Centralized Capacity Markets in Regional Transmission Organizations and Independent System Operators; Supplemental Notice of Technical Conference, 53450-53451 [2013-21106]
Download as PDF
53450
Federal Register / Vol. 78, No. 168 / Thursday, August 29, 2013 / Notices
Description: Macquarie Negotiated
Rate LPS RO to be effective 8/22/2013.
Filed Date: 8/22/13.
Accession Number: 20130822–5075.
Comments Due: 5 p.m. ET 9/3/13.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
sroberts on DSK5SPTVN1PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: PR13–57–000.
Applicants: Enable Oklahoma
Intrastate Transmission, LLC.
Description: Tariff filing per 284.123/
.224: Revised SOC Applicable to
Transportation Services to be effective
8/16/2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5089.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: PR13–58–000.
Applicants: Enable Oklahoma
Intrastate Transmission, LLC.
Description: Tariff filing per 284.123/
.224: Storage Statement of Operating
Conditions to be effective 8/16/2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5091.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: PR13–59–000.
Applicants: Enable Illinois Intrastate
Transmission, LLC.
Description: Tariff filing per 284.123/
.224: IIT Name Change Filing to be
effective 8/16/2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5134.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: PR13–60–000.
Applicants: Enable Illinois Intrastate
Transmission, LLC.
Description: Tariff filing per 284.123/
.224: Cancellation of SOC to be effective
8/16/2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5142.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: RP13–1263–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Tenaska Negotiated Rate
LPS RO to be effective 8/22/2013.
Filed Date: 8/22/13.
Accession Number: 20130822–5035.
Comments Due: 5 p.m. ET 9/3/13.
Docket Numbers: RP13–1264–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Tenaska LPS RO to be
effective 8/22/2013.
Filed Date: 8/22/13.
Accession Number: 20130822–5050.
Comments Due: 5 p.m. ET 9/3/13.
Docket Numbers: RP13–1265–000.
Applicants: Natural Gas Pipeline
Company of America.
VerDate Mar<15>2010
18:34 Aug 28, 2013
Jkt 229001
Docket Numbers: RP13–1266–000.
Applicants: Portland Natural Gas
Transmission System.
Description: Contractual ROFR to be
effective 9/23/2013.
Filed Date: 8/23/13.
Accession Number: 20130823–5017.
Comments Due: 5 p.m. ET 9/4/13.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP13–1254–001.
Applicants: Enable Gas Transmission,
LLC.
Description: Name Change Filing
Amendment to be effective 8/16/2013.
Filed Date: 8/22/13.
Accession Number: 20130822–5116.
Comments Due: 5 p.m. ET 9/3/13.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 23, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–21081 Filed 8–28–13; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Centralized Capacity Markets in
Regional Transmission Organizations
and Independent System Operators;
Supplemental Notice of Technical
Conference
As announced in the Notice issued on
June 17, 2013, and the Supplemental
Notice issued on July 19, 2013, the
Federal Energy Regulatory Commission
(Commission) staff will hold a technical
conference on September 25, 2013 from
9:00 a.m. to approximately 5:00 p.m., to
consider how current centralized
capacity market rules and structures in
the regions served by ISO New England
Inc. (ISO–NE), New York Independent
System Operator, Inc. (NYISO), and PJM
Interconnection, L.L.C. (PJM) are
supporting the procurement and
retention of resources necessary to meet
future reliability and operational
needs.1 The conference will be held at
the Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. This conference
is free of charge and open to the public.
Commission members may participate
in the conference.
A final agenda for this conference,
including speakers, is attached.
The first session will provide an
opportunity for each of the eastern
Regional Transmission Organizations
(RTOs)/Independent System Operators
(ISOs) to give a 15 minute presentation.
The Independent Market Monitors will
then be provided ten minutes to provide
an independent assessment of each
market.
In sessions two, three and four,
panelists will not give opening remarks;
instead, they will respond to questions
posed by Commissioners and staff.
Those panelists are required to file
written statements by Monday,
September 9, 2013. These statements
will be available prior to the conference
on the Commission’s Web site, https://
www.ferc.gov/EventCalendar/Event
Details.aspx?ID=6944&CalType=%20&
CalendarID=116&Date=09/25/2013&
View=Listview.
