Combined Notice of Filings #1, 53748-53749 [2013-21196]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
53748
Federal Register / Vol. 78, No. 169 / Friday, August 30, 2013 / Notices
Docket Numbers: ER13–2205–000.
Applicants: Dominion Energy
Marketing, Inc.
Description: Compliance- Amend Cert
of Concurrence Chg to DEMI to be
effective 8/21/2013.
Filed Date: 8/20/13.
Accession Number: 20130820–5089.
Comments Due: 5 p.m. e.t. 9/10/13.
Docket Numbers: ER13–2206–000.
Applicants: Avista Corporation.
Description: Avista Corporation
submits Average System Cost Filing for
Sales of Electric Power to the Bonneville
Power Administration, FY 2014–2015.
Filed Date: 8/20/13.
Accession Number: 20130820–5098.
Comments Due: 5 p.m. e.t. 9/10/13.
Docket Numbers: ER13–2207–000.
Applicants: Arizona Public Service
Company.
Description: SA No. 328 between APS
and Novo Bio Power to supercede and
cancel SA No. 215 to be effective 8/1/
2013.
Filed Date: 8/20/13.
Accession Number: 20130820–5102.
Comments Due: 5 p.m. e.t. 9/10/13.
Docket Numbers: ER13–2208–000.
Applicants: Entergy Arkansas, Inc.
Description: Collation Value
Correction Filing to be effective 7/14/
2010.
Filed Date: 8/21/13.
Accession Number: 20130821–5000.
Comments Due: 5 p.m. e.t. 9/11/13.
Docket Numbers: ER13–2209–000.
Applicants: Consolidated Edison
Company of New York, Inc., New York
Independent System Operator, Inc.
Description: Con Edison 205 revisions
to OATT 14.3—Grandfathered
Agreement expiration to be effective 10/
20/2013.
Filed Date: 8/21/13.
Accession Number: 20130821–5083.
Comments Due: 5 p.m. e.t. 9/11/13.
Docket Numbers: ER13–2210–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
Resource Termination—Constellation.
Filed Date: 8/21/13.
Accession Number: 20130821–5129.
Comments Due: 5 p.m. e.t. 9/11/13.
Docket Numbers: ER13–2211–000.
Applicants: Southwest Power Pool,
Inc.
Description: 2479R1 KMEA and KCPL
Meter Agent Services Agreement to be
effective 8/1/2013.
Filed Date: 8/21/13
Accession Number: 20130821–5132.
Comments Due: 5 p.m. e.t. 9/11/13.
Docket Numbers: ER13–2212–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
Resource Termination—Waterbury
Generation.
VerDate Mar<15>2010
18:00 Aug 29, 2013
Jkt 229001
Filed Date: 8/21/13.
Accession Number: 20130821–5133.
Comments Due: 5 p.m. e.t. 9/11/13.
Docket Numbers: ER13–2213–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
Resource Termination—TransCanada.
Filed Date: 8/21/13.
Accession Number: 20130821–5137.
Comments Due: 5 p.m. e.t. 9/11/13.
Docket Numbers: ER13–2214–000.
Applicants: Southwest Power Pool,
Inc.
Description: 1839R2 City of Osage
City, Kansas NITSA and NOA to be
effective 8/1/2013.
Filed Date: 8/21/13.
Accession Number: 20130821–5139.
Comments Due: 5 p.m. e.t. 9/11/13
Docket Numbers: ER13–2215–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
Resource Termination—Comverge.
Filed Date: 8/21/13.
Accession Number: 20130821–5142.
Comments Due: 5 p.m. e.t. 9/11/13.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF13–600–000.
Applicants: Phoenix Contact Services,
Inc.
Description: Form 556—Notice of
Self-certification of qualifying
cogeneration facility status of Phoenix
Contact Services, Inc.
Filed Date: 8/20/13.
Accession Number: 20130820–5022.
Comments Due: None Applicable.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 21, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–21193 Filed 8–29–13; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1740–001.
Applicants: Wisconsin Public Service
Corporation.
Description: Executed Coordination
Agreement to be effective 5/20/2013.
Filed Date: 8/23/13.
Accession Number: 20130823–5052.
Comments Due: 5 p.m. ET 9/13/13.
Docket Numbers: ER13–1741–001.
Applicants: Upper Peninsula Power
Company.
Description: UPPCO Executed
Coordination to be effective 5/20/2013.
Filed Date: 8/23/13.
Accession Number: 20130823–5051.
Comments Due: 5 p.m. ET 9/13/13.
Docket Numbers: ER13–2224–000.
Applicants: Entergy Arkansas, Inc.
Description: LaGen NITSA to be
effective 6/1/2013.
Filed Date: 8/22/13.
Accession Number: 20130822–5176.
Comments Due: 5 p.m. ET 9/12/13.
Docket Numbers: ER13–2225–000.
