at the time of the iodine-131 treatment.
The NRC contracted a medical consultant, who estimated a fetal or
embryo dose of 174 mSv (17.4 rem) and stated that embryonic tissue
capable of concentrating iodine-131 is not formed until 10 to 12 weeks
of gestation; therefore, this tissue had not yet formed at the time of
the treatment. The medical consultant concluded that there was a low
possibility of carcinogenesis or malformations.
Cause(s)--The cause of this event was the inability of the
pregnancy test to provide a positive determination of pregnancy in
close proximity to conception.
Actions Taken To Prevent Recurrence
Licensee--The licensee assessed the event and determined that it is
following best practices by ordering a pregnancy test and relying on
its results.
State--The Pennsylvania Department of Environmental Protection (PA
DEP) conducted a followup inspection to review this incident and
collect information from the medical consultant and the licensee to
complete this review. PA DEP has no further action planned for this
event.
AS12-02 Human Exposure to Radiation at Non-Destructive Inspection
Corporation, in Pasadena, Texas
Date and Place--March 24, 2012, Pasadena, TX.
Nature and Probable Consequences--The Non-Destructive Inspection
Corporation (the licensee) reported that a radiographer received a
total effective dose equivalent (TEDE) of 293.2 mSv (29.3 rem). The
licensee reported that the drive cable of a radiography camera
containing 2.41 terabecquerels (TBq)
[[Page 54494]]
(65.1 curies (Ci)) of iridium-192 broke, and the source pigtail
disconnected from the drive cable inside the source guide tube. The
radiographer trainer disconnected the source guide tube from the
exposure device and placed it around his neck while he climbed down the
ladder of a scaffold. The source was in the guide tube at that time,
but its location within the guide tube is uncertain. When the
radiographer trainer reached the platform he removed the guide tube
from his neck. He then noted that the other radiographer was having
problems disconnecting the crank assembly from the exposure device and
that the exposure device locking mechanism was still unlocked.
Radiation surveys were performed of the exposure device and source
guide tube. Radiation levels revealed that the source was within the
guide tube. The radiographer trainer picked up the guide tube with long
tongs and the source fell out of the guide tube onto the floor. An
authorized individual responded to the site and performed source
retrieval. The radiographer trainer's film badge was processed and read
0.812 mSv (81.2 mrem). During event reenactment, it was determined that
the source guide tube was around the radiographer trainer's neck for
approximately 35 seconds. The licensee calculated and assigned an
estimated TEDE dose of 293.2 mSv (29.3 rem). The event was reported as
a Level 2 (incident) on the International Atomic Energy Agency's
International Nuclear and Radiological Event Scale (INES).
Cause(s)--The cause of this event was corrosion of the drive cable
and improper maintenance coupled with the failure of the operators to
perform the proper radiation surveys.
Actions Taken To Prevent Recurrence
Licensee--The corrective action taken by the licensee included a
complete cessation of operations and review of the incident with every
radiographer in the company; and an inspection of all of the licensee's
equipment, with replacement as needed. The radiographer trainer was
retrained and re-tested. The licensee stated it will incorporate
routine equipment maintenance and inspections performed by the
manufacturer.
State--The Texas Department of State Health Services (DSHS)
collected information from the licensee, including medical surveillance
information, and completed its review of the event and the licensee's
corrective actions. The DSHS cited both the licensee and radiographer
trainer with several violations associated with this event.
II. Commercial Nuclear Power Plant Licensees
During this reporting period, one event at a commercial nuclear
power plant in the United States was significant enough to be reported
as an AO.
NRC12-01 Commercial Nuclear Power Plant Event at Fort Calhoun Station,
Unit 1, in Fort Calhoun, Nebraska
Date and Place--June 7, 2011, Fort Calhoun, NE.
Nature and Probable Consequences--The Omaha Public Power District
(OPPD) (the licensee) reported a commercial nuclear power plant event
at Fort Calhoun Station (FCS), Unit 1, a single pressurized-water
reactor designed by Combustion Engineering. On June 7, 2011, a fire
started in a recently replaced safety-related electrical breaker in an
electrical switchgear room at the plant. The fire resulted in FCS
declaring an alert because the fire impacted safety-related equipment.
The catastrophic failure of the replacement breaker and subsequent fire
resulted in a large quantity of soot and smoke. The soot and smoke were
sufficiently conductive that arcing occurred and the feeder breaker for
the redundant train of electrical switchgear tripped. Operators took
action to isolate equipment potentially affected by the fire. The event
resulted in the loss of the spent fuel pool cooling function and could
have resulted in the loss of a safety function or multiple failures in
systems used to mitigate an event had the event occurred while the
plant was operating at power. The reactor was shutdown at the time of
the fire.
The NRC determined that the event represented a finding of high
safety significance (red finding). The basis for this determination was
the high fire frequency given the short period of time that the
replacement breaker had been in service, the significant damage caused
by the failure, and the fact that the event affected both trains of
safety equipment. The public was never endangered because the plant was
in cold shutdown for a planned refueling outage at the time of the
fire. Significantly less safety equipment is required in this plant
condition to safely cool the fuel. However, had this event occurred
while the plant was operating at power, the response to the event would
have been much more complex.
Cause(s)--The direct cause of the fire was the high electrical
resistance of the replacement breaker and the lack of proper cleaning
and tightening of the electrical switchgear. Additionally, the area of
the electrical connection was found to be full of hardened grease and
copper oxide because of poor electrical maintenance practices by the
licensee.
Actions Taken To Prevent Recurrence
Licensee--As a result of the event and other factors, OPPD has
maintained FCS in a shutdown condition. Through its root cause analysis
process, the licensee preliminarily determined that a wiring
discrepancy caused the fire to spread to the opposite safety-related
electrical train. The licensee also performed checks to ensure the
wiring discrepancy is no longer present in the plant on the replacement
equipment or other similar equipment.
NRC--The NRC transitioned FCS oversight from that described in
Inspection Manual Chapter (IMC) 0305, ``Operating Reactor Assessment
Program,'' to that described in IMC 0350, ``Oversight of Reactor
Facilities in a Shutdown Condition due to Significant Performance and/
or Operational Concerns.'' The IMC 0350 process for FCS was implemented
to:
Establish a regulatory oversight framework as a result of
significant performance problems and a significant operational event.
Ensure the NRC communicates a unified and consistent
position in a clear and predictable manner.