Each RTO/ISO will have a
representative available throughout the
day to answer any technical questions.
RTO/ISO representatives will also have
an opportunity to respond to ideas
1 While the Commission recognizes that other
regions are considering similar issues, this technical
conference will focus solely on the centralized
capacity markets in the ISO–NE, NYISO, and PJM
regions. The Commission may convene
conference(s) on capacity market issues in other
regions at other times.
E:\FR\FM\29AUN1.SGM
29AUN1
53451
Federal Register / Vol. 78, No. 168 / Thursday, August 29, 2013 / Notices
presented in the final session regarding
considerations for the future.
Following the conference, the
Commission plans to issue a Notice
with follow-on questions for public
comment.
In addition to this Supplemental
Notice, staff is issuing in this docket a
Staff Report, ‘‘Centralized Capacity
Market Design Elements.’’ In the report,
staff examines a set of design elements
present in the centralized capacity
markets operated by ISO–NE, NYISO
and PJM. The report summarizes the
approaches taken by each of these
RTOs/ISOs with respect to these design
elements and discusses the impact
particular market design choices can
have on the procurement of capacity
resources. This review of the mechanics
of current market operations is intended
to provide a common foundation for
broader discussions regarding the
operation of the eastern RTO/ISO
centralized capacity markets. The Staff
Report can be found on the
Commission’s Web site, https://www.
ferc.gov/EventCalendar/Event
Details.aspx?ID=6944&CalType=%20&
CalendarID=116&Date=09/25/
2013&View=Listview.
The technical conference will be
transcribed. Additionally, there will be
a free webcast of the conference. The
webcast will allow persons to listen to
the technical conference, but not
participate. Anyone with Internet access
who wants to listen to the conference
can do so by navigating to the Calendar
of Events at www.ferc.gov and locating
the technical conference in the
Calendar. The technical conference will
contain a link to its webcast. The
Capitol Connection provides technical
support for the webcast and offers the
option of listening to the meeting via
phone-bridge for a fee. If you have any
questions, visit www.CapitolConnection.
org or call 703–993–3100.2
While this conference is not for the
purpose of discussing specific cases, we
note that the discussions at the
conference may address matters at issue
in the following Commission
proceeding(s) that are either pending or
within their rehearing period:
sroberts on DSK5SPTVN1PROD with NOTICES
ISO–NE:
ISO New England Inc .................................................................................................................................................
ISO New England Inc .................................................................................................................................................
ISO New England Inc .................................................................................................................................................
ISO New England Inc .................................................................................................................................................
ISO New England Inc .................................................................................................................................................
ISO New England Inc .................................................................................................................................................
Dominion Energy Marketing, Inc ...............................................................................................................................
ISO New England Inc .................................................................................................................................................
ISO New England Inc .................................................................................................................................................
Dominion Energy Marketing, Inc ...............................................................................................................................
New England Power Generators Association v. ISO New England Inc ...................................................................
New England States Committee on Electricity v. ISO New England Inc ................................................................
NYISO:
New York Independent System Operator, Inc ..........................................................................................................
New York Independent System Operator, Inc ..........................................................................................................
New York Independent System Operator, Inc ..........................................................................................................
New York Independent System Operator, Inc ..........................................................................................................
Independent Power Producers of New York, Inc. v. New York Independent System Operator, Inc ....................
Hudson Transmission Partners, LLC v. New York Independent System Operator, Inc .........................................
Astoria Generating Company, L.P., et al. v. New York Independent System Operator, Inc ..................................
Astoria Generating Company, L.P., et al. v. New York Independent System Operator, Inc ..................................
New York Independent System Operator, Inc ..........................................................................................................
PJM:
PJM Interconnection, L.L.C ........................................................................................................................................
PJM Interconnection, L.L.C ........................................................................................................................................
PJM Interconnection, L.L.C ........................................................................................................................................
Viridity Energy, Inc v. PJM Interconnection, L.L.C ...................................................................................................
Information on the technical
conference will be posted on the
Commission’s Web site, https://
www.ferc.gov/EventCalendar/Event
Details.aspx?ID=6944&CalType=%20&
CalendarID=116&Date=09/25/
2013&View=Listview, prior to the
conference.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–502–8659 (TTY), or send a FAX
to 202–208–2106 with the required
accommodations.