Applicants: Entergy Arkansas, Inc.
Description: EWOM 5th Rev. NITSA
to be effective 5/1/2013.
Filed Date: 8/22/13.
Accession Number: 20130822–5180.
Comments Due: 5 p.m. ET 9/12/13.
Docket Numbers: ER13–2226–000.
Applicants: Entergy Arkansas, Inc.
Description: Wind Belt PtP Transfer
Agreement #714 to be effective 12/1/
2014.
Filed Date: 8/22/13.
Accession Number: 20130822–5191.
Comments Due: 5 p.m. ET 9/12/13.
Docket Numbers: ER13–2227–000.
Applicants: Southern California
Edison Company.
Description: SGIA and Distribution
Service Agmt with Joshua Tree Solar
Farm to be effective 8/26/2013.
Filed Date: 8/23/13.
Accession Number: 20130823–5000.
Comments Due: 5 p.m. ET 9/13/13.
Docket Numbers: ER13–2228–000.
Applicants: Southern California
Edison Company.
Description: True-Up SGIA and
Distrib Serv Agmt for Site 8 Roof Top
Solar Project to be effective 10/23/2013.
Filed Date: 8/23/13.
Accession Number: 20130823–5001.
Comments Due: 5 p.m. ET 9/13/13.
Docket Numbers: ER13–2229–000.
Applicants: Arizona Public Service
Company.
E:\FR\FM\30AUN1.SGM
30AUN1
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 169 / Friday, August 30, 2013 / Notices
Description: Tariff Modification
Pursuant to Order No. 764 to be
effective 11/1/2013.
Filed Date: 8/23/13.
Accession Number: 20130823–5002.
Comments Due: 5 p.m. ET 9/13/13.
Docket Numbers: ER13–2230–000.
Applicants: Premier Empire Energy,
LLC.
Description: Premier Empire Energy
MBRA Application to be effective 10/1/
2013.
Filed Date: 8/23/13.
Accession Number: 20130823–5050.
Comments Due: 5 p.m. ET 9/13/13.
Docket Numbers: ER13–2231–000.
Applicants: PacifiCorp.
Description: OATT Revised Schedules
4 and 9 to be effective 9/13/2013.
Filed Date: 8/23/13.
Accession Number: 20130823–5088.
Comments Due: 5 p.m. ET 9/13/13.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR13–9–000.
Applicants: North American Electric
Reliability Corporation.
Description: Request of North
American Electric Reliability
Corporation for Acceptance of its 2014
Business Plan and Budget and the 2014
Business Plans and Budgets of Regional
Entities and for Approval of Proposed
Assessments to Fund Budgets.
Filed Date: 8/23/13.
Accession Number: 20130823–5092.
Comments Due: 5 p.m. ET 9/13/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 23, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–21196 Filed 8–29–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
18:00 Aug 29, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–96–000]
Gulf South Pipeline Company, LP,
Petal Gas Storage, LLC; Notice of
Availability of the Environmental
Assessment for the Proposed
Southeast Market Expansion Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Southeast Market Expansion Project
jointly proposed by Gulf South Pipeline
Company, LP (Gulf South) and Petal Gas
Storage, LLC (Petal Gas Storage) in the
above-referenced docket. Gulf South
requests authorization to construct,
operate, and maintain a natural gas
transmission pipeline and related
facilities in Mississippi and Alabama
that would provide an additional
510,500 dekatherms per day of natural
gas capacity to the southeastern United
States.
The EA assesses the potential
environmental effects of the
construction and operation of the
Southeast Market Expansion Project in
accordance with the requirements of the
National Environmental Policy Act
(NEPA). The FERC staff concludes that
approval of the proposed project, with
appropriate mitigating measures, would
not constitute a major federal action
significantly affecting the quality of the
human environment.
The U.S. Army Corps of Engineers
and U.S. Fish and Wildlife Service
participated as cooperating agencies in
the preparation of the EA. Cooperating
agencies have jurisdiction by law or
special expertise with respect to
resources potentially affected by the
proposal and participate in the NEPA
analysis.
The proposed Southeast Market
Expansion Project includes the
following facilities:
• Approximately 70.1 miles of 30inch-diameter and 24-inch-diameter
pipeline in Jasper, Forrest, Perry,
Greene, George, and Jackson Counties,
Mississippi and Mobile County,
Alabama;
• One new 15,900-horsepower (hp)
compressor station located in Forrest
County, Mississippi (Forrest
Compressor Station) at the beginning of
the project pipeline;
• One new 15,900-hp compressor
station located at the intersection of
Gulf South’s existing Index 818 pipeline
and Petal Gas Storage transmission
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
53749
facilities in Jasper County, Mississippi
(Jasper Compressor Station);
• One new 2,415-hp compressor
station located at the intersection of
Gulf South’s existing Index 300 pipeline
and the Pascagoula Lateral in Jackson
County, Mississippi (Moss Point
Compressor Station);
• A new meter and regulator station
and pig1 launcher/receiver facility at
approximate milepost 42.3 of the project
pipeline at an interconnect with Florida
Gas Transmission Company, LLC’s
existing pipeline; and
• Associated appurtenant
aboveground facilities along the
proposed pipeline including mainline
valves, pig launchers and receivers, and
a pressure limiting facility.