Establish a record of actions taken and technical issues
resolved.
Verify that corrective actions are sufficient for restart.
Provide assurance that, following restart, the plant will
be operated in a manner that provides for adequate protection of public
health and safety.
On February 26, 2013, the NRC issued a revised Confirmatory Action
Letter (CAL) (EA-13-020) ``Confirmatory Action Letter--Fort Calhoun
Station,'' (available at the NRC's Agencywide Documents Access and
Management System (ADAMS) Accession No. ML13057A287) to confirm those
actions that the NRC determined will need review or inspection before
the restart of the plant. This revision supplemented two previously
issued confirmatory action letters (ADAMS Accession Nos. ML112490164
and ML12163A287) that confirmed actions that were necessary prior to
restart. This revision was issued to incorporate three additional items
to the Restart Checklist, that relate to (1) qualifications for
containment electrical penetrations, (2) containment internal structure
deficiencies, and (3) a number of safety system functional failures
resulting in the associated performance indicator crossing into the
white threshold. Prior to the NRC terminating the CAL and allowing FCS
to restart, the NRC will verify that the licensee's
[[Page 54495]]
corrective actions adequately address all of the items detailed on the
restart checklist.
III. Events At Facilities Other Than Nuclear Power Plants and All
Transportation Events
C. Medical Licensees
During this reporting period, three events at NRC licensees and 16
events at Agreement State-licensees were significant enough to be
reported as AOs.
AS12-03 Medical Event at Greenville Memorial Hospital in Greenville,
South Carolina
Date and Place--September 15, 2009, Greenville, SC.
Nature and Probable Consequences--Greenville Memorial Hospital (the
licensee) reported that a medical event occurred associated with a
radioembolization brachytherapy treatment for liver cancer involving
1.7 GBq (45.9 mCi) of yttrium-90. The patient was prescribed to receive
a total dose of approximately 13 Gy (1,300 rad) to the liver, but
instead received a dose of approximately 26 Gy (2,600 rad) to the
liver. This delivered dosage was approximately 100 percent greater than
the prescribed dosage to the patient. The patient and referring
physician were informed of this event.
On September 17, 2009, the licensee notified the South Carolina
Department of Health and Environmental Control that following an
infusion of radioactive yttrium-90, a postprocedure record review
revealed that the patient was administered 1.7 GBq (45.9 mCi) of
yttrium-90 versus the prescribed dose of 0.94 GBq (25.4 mCi). Upon
investigation, it was discovered by the licensee that errors occurred
both while preparing the treatment and estimating the activity from the
written directive. Upon medical followup, the patient had good tumor
response with no adverse medical effects.
Cause(s)--The cause of the medical event was human error in failing
to administer the correct activity as stated on the written directive.
Actions Taken To Prevent Recurrence
Licensee--The licensee corrective actions included: (1) Mandatory
refresher training for all participants in this event, (2)
implementation of a requirement to confirm the prescribed dose by two
nuclear medicine technologists prior to administration, (3)
implementation of a requirement for the written directive to be typed
or printed with the dose amount highlighted, and (4) discussion of the
event and corrective actions at the next meeting of the Radiation
Safety Committee.
State--The South Carolina Department of Health and Environmental
Control conducted an investigation on September 17, 2009, and
determined that no items of non-compliance were noted. The State
forwarded the final update of this event to the NRC on October 18,
2012.
AS12-04 Medical Event at the Duke University Medical Center in Durham,
North Carolina
Date and Place--October 22, 2010, Durham, NC.
Nature and Probable Consequences--Duke University Medical Center
(the licensee) reported that a medical event occurred associated with a
high dose rate (HDR) endobronchial brachytherapy treatment for small
cell lung cancer. The treatment involved the use of 199.8 GBq (5.4 Ci)
of iridium-192 split between two treatment catheters. The patient was
prescribed to receive two doses of 10 Gy (1,000 rad) for a total dose
of 20 Gy (2,000 rad) to the tumor site. However, the direction of the
catheters was reversed during treatment, resulting in a dose of 20 Gy
(2,000 rad) to the voice box (wrong treatment site). The patient and
referring physician were informed of this event.
On October 22, 2010, the medical staff initially identified the
locations of the two treatment catheters using computed tomography (CT)
images. During the treatment, the direction of the catheters was
mistakenly reversed. This changed the starting position of the HDR
source and resulted in the dose being delivered to the voice box rather
than the targeted treatment site on the left side of the patient's
airway. The patient exhibited minor swelling of the voice box, but no
airway compromise, hoarseness, shortness of breath, or painful
swallowing. The licensee concluded that the medical event would not
have a significant medical effect on the patient. The patient was
subsequently given the correct total dose in a followup treatment.
Cause(s)--The cause of the medical event was human error in that
the oncology staff failed to correctly place and verify the position of
the two treatment catheters. A contributing factor to the cause of the
event is that the oncology staff infrequently uses two catheters to
simultaneously deliver doses during HDR treatments.
Actions Taken To Prevent Recurrence
Licensee--The licensee's corrective actions included: (1) A root-
cause analysis of the event, (2) development of a more detailed
standard operational procedure for this type of treatment, (3) a
revised HDR patient quality assurance form to include extra levels of
verification, and (4) a new verification procedure. The licensee also
provided training on the revised procedures for all radiation oncology
staff approved to conduct HDR therapy.
State--The North Carolina Division of Radiation Protection
conducted an investigation on December 14, 2010, and identified several
procedural weaknesses in the licensee's HDR program. One item of
noncompliance was issued and the State forwarded the final update of
this event to the NRC on November 28, 2012.
AS12-05 Medical Events at Our Lady of Bellefonte Hospital in Ashland,
Kentucky
Date and Place--October 3, 2001 through February 24, 2009 (reported
on December 13, 2010), Ashland, KY.
Nature and Probable Consequences--The Kentucky Department of Public
Health (KDPH) identified a medical event at Our Lady of Bellefonte
Hospital (the licensee) associated with a brachytherapy seed implant
procedure to treat prostate cancer. The patient was prescribed to
receive a total dose of 132.8 Gy (13,280 rad) to the prostate using 105
palladium-103 seeds, but instead the patient received an approximate
dose of 131 Gy (13,100 rad) to the penile bulb (glans) (wrong treatment
site). The patient and referring physician were not informed of this
event because the licensee believed that the treatment was
satisfactory. However, the patient was subsequently informed of this
event during a consultation at another medical treatment facility.