For more information about the
technical conference, please contact:
Shiv Mani (Technical Information),
Office of Energy Policy and
Innovation, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426, (202) 502–
8240, Shiv.Mani@ferc.gov.
Kate Hoke (Legal Information), Office of
the General Counsel, Federal Energy
Regulatory Commission, 888 First
Street NE., Washington, DC 20426,
(202) 502–8404, Katheryn.Hoke@
ferc.gov.
Sarah McKinley (Logistical
Information), Office of External
Affairs, Federal Energy Regulatory
Commission, 888 First Street NE.,
18:34 Aug 28, 2013
Jkt 229001
PO 00000
Frm 00030
Fmt 4703
Sfmt 9990
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
ER13–2149
ER13–2110
ER13–1880
ER13–1877
ER13–1851
ER13–1742
ER13–1291
ER12–1627
ER12–953
EL13–72
EL13–66
EL13–34
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
No.
No.
No.
No.
No.
No.
No.
No.
No.
ER13–1380
ER12–2414
ER12–360
ER10–2371
EL13–62
EL12–98
EL11–50
EL11–42
EL07–39
Docket
Docket
Docket
Docket
No.
No.
No.
No.
ER13–2140
ER13–2108
ER13–535
EL12–54
Washington, DC 20426, (202) 502–
8004, Sarah.McKinley@ferc.gov.
Dated: August 23, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–21106 Filed 8–28–13; 8:45 am]
BILLING CODE 6717–01–P
2 The webcast will continue to be available on the
Calendar of Events on the Commission’s Web site
www.ferc.gov for three months after the conference.
VerDate Mar<15>2010
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
E:\FR\FM\29AUN1.SGM
29AUN1
Agencies
[Federal Register Volume 78, Number 168 (Thursday, August 29, 2013)]
[Notices]
[Pages 53450-53451]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-21106]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Centralized Capacity Markets in Regional Transmission
Organizations and Independent System Operators; Supplemental Notice of
Technical Conference
As announced in the Notice issued on June 17, 2013, and the
Supplemental Notice issued on July 19, 2013, the Federal Energy
Regulatory Commission (Commission) staff will hold a technical
conference on September 25, 2013 from 9:00 a.m. to approximately 5:00
p.m., to consider how current centralized capacity market rules and
structures in the regions served by ISO New England Inc. (ISO-NE), New
York Independent System Operator, Inc. (NYISO), and PJM
Interconnection, L.L.C. (PJM) are supporting the procurement and
retention of resources necessary to meet future reliability and
operational needs.\1\ The conference will be held at the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426. This
conference is free of charge and open to the public. Commission members
may participate in the conference.
---------------------------------------------------------------------------
\1\ While the Commission recognizes that other regions are
considering similar issues, this technical conference will focus
solely on the centralized capacity markets in the ISO-NE, NYISO, and
PJM regions. The Commission may convene conference(s) on capacity
market issues in other regions at other times.
---------------------------------------------------------------------------
A final agenda for this conference, including speakers, is
attached.
The first session will provide an opportunity for each of the
eastern Regional Transmission Organizations (RTOs)/Independent System
Operators (ISOs) to give a 15 minute presentation. The Independent
Market Monitors will then be provided ten minutes to provide an
independent assessment of each market.
In sessions two, three and four, panelists will not give opening
remarks; instead, they will respond to questions posed by Commissioners
and staff. Those panelists are required to file written statements by
Monday, September 9, 2013. These statements will be available prior to
the conference on the Commission's Web site, https://www.ferc.gov/EventCalendar/EventDetails.aspx?ID=6944&CalType=%20&CalendarID=116&Date=09/25/2013&View=Listview.
Each RTO/ISO will have a representative available throughout the
day to answer any technical questions. RTO/ISO representatives will
also have an opportunity to respond to ideas
[[Page 53451]]
presented in the final session regarding considerations for the future.
Following the conference, the Commission plans to issue a Notice
with follow-on questions for public comment.
In addition to this Supplemental Notice, staff is issuing in this
docket a Staff Report, ``Centralized Capacity Market Design Elements.''
