Combined Notice of Filings #1, 54461-54462 [2013-21414]
Download as PDF
Federal Register / Vol. 78, No. 171 / Wednesday, September 4, 2013 / Notices
tkelley on DSK3SPTVN1PROD with NOTICES
Purpose of the Board: The purpose of
the Board is to make recommendations
to DOE–EM and site management in the
areas of environmental restoration,
waste management and related
activities.
DEPARTMENT OF ENERGY
Tentative Agenda
• Call to Order, Introductions, Review
of Agenda.
• Administrative Issues.
• Public Comments (15 minutes).
• Adjourn.
Breaks Taken As Appropriate.
Public Participation: The EM SSAB,
Paducah, welcomes the attendance of
the public at its advisory committee
meetings and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact Rachel
Blumenfeld as soon as possible in
advance of the meeting at the telephone
number listed above. Written statements
may be filed with the Board either
before or after the meeting. Individuals
who wish to make oral statements
pertaining to agenda items should
contact Rachel Blumenfeld at the
telephone number listed above.
Requests must be received as soon as
possible prior to the meeting and
reasonable provision will be made to
include the presentation in the agenda.
The Deputy Designated Federal Officer
is empowered to conduct the meeting in
a fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments. The EM
SSAB, Paducah, will hear public
comments pertaining to its scope (cleanup standards and environmental
restoration; waste management and
disposition; stabilization and
disposition of non-stockpile nuclear
materials; excess facilities; future land
use and long-term stewardship; risk
assessment and management; and cleanup science and technology activities).
Comments outside of the scope may be
submitted via written statement as
directed above.
Minutes: Minutes will be available by
writing or calling Rachel Blumenfeld at
the address and phone number listed
above. Minutes will also be available at
the following Web site: https://
www.pgdpcab.energy.gov/
2013Meetings.html.
ACTION:
Issued at Washington, DC, on August 27,
2013.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2013–21437 Filed 9–3–13; 8:45 am]
BILLING CODE 6450–01–P
VerDate Mar<15>2010
16:51 Sep 03, 2013
Jkt 229001
Environmental Management SiteSpecific Advisory Board, Savannah
River Site
Department of Energy.
Notice of open meeting.
AGENCY:
This notice announces a
meeting of the Environmental
Management Site-Specific Advisory
Board (EM SSAB), Savannah River Site.
The Federal Advisory Committee Act
(Pub. L. 92–463, 86 Stat. 770) requires
that public notice of this meeting be
announced in the Federal Register.
DATES: Monday, September 23, 2013,
1:00 p.m.–5:30 p.m.
Tuesday, September 24, 2013, 8:30
a.m.–5:00 p.m.
ADDRESSES: Embassy Suites-Savannah,
145 Mulberry Boulevard, Savannah, GA
31322.
FOR FURTHER INFORMATION CONTACT:
Gerri Flemming, Office of External
Affairs, Department of Energy,
Savannah River Operations Office, P.O.
Box A, Aiken, SC 29802; Phone: (803)
952–7886.
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
the Board is to make recommendations
to DOE–EM and site management in the
areas of environmental restoration,
waste management, and related
activities.
SUMMARY:
Tentative Agenda
Monday, September 23, 2013
1:00 p.m.
Combined Committees Session
Order of Committees:
• Administrative and Outreach
Committee
• Facilities Disposition and Site
Remediation Committee
• Nuclear Materials Committee
• Waste Management Committee
• Strategic and Legacy Management
Committee
5:15 p.m.
Public Comment Session
5:30 p.m.
Adjourn
54461
2:30 p.m.
Nuclear Materials Committee Report
Facilities Disposition and Site
Remediation Committee Report
Administrative and Outreach
Committee Report
Public Comment Session
5:00 p.m.
Adjourn
Public Participation: The EM SSAB,
Savannah River Site, welcomes the
attendance of the public at its advisory
committee meetings and will make
every effort to accommodate persons
with physical disabilities or special
needs. If you require special
accommodations due to a disability,
please contact Gerri Flemming at least
seven days in advance of the meeting at
the phone number listed above. Written
statements may be filed with the Board
either before or after the meeting.
Individuals who wish to make oral
statements pertaining to agenda items
should contact Gerri Flemming’s office
at the address or telephone listed above.
Requests must be received five days
prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Gerri Flemming at the
address or phone number listed above.
Minutes will also be available at the
following Web site: https://cab.srs.gov/
srs-cab.html.
Issued at Washington, DC, on August 27,
2013.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2013–21436 Filed 9–3–13; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Tuesday, September 24, 2013
Combined Notice of Filings #1
8:30 a.m.
Opening, Pledge, Approval of
Minutes, Chair and Agency Updates
Public Comment Session
Break
Strategic and Legacy Management
Committee Report
Waste Management Committee Report
Public Comment Session
12:45 p.m.
Lunch Break
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC13–139–000.