The licensee was unable to perform a dose assessment of the
affected tissue due to the radiation oncologist's inadequate
postprocedure seed implant records. The patient sought a second opinion
from a different radiation oncologist, who performed a CT scan of the
treatment site. Based on the results of this CT scan, the second
radiation oncologist determined that the penile bulb received the
majority of the prescribed dose. On November 30, 2010, KDPH
investigated this event and the licensee's entire prostate
brachytherapy treatment program. The KDPH discovered 34 additional
cases of improper prostate seed implantation performed by the same
radiation oncologist between October 3, 2001, and February 24, 2009.
The KDPH documented procedural violations by the radiation oncologist
including written directives not containing the prescribed or delivered
doses, no
[[Page 54496]]
records of postprocedure implant doses, and the lack of postprocedure
CT scans.
Cause(s)--The cause of the medical events was human error in the
failure of the radiation oncologist to follow the licensee's procedures
and the failure of the licensee to maintain oversight of its
brachytherapy program.
Actions Taken To Prevent Recurrence
Licensee--The corrective actions taken by the licensee included
providing personnel with additional training, permanently suspending
the brachytherapy program, and removing the radiation oncologist who
performed the implant procedures from the license.
State--The KDPH conducted an extensive investigation from November
30, 2010 through November 2, 2012, and cited the licensee for numerous
violations in the oversight of its manual brachytherapy program.
Additionally, the Kentucky Medical Board investigated the radiation
oncologist for infractions that resulted in rescinding the Kentucky
medical license.
AS12-06 Medical Event at Banner Good Samaritan Medical Center in
Phoenix, Arizona.
Date and Place--December 22, 2010, Phoenix, AZ
Nature and Probable Consequences--Banner Good Samaritan Medical
Center (the licensee) reported that a medical event occurred associated
with an HDR mammosite treatment for breast cancer, involving
approximately 139.5 GBq (3.8 Ci) of iridium-192. The patient was
prescribed to receive a total dose of 34 Gy (3,400 rad) in 10
fractionated doses to the left breast; however, on the ninth treatment,
a kink in one of the catheters apparently caused the source to punch
through the catheter and slide along the skin tissue of the left
breast. The patient received a dose of 20 Gy (2,000 rad) to the skin of
the left breast (wrong treatment site). The patient and referring
physician were informed of this event.
In preparation for the seventh treatment, the licensee had
difficulty in attaching the transfer tube to the HDR unit, and one
catheter kinked. During attempts to straighten and re-attach the
transfer tube, the catheter broke off completely. The licensee used a
technique that it developed to repair the catheter and test its
integrity since the manufacturer provides no specific recommendations
on how to deal with damaged catheters. In addition, the licensee
determined that repairing the catheter was the best option, versus
risking the surgical procedure to replace the catheter. During the
ninth treatment, the patient reported a sensation of electricity on her
left breast during the positioning of the source in one of the
catheters. The remaining catheter treatment was completed without
further complaints by the patient and the sources were retracted into
the normal shielded position. On January 3, 2011, the prescribing
physician noted very faint erythema over the lumpectomy site and no
evidence of erythema where the source had been in contact with the
skin. Later ulcerations developed and healed without further
complication. The licensee concluded that there did not appear to be
any skin effects from the ruptured catheter, and the patient gradually
improved over time.
Cause(s)--The cause of the medical event was a material problem
with the repaired catheter and ineffective procedures for handling a
damaged catheter.
Actions Taken To Prevent Recurrence
Licensee--Corrective actions included changes to the licensee's
procedures so that the entrance site and catheters will be visible by
camera and that the treatment will be interrupted upon any abnormal
observation or response from the patient. In addition, the licensee
procedures were revised so that if kinking or damage to a catheter is
observed and the catheter shows any signs of weakening, the device will
be replaced.
State--The Arizona Radiation Regulatory Agency conducted an
investigation and determined that the licensee's corrective actions
were adequate. No enforcement action was taken, and the State forwarded
the final update of the event to the NRC on May 1, 2012.
AS12-07 Medical Event at Highlands Regional Medical Center in
Prestonsburg, Kentucky
Date and Place--March 17, 2009 (reported on January 14, 2011),
Prestonsburg, KY.
Nature and Probable Consequences--The KDPH performed an inspection
of Highlands Regional Medical Center (the licensee) manual
brachytherapy program on January 14, 2011. The KDPH identified one of
the licensee's authorized users, a radiation oncologist, who the KDPH
investigated in prostate brachytherapy seed implant AO medical events
at Our Lady of Bellefonte Hospital in Ashland, Kentucky (AS12-05). The
KDPH discovered that on March 17, 2009, a patient prescribed to receive
100 Gy (10,000 rad) to the prostate instead received a dose of 160.8 Gy
(16,080 rad). This delivered dosage was approximately 60 percent
greater than the prescribed dosage to the patient. The KDPH documented
procedural violations by the radiation oncologist including written
directives not containing the prescribed or delivered doses, no records
of postprocedure implant doses, and the lack of postprocedure CT scans.
The patient and referring physician were not informed of this event
because the licensee believed that the treatment was satisfactory.
The KDPH uncovered two additional improper prostate seed
implantation events at the licensee's facility performed by the same
radiation oncologist. These two additional events occurred between
February 28, 2008, and April 3, 2008, and in both events the patients
received less than the dose prescribed for the treatment. However,
because of the radiation oncologist's inadequate postprocedure
implantation records, final dose assessments of these events cannot be
performed. The licensee's lack of oversight of the manual brachytherapy
program caused these events to be undetected until the KDPH inspection.
Cause(s)--The cause of the medical event was human error in the
failure of the radiation oncologist to follow the licensee's procedures
and the failure of the licensee to maintain oversight of their
brachytherapy program.
Actions Taken To Prevent Recurrence
Licensee--The licensee's corrective actions included providing
personnel with additional training and removing the radiation
oncologist who performed the implant procedures from the license.
Additionally, the licensee's manual brachytherapy program has been
suspended until the licensee can demonstrate complete regulatory
oversight and compliance with Kentucky regulations.
State--The KDPH conducted an extensive investigation from January
14, 2011 through November 28, 2012, and cited the licensee for numerous
violations in the oversight of its manual brachytherapy program.
Additionally, the Kentucky Medical Board investigated the radiation
oncologist for infractions that resulted in rescinding the Kentucky
medical license.