In the report, staff examines a set of design elements present in the
centralized capacity markets operated by ISO-NE, NYISO and PJM. The
report summarizes the approaches taken by each of these RTOs/ISOs with
respect to these design elements and discusses the impact particular
market design choices can have on the procurement of capacity
resources. This review of the mechanics of current market operations is
intended to provide a common foundation for broader discussions
regarding the operation of the eastern RTO/ISO centralized capacity
markets. The Staff Report can be found on the Commission's Web site,
https://www.ferc.gov/EventCalendar/EventDetails.aspx?ID=6944&CalType=%20&CalendarID=116&Date=09/25/2013&View=Listview.
The technical conference will be transcribed. Additionally, there
will be a free webcast of the conference. The webcast will allow
persons to listen to the technical conference, but not participate.
Anyone with Internet access who wants to listen to the conference can
do so by navigating to the Calendar of Events at www.ferc.gov and
locating the technical conference in the Calendar. The technical
conference will contain a link to its webcast. The Capitol Connection
provides technical support for the webcast and offers the option of
listening to the meeting via phone-bridge for a fee. If you have any
questions, visit www.CapitolConnection.org or call 703-993-3100.\2\
---------------------------------------------------------------------------
\2\ The webcast will continue to be available on the Calendar of
Events on the Commission's Web site www.ferc.gov for three months
after the conference.
---------------------------------------------------------------------------
While this conference is not for the purpose of discussing specific
cases, we note that the discussions at the conference may address
matters at issue in the following Commission proceeding(s) that are
either pending or within their rehearing period:
ISO-NE:
ISO New England Inc........... Docket No. ER13-2149
ISO New England Inc........... Docket No. ER13-2110
ISO New England Inc........... Docket No. ER13-1880
ISO New England Inc........... Docket No. ER13-1877
ISO New England Inc........... Docket No. ER13-1851
ISO New England Inc........... Docket No. ER13-1742
Dominion Energy Marketing, Inc Docket No. ER13-1291
ISO New England Inc........... Docket No. ER12-1627
ISO New England Inc........... Docket No. ER12-953
Dominion Energy Marketing, Inc Docket No. EL13-72
New England Power Generators Docket No. EL13-66
Association v. ISO New
England Inc.
New England States Committee Docket No. EL13-34
on Electricity v. ISO New
England Inc.
NYISO:
New York Independent System Docket No. ER13-1380
Operator, Inc.
New York Independent System Docket No. ER12-2414
Operator, Inc.
New York Independent System Docket No. ER12-360
Operator, Inc.
New York Independent System Docket No. ER10-2371
Operator, Inc.
Independent Power Producers of Docket No. EL13-62
New York, Inc. v. New York
Independent System Operator,
Inc.
Hudson Transmission Partners, Docket No. EL12-98
LLC v. New York Independent
System Operator, Inc.
Astoria Generating Company, Docket No. EL11-50
L.P., et al. v. New York
Independent System Operator,
Inc.
Astoria Generating Company, Docket No. EL11-42
L.P., et al. v. New York
Independent System Operator,
Inc.
New York Independent System Docket No. EL07-39
Operator, Inc.
PJM:
PJM Interconnection, L.L.C.... Docket No. ER13-2140
PJM Interconnection, L.L.C.... Docket No. ER13-2108
PJM Interconnection, L.L.C.... Docket No. ER13-535
Viridity Energy, Inc v. PJM Docket No. EL12-54
Interconnection, L.L.C.
Information on the technical conference will be posted on the
Commission's Web site, https://www.ferc.gov/EventCalendar/EventDetails.aspx?ID=6944&CalType=%20&CalendarID=116&Date=09/25/2013&View=Listview, prior to the conference.
Commission conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
send an email to accessibility@ferc.gov or call toll free 1-866-208-
3372 (voice) or 202-502-8659 (TTY), or send a FAX to 202-208-2106 with
the required accommodations.
For more information about the technical conference, please
contact:
Shiv Mani (Technical Information), Office of Energy Policy and
Innovation, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426, (202) 502-8240, Shiv.Mani@ferc.gov.
Kate Hoke (Legal Information), Office of the General Counsel, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426, (202) 502-8404, Katheryn.Hoke@ferc.gov.
Sarah McKinley (Logistical Information), Office of External Affairs,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, (202) 502-8004, Sarah.McKinley@ferc.gov.
Dated: August 23, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-21106 Filed 8-28-13; 8:45 am]
BILLING CODE 6717-01-P