Applicants: Basin Creek Equity
Partners L.L.C., Capitol District Energy
Center Cogeneration, Forked River
Power LLC, Pawtucket Power Associates
Limited Partnership, Pittsfield
Generating Company, L.P.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
E:\FR\FM\04SEN1.SGM
04SEN1
tkelley on DSK3SPTVN1PROD with NOTICES
54462
Federal Register / Vol. 78, No. 171 / Wednesday, September 4, 2013 / Notices
Description: Joint Application for
Authorization for Disposition of
Jurisdictional Facilities Pursuant to
Section 203 of the FPA of Basin Creek
Equity Partners, LLC, et al.
Filed Date: 8/26/13.
Accession Number: 20130826–5273.
Comments Due: 5 p.m. ET 9/16/13.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–2238–000.
Applicants: BE Ironwood LLC.
Description: Tariff Cancellation to be
effective 10/25/2013.
Filed Date: 8/26/13.
Accession Number: 20130826–5184.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13–2239–000.
Applicants: Southwest Power Pool,
Inc.
Description: 1883R2 Westar Energy,
Inc. NITSA and NOA to be effective 8/
1/2013.
Filed Date: 8/26/13.
Accession Number: 20130826–5177.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13–2240–000.
Applicants: Southwest Power Pool,
Inc.
Description: 1884R2 Westar Energy,
Inc. NITSA and NOA to be effective 8/
1/2013.
Filed Date: 8/26/13.
Accession Number: 20130826–5180.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13–2241–000.
Applicants: Central Power & Lime
LLC.
Description: Tariff cancellation to be
effective 10/25/2013.
Filed Date: 8/26/13.
Accession Number: 20130826–5185.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13–2242–000.
Applicants: BE Louisiana LLC.
Description: Tariff cancellation to be
effective 10/25/2013.
Filed Date: 8/26/13.
Accession Number: 20130826–5194.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13–2243–000.
Applicants: BE Rayle LLC.
Description: Tariff cancellation to be
effective 10/25/2013.
Filed Date: 8/26/13.
Accession Number: 20130826–5202.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13–2244–000.
Applicants: Cedar Brakes II, L.L.C.
Description: Tariff Cancellation to be
effective 10/25/2013.
Filed Date: 8/26/13.
Accession Number: 20130826–5207.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13–2245–000.
Applicants: Southern California
Edison Company.
VerDate Mar<15>2010
16:51 Sep 03, 2013
Jkt 229001
Description: GIA and Distribution
Service Agmt with Rhodia Inc to be
effective 10/26/2013.
Filed Date: 8/26/13.
Accession Number: 20130826–5217.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13–2246–000.
Applicants: BE Allegheny LLC.
Description: Tariff cancellation to be
effective 10/25/2013.
Filed Date: 8/26/13.
Accession Number: 20130826–5218.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13–2247–000.
Applicants: NorthWestern
Corporation.
Description: SA 689 and 690—Second
Amended GIAs with PPL Montana to be
effective 8/23/2013.
Filed Date: 8/26/13.
Accession Number: 20130826–5220.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13–2248–000.
Applicants: Southwest Power Pool,
Inc.
Description: 1885R2 Westar Energy,
Inc. NITSA and NOA to be effective 8/
1/2013.
Filed Date: 8/26/13.
Accession Number: 20130826–5221.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13–2249–000.
Applicants: Southwest Power Pool,
Inc.
Description: 1887R2 Westar Energy,
Inc. NITSA and NOA to be effective 8/
1/2013.
Filed Date: 8/26/13.
Accession Number: 20130826–5243.
Comments Due: 5 p.m. ET 9/16/13.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR13–10–000.
Applicants: North American Electric
Reliability Corporation.
Description: North American Electric
Reliability Corporation Petition for
Approval of the Further Amendments to
the Amended and Restated Delegation
Agreement with Western Electricity
Coordinating Council.
Filed Date: 8/26/13.
Accession Number: 20130826–5266.
Comments Due: 5 p.m. ET 9/16/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 27, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–21414 Filed 9–3–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–3576–
010;ER11–3401–009.
Applicants: Golden Spread Electric
Cooperative, Inc., Golden Spread
Panhandle Wind Ranch, LLC.
Description: Notice of Change in
Status of Golden Spread Electric
Cooperative, Inc., et al.
Filed Date: 8/27/13.
Accession Number: 20130827–5173.
Comments Due: 5 p.m. ET 9/17/13.
Docket Numbers: ER12–1153–003;
ER11–1846–003; ER11–2516–004;
ER11–2598–006; ER11–1848–003;
ER11–2509–005; ER11–1847–003;
ER11–1850–003; ER12–1152–003.
Applicants: Bounce Energy NY, LLC,
Bounce Energy PA, LLC, Direct Energy
Business, LLC, Direct Energy Marketing,
Inc., Direct Energy Services, LLC,
Energetix, Inc., Energy America, LLC,
Gateway Energy Services Corporation,
NYSEG Solutions, Inc.