AS12-08 Medical Event at Eastern Regional Medical Center in
Philadelphia, Pennsylvania
Date and Place--January 19, 2011, Philadelphia, PA
Nature and Probable Consequences--Eastern Regional Medical Center
(the licensee) reported that a medical event occurred associated with a
radioembolization brachytherapy treatment for liver cancer involving
1.42
[[Page 54497]]
GBq (38.3 mCi) of yttrium-90. The patient was prescribed to receive a
total dose of 117 Gy (11,700 rad) to the left lobe of the liver, but
instead received an approximate dose of 257 Gy (25,700 rad). This
delivered dosage was about 120 percent greater than the prescribed
dosage. The patient and referring physician were informed of this
event.
On January 19, 2011, during a formal review, the licensee noted
that the activity delivered to the left lobe of the liver was different
than the activity that was prescribed by the doctor. Upon
investigation, it was determined that a transcription error occurred
while preparing the order form. The error was not recognized upon
receipt of the yttrium-90, because the received amount of yttrium-90
was compared to the amount listed on the order form rather than the
amount prescribed on the written directive. The licensee concluded that
this elevated dose may result in an increased risk of atrophy to the
left lobe of the liver.
Cause(s)--The cause of the medical event was human error in failing
to correctly transcribe the activity from the written directive to the
order form.
Actions Taken To Prevent Recurrence
Licensee--The licensee's corrective actions included the generation
of a computer spreadsheet that populates fields based on initial
calculations, written directives and the order form. In addition,
several procedure modifications were implemented to ensure the correct
dosage is ordered and received.
State--The PA DEP conducted a reactive investigation on January 25,
2011, and identified one violation. The PA DEP inspectors determined
that the licensee failed to implement the procedures developed to
provide high confidence that each yttrium-90 microspheres treatment was
in accordance with the written directive. Specifically, the licensee's
staff did not verify that the activity determined with a dose
calibrator was within 10 percent of the prescribed activity on the
written directive, nor were the decay calculations used to check that
the activity at the time of treatment was as prescribed on the written
directive.
AS12-09 Medical Event at the University of Colorado Hospital in Aurora,
Colorado
Date and Place--July 8, 2011, Aurora, CO
Nature and Probable Consequences--University of Colorado Hospital
(the licensee) reported that a medical event occurred associated with a
patient receiving treatment for Graves Disease. The patient was
prescribed to receive a total dose of approximately 340 Gy (34,000 rad)
to the thyroid gland using 740 MBq (20 mCi) of iodine-131, instead the
patient received 3,748 MBq (101.3 mCi) of iodine-131 resulting in a
dose of approximately 1,722 Gy (172,200 rad). This dosage was in excess
of 400 percent greater than the prescribed dosage to the patient. The
patient and referring physician were informed of this event.
On July 8, 2011, the licensee reported to the Colorado Department
of Health that a patient received the wrong dose of iodine-131. The
licensee stated that the authorized user (AU) reviewed the procedure
with the patient and then left the written directive and all associated
paperwork with the technologists. The technologist who was
administering the iodine-131 to the patient incorrectly assumed that
the patient was receiving treatment for cancer and did not review the
written directive. The technologist then decided to use a therapeutic
dosage of iodine-131, which was intended and labeled for another
patient. The AU discovered this error later that day, when they
attempted to administer the therapeutic dosage of iodine-131 to the
intended patient. On November 10, 2011, and February 8, 2012, the
licensee reported that the patient's thyroid function tests indicated a
normal thyroid function with a small interval change suggesting the
patient is becoming hypothyroid. The difference in the incorrectly
administered iodine-131 dosage is expected to cause hypothyroidism in
the patient and result in the patient needing replacement thyroid
hormone therapy. A less likely possibility is that patient's
hyperthyroidism will reoccur and will need an additional dose of
iodine-131.
Cause(s)--The cause of the medical event was human error in that
the technologist did not properly review the written directive and
label on the iodine-131 dose.
Actions Taken To Prevent Recurrence
Licensee--The licensee's corrective actions included the immediate
suspension of the technician from active duty and an investigation,
followed by procedure additions--including corroboration by two
individuals for therapy doses. The technician was eventually allowed to
return to work, but under the direct supervision of the lead
technologist or supervisor.
State--The Colorado Department of Public Health and Environment
(CDPHE) conducted interviews of the licensee's staff and reviewed the
licensee's written report in July 2011. The CDPHE issued a notice of
violation (NOV) on August 17, 2011, and a followup Compliance Order on
Consent on June 29, 2012.
AS12-10 Medical Event at the Medical Center at Bowling Green in Bowling
Green, Kentucky
Date and Place--November 16, 2011, Bowling Green, KY.
Nature and Probable Consequences--The Medical Center at Bowling
Green (the licensee) reported a medical event associated with a
brachytherapy seed implant procedure to treat prostate cancer. The
licensee scheduled back-to-back seed implant procedures, on consecutive
days, for two patients who were prescribed a dose of 145 Gy (14,500
rad) to the prostate using 79 iodine-125 seeds. The licensee planned
separate seed implant procedures for each patient and used the first
patient's plan to correctly implant the seeds in the first patient.
However, the licensee inadvertently reused the placement procedure for
the first patient while placing the seeds in the second patient. This
resulted in the incorrect placement of the seeds in the second patient
and a dose to the urethra (wrong treatment site) of 310 Gy (31,000
rad). The second patient and referring physician were informed of this
event.
On November 17, 2011, the licensee notified the KDPH that the wrong
permanent prostate brachytherapy implant treatment plan was used on a
patient. The radiation oncologist identified the discrepancy
immediately upon completion of the seed implants on the second patient.
A postprocedure CT and magnetic resonance imaging of the patient's
prostate performed one month later revealed the patient received an
approximate dose of 105.9 Gy (10,590 rad) to the prostate, which was 73
percent of the prescribed dose. The radiation oncologist placed
additional seeds into the patient's prostate to improve coverage and
comply with the treatment plan. The licensee concluded that the medical
event would not have an adverse effect on the second patient.
Cause(s)--The cause of the medical event was human error in that
the radiation oncologist deviated from standard operating procedures
and did not verify the information on the prostate implantation plan.
Actions Taken To Prevent Recurrence
Licensee--The licensee's corrective actions included providing
personnel with additional training on the modified process to ensure
patients are treated using the correct prostate implant plan.