The FERC staff mailed copies of the
EA to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the project
area; and parties to this proceeding. In
addition, the EA is available for public
viewing on the FERC’s Web site
(www.ferc.gov) using the eLibrary link.
A limited number of copies of the EA
are available for distribution and public
inspection at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before September 23, 2013.
For your convenience, there are three
methods you can use to file your
comments with the Commission. In all
instances please reference the project
docket number (CP13–96–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at 202–502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature located on the Commission’s
1 A ‘‘pig’’ is a tool that is inserted into and moves
through the pipeline, and is used for cleaning the
pipeline, internal inspections, or other purposes.
E:\FR\FM\30AUN1.SGM
30AUN1
Agencies
[Federal Register Volume 78, Number 169 (Friday, August 30, 2013)]
[Notices]
[Pages 53748-53749]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-21196]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER13-1740-001.
Applicants: Wisconsin Public Service Corporation.
Description: Executed Coordination Agreement to be effective 5/20/
2013.
Filed Date: 8/23/13.
Accession Number: 20130823-5052.
Comments Due: 5 p.m. ET 9/13/13.
Docket Numbers: ER13-1741-001.
Applicants: Upper Peninsula Power Company.
Description: UPPCO Executed Coordination to be effective 5/20/2013.
Filed Date: 8/23/13.
Accession Number: 20130823-5051.
Comments Due: 5 p.m. ET 9/13/13.
Docket Numbers: ER13-2224-000.
Applicants: Entergy Arkansas, Inc.
Description: LaGen NITSA to be effective 6/1/2013.
Filed Date: 8/22/13.
Accession Number: 20130822-5176.
Comments Due: 5 p.m. ET 9/12/13.
Docket Numbers: ER13-2225-000.
Applicants: Entergy Arkansas, Inc.
Description: EWOM 5th Rev. NITSA to be effective 5/1/2013.
Filed Date: 8/22/13.
Accession Number: 20130822-5180.
Comments Due: 5 p.m. ET 9/12/13.
Docket Numbers: ER13-2226-000.
Applicants: Entergy Arkansas, Inc.
Description: Wind Belt PtP Transfer Agreement 714 to be
effective 12/1/2014.
Filed Date: 8/22/13.
Accession Number: 20130822-5191.
Comments Due: 5 p.m. ET 9/12/13.
Docket Numbers: ER13-2227-000.
Applicants: Southern California Edison Company.
Description: SGIA and Distribution Service Agmt with Joshua Tree
Solar Farm to be effective 8/26/2013.
Filed Date: 8/23/13.
Accession Number: 20130823-5000.
Comments Due: 5 p.m. ET 9/13/13.
Docket Numbers: ER13-2228-000.
Applicants: Southern California Edison Company.
Description: True-Up SGIA and Distrib Serv Agmt for Site 8 Roof Top
Solar Project to be effective 10/23/2013.
Filed Date: 8/23/13.
Accession Number: 20130823-5001.
Comments Due: 5 p.m. ET 9/13/13.
Docket Numbers: ER13-2229-000.
Applicants: Arizona Public Service Company.
[[Page 53749]]
Description: Tariff Modification Pursuant to Order No. 764 to be
effective 11/1/2013.
Filed Date: 8/23/13.
Accession Number: 20130823-5002.
Comments Due: 5 p.m. ET 9/13/13.
Docket Numbers: ER13-2230-000.
Applicants: Premier Empire Energy, LLC.
Description: Premier Empire Energy MBRA Application to be effective
10/1/2013.
Filed Date: 8/23/13.
Accession Number: 20130823-5050.
Comments Due: 5 p.m. ET 9/13/13.
Docket Numbers: ER13-2231-000.
Applicants: PacifiCorp.
Description: OATT Revised Schedules 4 and 9 to be effective 9/13/
2013.
Filed Date: 8/23/13.
Accession Number: 20130823-5088.
Comments Due: 5 p.m. ET 9/13/13.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RR13-9-000.
Applicants: North American Electric Reliability Corporation.
Description: Request of North American Electric Reliability
Corporation for Acceptance of its 2014 Business Plan and Budget and the
2014 Business Plans and Budgets of Regional Entities and for Approval
of Proposed Assessments to Fund Budgets.
Filed Date: 8/23/13.
Accession Number: 20130823-5092.
Comments Due: 5 p.m. ET 9/13/13.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 23, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-21196 Filed 8-29-13; 8:45 am]
BILLING CODE 6717-01-P