Description: Notice of Change in
Status and Notice of Change to
Conditions Related to Former Owners of
Bounce NY et al.
Filed Date: 8/27/13.
Accession Number: 20130827–5063.
Comments Due: 5 p.m. ET 9/17/13.
Docket Numbers: ER13–1430–000.
Applicants: Arlington Valley Solar
Energy II, LLC.
Description: Refund Report to be
effective N/A.
Filed Date: 8/22/13.
Accession Number: 20130822–5164.
Comments Due: 5 p.m. ET 9/12/13.
Docket Numbers: ER13–1910–002.
Applicants: Guzman Power Markets.
Description: Market-Based Rate Tariff
#1 revision to be effective 8/20/2013.
E:\FR\FM\04SEN1.SGM
04SEN1
Agencies
[Federal Register Volume 78, Number 171 (Wednesday, September 4, 2013)]
[Notices]
[Pages 54461-54462]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-21414]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC13-139-000.
Applicants: Basin Creek Equity Partners L.L.C., Capitol District
Energy Center Cogeneration, Forked River Power LLC, Pawtucket Power
Associates Limited Partnership, Pittsfield Generating Company, L.P.
[[Page 54462]]
Description: Joint Application for Authorization for Disposition of
Jurisdictional Facilities Pursuant to Section 203 of the FPA of Basin
Creek Equity Partners, LLC, et al.
Filed Date: 8/26/13.
Accession Number: 20130826-5273.
Comments Due: 5 p.m. ET 9/16/13.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER13-2238-000.
Applicants: BE Ironwood LLC.
Description: Tariff Cancellation to be effective 10/25/2013.
Filed Date: 8/26/13.
Accession Number: 20130826-5184.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13-2239-000.
Applicants: Southwest Power Pool, Inc.
Description: 1883R2 Westar Energy, Inc. NITSA and NOA to be
effective 8/1/2013.
Filed Date: 8/26/13.
Accession Number: 20130826-5177.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13-2240-000.
Applicants: Southwest Power Pool, Inc.
Description: 1884R2 Westar Energy, Inc. NITSA and NOA to be
effective 8/1/2013.
Filed Date: 8/26/13.
Accession Number: 20130826-5180.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13-2241-000.
Applicants: Central Power & Lime LLC.
Description: Tariff cancellation to be effective 10/25/2013.
Filed Date: 8/26/13.
Accession Number: 20130826-5185.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13-2242-000.
Applicants: BE Louisiana LLC.
Description: Tariff cancellation to be effective 10/25/2013.
Filed Date: 8/26/13.
Accession Number: 20130826-5194.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13-2243-000.
Applicants: BE Rayle LLC.
Description: Tariff cancellation to be effective 10/25/2013.
Filed Date: 8/26/13.
Accession Number: 20130826-5202.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13-2244-000.
Applicants: Cedar Brakes II, L.L.C.
Description: Tariff Cancellation to be effective 10/25/2013.
Filed Date: 8/26/13.
Accession Number: 20130826-5207.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13-2245-000.
Applicants: Southern California Edison Company.
Description: GIA and Distribution Service Agmt with Rhodia Inc to
be effective 10/26/2013.
Filed Date: 8/26/13.
Accession Number: 20130826-5217.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13-2246-000.
Applicants: BE Allegheny LLC.
Description: Tariff cancellation to be effective 10/25/2013.
Filed Date: 8/26/13.
Accession Number: 20130826-5218.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13-2247-000.
Applicants: NorthWestern Corporation.
Description: SA 689 and 690--Second Amended GIAs with PPL Montana
to be effective 8/23/2013.
Filed Date: 8/26/13.
Accession Number: 20130826-5220.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13-2248-000.
Applicants: Southwest Power Pool, Inc.
Description: 1885R2 Westar Energy, Inc. NITSA and NOA to be
effective 8/1/2013.
Filed Date: 8/26/13.
Accession Number: 20130826-5221.
Comments Due: 5 p.m. ET 9/16/13.
Docket Numbers: ER13-2249-000.
Applicants: Southwest Power Pool, Inc.
Description: 1887R2 Westar Energy, Inc. NITSA and NOA to be
effective 8/1/2013.
Filed Date: 8/26/13.
Accession Number: 20130826-5243.
Comments Due: 5 p.m. ET 9/16/13.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RR13-10-000.
Applicants: North American Electric Reliability Corporation.
Description: North American Electric Reliability Corporation
Petition for Approval of the Further Amendments to the Amended and
Restated Delegation Agreement with Western Electricity Coordinating
Council.
Filed Date: 8/26/13.
Accession Number: 20130826-5266.
Comments Due: 5 p.m. ET 9/16/13.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 27, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-21414 Filed 9-3-13; 8:45 am]
BILLING CODE 6717-01-P