Specifically, an individual will be assigned for printing the prostate
[[Page 54498]]
implant plan, verifying the patient's identity, and signing the
document. Subsequently, a second assigned individual will then verify
the information and sign the document for confirmation.
State--The KDPH conducted a reactive inspection on December 7,
2011, approved the licensee's corrective actions, and did not issue any
violations or penalties for this event.
AS12-11 Medical Event at the University of Toledo in Toledo, Ohio
Date and Place--December 19, 2011, Toledo, OH.
Nature and Probable Consequences--The University of Toledo (the
licensee) reported that a medical event occurred associated with an HDR
brachytherapy treatment for cervical cancer; involving 148.4 GBq (4 Ci)
iridium-192. The patient was prescribed to receive a total dose of 16
Gy (1,600 rad) in four fractionated doses to the cervix (treatment
site). It was later determined that the skin of the patient's right and
left thigh (wrong treatment sites) received doses of 12.51 Gy (1,251
rad) and 12.74 Gy (1,274 rad), respectively. The patient and referring
physician were informed of this event.
During a followup patient visit in January 2012, the attending
physician noticed a reddening of the skin (erythema) on both the right
and left upper thighs of the patient. Upon investigation, the licensee
did not identify any errors with the treatment plan, but discovered a
problem with the hardware used during the procedure. During the
treatment, a tandem is inserted into the patient, and a catheter for
the sealed source is inserted in the tandem. The vendor had recently
switched to a new catheter model that was slightly larger in diameter
and thicker than the original. During the procedure, the catheter got
caught on a minor blockage in the tandem and was not fully inserted,
and the source was approximately 9 centimeter (cm) away from the
treatment site. The misplaced source resulted in a total dose of 13.94
Gy (1,394 rad) to the treatment site and excessive doses to the
patient's thighs. As of March 21, 2012, the attending physician
reported that the patient had fully recovered from the medical event.
The patient reported no bowel or bladder problems, and the damaged skin
areas had totally healed. The physician does not anticipate significant
acute or long-term complications because of this medical event.
Cause(s)--The cause of the medical event was human error in that
the licensee failed to recognize that the catheter was not fully
inserted into the tandem during at least one of the fractionated doses.
A contributing factor was the change in catheter construction, which
allowed it to get caught on the blockage in the tandem.
Actions Taken To Prevent Recurrence
Licensee--The corrective action taken by the licensee includes
marking the new catheters to provide a visual indication of full
insertion into the tandem and inservice training for all staff involved
in HDR treatments.
State--The Ohio Department of Health (ODH) conducted an onsite
investigation and reviewed the incident causes and corrective actions.
In February 2012, the ODH issued a notice to all Ohio licensees
advising them to verify procedures to preclude a recurrence of this
event.
NRC12-02 Medical Event at Benefis Hospital in Great Falls, Montana
Date and Place--January 5, 2012, Great Falls, MT.
Nature and Probable Consequences--Benefis Hospital (the licensee)
reported that a medical event occurred associated with an HDR
brachytherapy treatment for esophageal cancer. The treatment involved
the use of 233.1 GBq (6.3 Ci) of iridium-192 and the patient was
prescribed to receive a total dose of 7 Gy (700 rad) to the esophageal
region (treatment site). However, it was determined that a 4 cm length
of tissue in the nasal and nasopharyngeal sinus area (wrong treatment
site) received a dose of 10 Gy (1,000 rad). The patient and referring
physician were informed of this event.
On January 5, 2012, while planning the treatment, the authorized
medical physicist (AMP) determined the placement of the source using a
radio-opaque marker wire to simulate the source with imaging software.
During the treatment, a nasogastric (NG) tube is inserted into the
patient through the nostril, allowing for positioning of the HDR
catheter and source at the treatment site. The NG tubes also have
radio-opaque markers to aid in their placement in the patient, which
the AMP mistook for the radio-opaque markers on the simulation wire.
This error by the AMP was compounded by the lack of CT images of the
patient's anatomy where the simulation wire was positioned. When the
medical staff removed the HDR catheter and NG tube at the end of the
procedure, they discovered that the HDR catheter had not been fully
inserted into the NG tube. The licensee performed an investigation and
determined that the dose was actually delivered to a location 29 cm
away from the treatment site. The licensee concluded that the medical
event would not have an adverse effect on the patient.
Cause(s)--The cause of the medical event was human error in that
the AMP failed to recognize the source's correct placement relative to
the treatment site.
Actions Taken To Prevent Recurrence
Licensee--The corrective action taken by the licensee included
procedure modification such that catheter length measurements are
performed before treatment and the NG tube and HDR catheter are
introduced to the patient as a unit, rather than separately.
Additionally, CT scans will be taken to cover the entire length of the
HDR catheter during all HDR procedures.
NRC--The NRC conducted a special inspection on January 18, 2012,
and contracted with a medical consultant to review the event. The NRC's
medical consultant agreed with the hospital's analysis of this event,
and the NRC issued a NOV to the licensee.
AS12-12 Medical Event at Presbyterian Hospital in Charlotte, North
Carolina
Date and Place--January 5 and 12, 2012, Charlotte, NC.
Nature and Probable Consequences--Presbyterian Hospital (the
licensee) reported that a medical event occurred associated with an HDR
brachytherapy treatment for gastric cancer; the treatment involved
185.4 GBq (5 Ci) of iridium-192. The patient was prescribed to receive
three fractionated doses of 7 Gy (700 rad) to the common bile duct
(treatment site). However, it was determined that a 4 cm length of
tissue in the common bile duct and liver (wrong treatment sites)
received a dose of 14 Gy (1,400 rad). The patient and referring
physician were informed of this event.
On January 18, 2012, while conducting the third fractionated HDR
brachytherapy treatment for gastric cancer, the dosimetrist noticed
that incorrect dwell location was used on the previous two fractioned
treatments. On the previous fractionated treatment dates, January 5,
2012, and January 12, 2012, the dwell position on the HDR was
mistakenly adjusted outward rather than inward. This resulted in
treating only 1 cm of the desired treatment site of the common bile
duct and delivered a dose of 14 Gy (1,400 rad) to 4 cm of the proximal
portion of the bile duct and surrounding liver tissue. The licensee
concluded that the medical event would not have an adverse effect on
the patient.
Cause(s)--The cause of the medical event was human error in that
the
[[Page 54499]]
oncology staff presumed that the source position had been properly
adjusted by the medical physics staff and did not notice this error
until the third fractionated treatment.
Actions Taken To Prevent Recurrence
Licensee--The corrective action taken by the licensee included a
procedure modification such that any catheter dwell position
adjustments of greater than 5 millimeters (mm) mandate a replanning of
the treatment protocol.
State--The North Carolina Division of Radiation Protection
conducted a full inspection of the brachytherapy program (to include
HDR) on February 16, 2012. There were no items of noncompliance, and
the State reviewed and approved corrective actions. The State did not
issue any violations or penalties for this event.
NRC12-03 Medical Event at Avera McKennan Hospital in Sioux Falls, South
Dakota
Date and Place--January 16 and 17, 2012, Sioux Falls, SD.
Nature and Probable Consequences--Avera McKennan Hospital (the
licensee) reported that a medical event occurred associated with an HDR
brachytherapy treatment for breast cancer. The patient was prescribed
to receive 10 fractionated doses of 3.4 Gy (340 rad) for a total dose
of 34 Gy (3,400 rad) to the tumor site (treatment site). However, it
was determined that the skin tissue over the rib cage (wrong treatment
site) received a dose of 27.2 Gy (2,720 rad). The patient and referring
physician were informed of this event.
On January 16, 2012, while conducting the fractionated HDR
brachytherapy treatment for breast cancer, the medical staff identified
that an incorrect treatment parameter length had been entered into the
HDR. The programmed length was 10 cm too short and resulted in the
source traveling to a location 10 cm short of the intended treatment
site (inside the breast). This caused an unintended dose to the skin
over the rib cage. This error was corrected and saved as a secondary
treatment plan in the HDR console, which the staff used to correctly
administer the second fractionated treatment. However, after the staff
delivered the third fraction the following day (January 17, 2012), it
was discovered that the original incorrect treatment plan had been
inadvertently selected by the console operator, resulting in a second
instance where the skin over the rib cage received an unintended dose.
The licensee performed an investigation and the NRC contracted with a
medical consultant, who determined that the patient received
approximately 27.2 Gy (2,720 rad) of unintended skin dose and concluded
that the event would not have an adverse effect on the patient. The
patient experienced skin erythema, or reddening, as was expected from
this level of skin exposure.
Cause(s)--The cause of the medical event was that the licensee
failed to develop and implement effective procedures to ensure that
patient treatment was in accordance with the written directive.
Actions Taken To Prevent Recurrence
Licensee--The corrective actions taken by the licensee included
extensive revisions to the HDR procedures, including the development of
requirements for independent verification of treatment parameter
lengths, and staff training on these changes. The hospital also made
organizational and personnel changes to improve the facility's safety
culture.
NRC--The NRC conducted a special inspection from January 30 through
February 2, 2012, and identified several procedural weaknesses in the
licensee's HDR program. On October 3, 2012, the NRC issued a NOV and
civil penalty to the licensee.
AS12-13 Medical Event at Thomas Jefferson University Hospital in
Philadelphia, Pennsylvania
Date and Place--January 19, 2012, Philadelphia, PA.
Nature and Probable Consequences--Thomas Jefferson University
Hospital (the licensee) reported that a medical event occurred
associated with a radioembolization brachytherapy treatment of liver
cancer for two patients. The first patient received a dose of 0.33 GBq
(8.9 mCi) of yttrium-90 to the liver, but this was the dose prescribed
for a second patient, which was 36 percent less than prescribed. The
second patient received the dosage for the first patient, which was
0.514 GBq (13.9 mCi) or approximately 80 Gy (8,000 rad) and 64 percent
greater than prescribed. The patients and referring physicians were
informed of this event.
On January 20, 2012, the licensee reported that on the previous day
the licensee administered the incorrect prescribed dosage of yttrium-90
to two patients. The licensee stated that the two patients were
scheduled to be treated on the same day, in close time proximity, and
that the worksheets were switched and each patient received the other
patient's dose. The licensee concluded that the medical event would not
have an effect on the two patients. However, the first patient received
a higher dose than planned during the next scheduled treatment to
compensate for the previous lower dosage described in this event. No
adverse medical conditions are expected. The clinical judgment with
respect to the second patient is that even though the dosage was 35
percent above that prescribed in the written directive, the activity
was within levels acceptable for this particular patient and tumor
size.
Cause(s)--The cause of the medical event was human error in that
the medical staff did not verify the written directive before
commencing the treatment, coupled with the erroneous transposition of
the written directives in each patient's file.
Actions Taken To Prevent Recurrence
Licensee--The corrective actions taken by the licensee include
developing and implementing written procedures to both minimize the
chance of errors occurring in the microsphere dose preparation process
and to identify and correct any such errors before administration.
Independent checks by multiple individuals will be made to verify
patient identity, treatment site, and prescribed dosage relative to the
prepared dosage.
State--The PA DEP conducted a reactive investigation on January 26,
2012, and identified inadequacies in the administration procedure to
provide assurances that each treatment is in accordance with the
written directive. A NOV was issued by PA DEP; however, no order or
final action was imposed because a revised dosage administration
procedure was subsequently sent to PA DEP for review.
AS12-14 Medical Event at the Intermountain Medical Center in Murray,
Utah
Date and Place--February 2, 2012, Murray, UT.
Nature and Probable Consequences--The Intermountain Medical Center
(the licensee) reported that a medical event occurred associated with a
radioembolization brachytherapy treatment of liver cancer. The
treatment plan prescribed 5.32 GBq (143.6 mCi) of yttrium-90 to deliver
a total dose of 120 Gy (12,000 rad) to the right lobe of the liver;
however, the patient received the dosage for a different patient. The
dosage administered to the patient was 1.77 GBq (47.8 mCi) of yttrium-
90, which was approximately 33 percent of the prescribed activity or 67
percent lower than the prescribed dose. The resulting dose to the
patient's liver was 39.6 Gy (3,960 rads). The patient and referring
physician were informed of this event.
[[Page 54500]]
On February 2, 2012, two patients were at the licensee's facility
to receive treatment for liver cancer using yttrium-90 microspheres.
The nuclear medicine technologist inadvertently selected the wrong
yttrium-90 microsphere vial and subsequently, administered to the first
patient the dosage that was intended for the second patient. As a
consequence, the first patient received an under dose of approximately
67 percent and because the licensee identified the error prior to
administering any dose to the second patient, the licensee was able to
treat the second patient with the correct dose. The licensee determined
that the medical event would not have an effect on the first patient.
Cause(s)--The cause of the medical event was human error, which
resulted in the licensee administering the wrong radiopharmaceutical
treatment dose to the patient.
Actions Taken To Prevent Recurrence
Licensee--The corrective actions taken by the licensee include a
requirement for two individuals to sign off on the dosage vial, with
the written directive present, before administering the dosage to the
patient. In addition, the licensee committed to following protocol
verification just before treatment to verify the patient's
identification, site being treated, dose to be administered, and the
correct identification on the dose vial.
State--The Utah Department of Environmental Quality, Division of
Radiation Control conducted an investigation on February 6, 2012, and
concluded its investigation on April 19, 2012. The State approved the
licensee's corrective actions and did not issue any violations or
penalties for this event.
AS12-15 Medical Event at Abbott Northwestern Hospital in Minneapolis,
Minnesota
Date and Place--February 2, 2012, Minneapolis, MN.
Nature and Probable Consequences--Abbott Northwestern Hospital (the
licensee) reported to the Minnesota Department of Health (MDH) that a
medical event occurred associated with a SIR-Spheres (microspheres)
treatment of liver cancer involving 1.55 GBq (41.9 mCi) of yttrium-90.
A postprocedure scan of the patient identified a significant undesired
amount of activity in the upper stomach (gastric fundus), spleen and
small intestine (duodenum) (wrong treatment sites). The licensee
estimated doses to these tissues of 44 Gy (4,400 rad), 35 Gy (3,500
rad), and 35 Gy (3,500 rad), respectively. The patient and referring
physician were informed of this event.
On February 3, 2012, the licensee notified MDH that following an
infusion of radioactive yttrium-90, a postprocedure CT scan of the
patient revealed that some of the yttrium-90 was not in the liver as
intended. The scan indicated that 10 to 15 percent of the yttrium-90
appeared in vessels involving the spleen and digestive track. The
patient received followup diagnostic scans to determine a baseline for
future treatment and the long-term prognosis. On February 6, 2012,
after consultation with international and domestic experts, the patient
was administered the radio-protective agent amifostine. The licensee
concluded that the event may result in unintended, permanent functional
damage and some form of future medical intervention was likely needed.
A special review group including surgeons, radiation oncologists, and
interventional radiologists are managing the care of the patient on an
ongoing basis.
Cause(s)--The licensee stated that they had not anticipated any
adverse reactions to this treatment, and that the treatment was
correctly planned and administered. However, the licensee hypothesized
that the cause may have been the result of temporary blood vessel
contractions in the patient due to the passage of the microspheres.
Actions Taken To Prevent Recurrence
Licensee--Corrective actions were not indicated as the licensee
followed appropriate therapy procedures and the treatment had no
unusual implications. Additionally, based upon the large number of this
type of treatment that the licensee has performed, it appears that this
medical event is a rare occurrence.
State--On February 6, 2012, MDH performed an onsite investigation
of the medical event. The MDH concluded that licensee procedures were
appropriately followed and no violations were issued.
AS12-16 Medical Event at Carolina East Medical Center in New Bern,
North Carolina
Date and Place--May 29, 2012, New Bern, NC.
Nature and Probable Consequences--Carolina East Medical Center (the
licensee) reported that a medical event occurred associated with a
manual brachytherapy treatment for prostate cancer. The treatment
consisted of 27 needles containing 65 pre-stranded seeds of iodine-125
with each seed containing 12.6 MBq (0.34 mCi). The physician prescribed
a total dose of 145 Gy (14,500 rad) to the prostate; however, it was
determined during the post implant seed count that all of the seeds
were implanted in the penile bulb (glans) (wrong treatment site). The
resulting dose to the penile bulb was 145 Gy (14,500 rad). The patient
and referring physician were informed of this event.
On May 29, 2012, after completion of the implantation procedure,
the licensee performed a CT scan of the patient to verify the placement
of the implanted seeds. The licensee confirmed that all of the seeds
were improperly implanted in the penile bulb. The patient was informed
the following day, since he had been under the effects of general
anesthesia during and after the procedure. The patient and his family
were counseled at length by the AU within a week of the occurrence of
the medical event. The AU reported that the patient tolerated the
brachytherapy procedure well, without acute toxicity. The AU reported
that anticipated side effects from this event will be similar to the
anticipated side effects from a typical permanent prostate
brachytherapy implant. The licensee concluded that the medical event
would not have a significant medical effect on the patient.
Cause(s)--The cause of the medical event was the incorrect
identification of the prostate during ultrasound imaging resulting in
the improper placement of the brachytherapy seeds.
Actions Taken To Prevent Recurrence
Licensee--The AU compiled a report and discussed corrective actions
with the urologist and the authorized medical physicist. The licensee
revised the procedures to include a mandatory ``time out'' period
during implant procedures, and a quality assurance procedure for pre-
plan ultrasounds. Additional licensee corrective actions include using
single shot fluoroscopy, in addition to ultrasound, to verify placement
of the brachytherapy seed needle at the base of the prostate. Contrast
and other additional enhancements may be used in conjunction with the
fluoroscopy to ensure more accurate imaging results.
State--The North Carolina Division of Radiation Protection
conducted an investigation on June 12, 2012. Two items of noncompliance
were noted: (1) The licensee failed to have documented procedures to
ensure that a therapy is administered in accordance with the written
directive, and (2) the licensee failed to have a program commensurate
with licensed activities. Enforcement actions are pending the
licensee's responses to the State.
[[Page 54501]]
AS12-17 Medical Events at Wheaton Franciscan Healthcare-All Saints in
Racine, Wisconsin
Date and Place--July 15, 2005 through May 20, 2010 (reported on
July 19, 2012), Racine, WI.
Nature and Probable Consequences--Wheaton Franciscan Healthcare-All
Saints (the licensee) reported 15 medical events associated with
prostate brachytherapy seed implant procedures, which occurred between
July 2005 and May 2010. The medical events involved permanent implant
seeds of iodine-125 where the total dose delivered differed from the
prescribed dose by 20 percent or more. The 15 medical events involved
13 patients, including seven patients who received a rectal (wrong
treatment site) dose that exceeded the prescribed prostate dose by more
than 10 Gy (1,000 rads). The patients and physicians were informed of
these events.
The Wisconsin Department of Health Services (WDHS) identified the
medical events during a routine inspection and followed up with a
reactive inspection on July 18, 2012. The WDHS inspectors determined
that the licensee was not reviewing prostate brachytherapy cases
against the medical event criteria. Instead, the licensee was using
established dose-based criteria based upon the postoperative CT scans
of the events. The events involved prostate procedures where the doses
were less than 80 percent or greater than 130 percent of the prescribed
dose, or procedures where the doses to 2 cubic centimeters (cm\3\) of
the rectum or bladder were greater than the prescribed prostate dose.
The AU's review of each of the medical events concluded that the
posterior rows of seeds were placed too close to the rectal mucosa. The
licensee has evaluated all prostate implants performed since 2001. The
licensee concluded that the medical events would not have any adverse
effects on the patients and is monitoring their medical progress.
Cause(s)--The cause of the medical events was human error in that
the licensee was not providing adequate oversight of the permanent
implant prostate brachytherapy program.
Actions Taken To Prevent Recurrence
Licensee--The licensee's corrective actions include: (1) Revising
the prostate implant procedures to include the use of stranded seeds,
(2) allowing only the AU to insert the needles into the prostate, and
(3) a secondary check of the needle position prior to deploying the
seeds. Additionally, the AU is now the only individual who contours the
images on the postoperative CT scan, which is reviewed by the medical
physicist to improve accuracy.
State--The WDHS conducted a reactive inspection on July 18, 2012,
and did not cite the licensee because of the licensee's self-identified
and implemented process improvements prior to the inspection. No
additional cases have met the medical event reporting criteria.
NRC12-04 Medical Event at Deaconess Hospital in Evansville, Indiana
Date and Place--August 15, 2012, Evansville, IN.
Nature and Probable Consequences--Deaconess Hospital (the licensee)
reported that a medical event occurred associated with an HDR mammosite
brachytherapy treatment for breast cancer. The patient was prescribed
to receive 10 fractionated doses for a total dose of 34 Gy (3,400 rad)
to the breast tumor site. However, it was determined that a 4.2-cm
length of skin and fatty breast tissue (wrong treatment sites) received
a dose of 34 Gy (3,400 rad). The patient and referring physician were
informed of this event.
Between March 5 and 9, 2012, the patient received two HDR mammosite
treatments per day to the right breast for a total prescribed dose of
34 Gy (3,400 rad). During a followup appointment on June 11, 2012, it
was noted that the catheter insertion site had not healed. A plastic
surgeon performed surgical removal of the entire skin and breast tissue
area affected by the treatment. The surgical pathology report revealed
a final diagnosis of fat necrosis with granulation tissue radiation
effect. Upon reviewing the pathology report, the prescribing physician
requested complete review of the treatment plan by a qualified
consultant. The consultant discovered that the unintended dose to the
skin and fatty breast tissue was the result of the incorrect
positioning of the HDR source. The possibility of long-term effects are
low, but nonetheless additional skin ulceration and breast tissue
necrosis could occur.
Cause(s)--The cause of the medical event was human error in that
the medical physicist was not familiar with the treatment planning
system for the HDR mammosite device. A contributing factor to the cause
of the event was the licensee's ineffective independent check of the
treatment plan prior to commencing the procedure.
Actions Taken To Prevent Recurrence
Licensee--The corrective actions taken by the licensee include the
independent review, by a qualified third party, of HDR treatment plans
prior to delivery for the first five plans provided by each physician
or physicist. Additionally, the licensee requires the performance of an
additional independent check that verifies the physical orientation of
any channel (catheter) used in an HDR procedure. Finally, the licensee
implemented appropriate training and continuing medical education
programs for all staff participating in HDR procedures.
NRC--The NRC conducted a special inspection on August 22, 2012, and
contracted with a medical consultant to review the event. The NRC's
medical consultant agreed with the hospital's analysis of this event.
On January 31, 2013, the NRC issued a NOV to the licensee.
AS12-18 Medical Event at the Anderson Regional Medical Center in
Meridian, Mississippi
Date and Place--September 10, 2012, Meridian, MS.
Nature and Probable Consequences--Anderson Regional Medical Center
(the licensee) reported that a medical event occurred associated with
an iodine-131 treatment for thyroid carcinoma. The patient was
prescribed to receive a total dose of 25 Gy (2,500 rad) to the thyroid
using 3.7 GBq (100 mCi) of iodine-131. Instead, the patient received
6.03 GBq (162.8 mCi) of iodine-131 for an approximate dose of 40 Gy
(4,000 rad) to the thyroid, which was about 160 percent of the
prescribed dosage to the patient. The patient and referring physician
were informed of this event.
On September 10, 2012, the licensee reported that a patient was
administered 6.03 GBq (162.8 mCi) of iodine-131, instead of the
prescribed 3.7 GBq (100 mCi). An investigation performed by the
licensee revealed that the nuclear medicine technologist misinterpreted
the patient's admission order as a written directive. Specifically, the
nuclear medicine technologist incorrectly interpreted the AU's name and
5.55 GBq (149.9 mCi) of iodine-131 activity on the patient's admission
order as the written directive for the patient's treatment. The written
directive for the patient's treatment was never received by the Nuclear
Medicine Department. The doctor indicated that the patient was
previously treated using a prescribed dose of 100 mCi, and that the
thyroid would be fully saturated with iodine-131. Additionally, the
doctor believes that the thyroid would not have significant uptake of
the excess iodine-131 and this excess would be quickly excreted from
the patient. Therefore, the licensee concluded that this elevated
[[Page 54502]]
dose would not result in any adverse health effects to the patient.
Cause(s)--The medical event was caused by human error coupled with
a new communication process, in which written directives were not
directly communicated to the Nuclear Medicine Department.
Actions Taken To Prevent Recurrence
Licensee--The licensee restored its previous written directive
communication policy, which required the communication of written
directives directly from the AU to the Nuclear Medicine Department and
required written directives for iodine-131 on a specific therapy form.
State--The Mississippi Division of Radiological Health conducted an
investigation on September 19, 2012, and cited the licensee with a
violation for its failure to follow written directive procedures. The
investigation revealed this violation was an isolated incident during a
two-month period where the change in written directive communication
policy took place.
Dated at Rockville, Maryland, this 28th day of August, 2013.
For the Nuclear Regulatory Commission.
Annette Vietti-Cook,
Secretary of the Commission.
[FR Doc. 2013-21477 Filed 9-3-13; 8:45 am]
BILLING CODE 7590-01-P