Extension of Public Comment Period Hydrogen Energy California's Integrated Gasification Combined Cycle Project Preliminary Staff Assessment and Draft Environmental Impact Statement, 52764-52765 [2013-20713]
Download as PDF
ehiers on DSK2VPTVN1PROD with NOTICES
52764
Federal Register / Vol. 78, No. 165 / Monday, August 26, 2013 / Notices
where the pipeline route crosses the
Gila River.
A 2.2-mile segment of the FlorenceKelvin Highway, a Pinal Countymaintained roadway, would require
realignment as a result of constructing
the facility. A 2.1-mile section of the
road would be relocated north of its
current alignment.
The proposed facility would require
the relocation of the San Carlos
Irrigation Project power line which
currently passes though the northern
portion of the facility footprint. An
approximately 2.3-mile segment of the
power line will be moved north of the
TSF and rerouted around the western
portion of the project area,
approximately following the proposed
and existing alignment of the FlorenceKelvin Highway. The planned rerouted
power line corridor is approximately 3.2
miles in length.
3. Issues: There are several potential
environmental issues that will be
addressed in the Draft EIS. Additional
issues may be identified during the
scoping process. Issues initially
identified for evaluation in the Draft EIS
include:
1. Visual/aesthetics impacts from
landform alterations,
2. air quality impacts from
construction and operation of the
facility,
3. cultural resources (prehistoric and
historic resources),
4. surface water hydrology and
quality,
5. groundwater hydrology and quality,
6. potential land use incompatibility,
7. noise impacts from construction
and operation,
8. Impacts to recreation resources,
9. socioeconomic effects,
10. soils and geotechnical stability
issues,
11. transportation network impacts,
and
12. biological impacts (vegetation,
wildlife, waters of the U.S.).
4. Alternatives: Several alternatives to
the proposed action are being
considered in the Draft EIS. The Draft
EIS will include a co-equal level of
analysis of the No-Action and project
alternatives considered. Currently, there
are five potential off-site project
alternatives being considered along with
the proposed action and two variations
of the proposed action. These
alternatives will be further formulated
and developed during the scoping
process. Additional alternatives may be
developed during scoping that will also
be considered in the Draft EIS.
5. Scoping: The Corps will conduct
two public scoping meetings for the
proposed Ray Mine Tailings Storage
VerDate Mar<15>2010
13:45 Aug 23, 2013
Jkt 229001
Facility Project Draft EIS to receive
public comment and to assess public
concerns regarding the appropriate
scope and preparation of the Draft EIS.
Participation in the public meetings by
federal, state, local, and tribal agencies
and other interested organizations is
encouraged. The first meeting will be
held on September 24, 2013 beginning
at 6:00 p.m. (Arizona Time Zone) at
Kearny Junior-Senior High School, 701
Arizona 177, Kearny, Arizona 85137.
The second meeting will be held on
September 25, 2013 beginning at 6:00
p.m. (Arizona Time Zone) at Apache
Junction High School, 2525 South
Ironwood Drive, Apache Junction,
Arizona 85120. Comments on the
proposed action, alternatives, or any
additional concerns should be
submitted in writing. Written and
electronic comment letters will be
accepted through October 28, 2013.
The Corps also anticipates formally
consulting with the U.S. Fish and
Wildlife Service under Section 7 of the
Endangered Species Act and with the
State Historic Preservation Officer and
appropriate Tribal Historic Preservation
Officers under Section 106 of the
National Historic Preservation Act.
6. Availability of the Draft EIS: The
Draft EIS is expected to be published
and circulated in the fourth quarter of
2014, and a public meeting will be held
after its publication.
Dated: August 12, 2013.
David J. Castanon,
Division Chief, Los Angeles District, U.S.
Army Corps of Engineers.
[FR Doc. 2013–20733 Filed 8–23–13; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF ENERGY
Extension of Public Comment Period
Hydrogen Energy California’s
Integrated Gasification Combined
Cycle Project Preliminary Staff
Assessment and Draft Environmental
Impact Statement
U.S. Department of Energy.
Extension of public comment
period; notice of public hearing.
AGENCY:
ACTION:
The U.S. Department of
Energy (DOE) published a notice of
availability and public hearing on July
22, 2013 (78 FR 43870) that provided for
a comment period ending September 3,
2013. DOE is extening the public
comment period to October 1, 2013 and
announces public hearings for the
Hydrogen Energy California’s Integrated
Gasification Combined Cycle Project
Preliminary Staff Assessment/Draft
SUMMARY:
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
Environmental Impact Statement (PSA/
DEIS) (DOE/EIS—0431D).
DATES: DOE extends the public
comment period to October 1, 2013.
Comments submitted to California
Energy Commission (CEC) or DOE
concerning the Hydrogen Energy
California Project (HECA) prior to this
meeting do not need to be resubmitted
as a result of this extension of the
comment period.
The PSA/DEIS is available on the
internet at
https://www.energy.gov/nepa/
downloads/eis-0431-draftenvironmental-impact-statement or on
the CEC electronic docket site at https://
www.energy.ca.gov/2013publications/
CEC-700-2013-001/CEC-700-2013-001PSA.pdf. Copies of the PSA/DEIS are
available for public review at the
following locations: Beale Memorial
Library, 701 Truxtun Avenue,
Bakersfield, CA 93301; HollowayGonzales Branch Library, 506 E.
Brundage Lane, Bakersfield, CA 93307;
and Southwest Memorial Library, 8301
Ming Avenue, Bakersfield, CA 93301.
Meetings: OE and CEC will hold joint
public hearings as follows:
Tuesday, September 17, 2013,
Buttonwillow Recreation and Park
District, Multi-purpose Facility, 556
Milo Avenue, Buttonwillow, California
93206, 10:00 a.m. CEC Workshop, 6:00
p.m.–8:00 p.m. Formal Public
Comments.
Wednesday, September 18, 2013
(Same location as above), 9:00 a.m.–8:00
p.m. CEC Workshop and Committee
conference, 6:00 p.m.–8:00 p.m. Formal
Public Comments, (Committee
conference may continue after the close
of formal public comment).
FOR FURTHER INFORMATION CONTACT: For
further information on the proposed
project, contact Mr. Fred Pozzuto, U.S.
Department of Energy, National Energy
Technology Laboratory, 3610 Collins
Ferry Road, P.O. Box 880, Morgantown,
WV. Additional information may be
requested by email: fred.pozzuto@
netl.doe.gov or by telephone at (304)
285–5219, or toll free at 1–(800) 432–
8330, ext. 5219. For general information
regarding DOE NEPA process, please
contact: Ms. Carol M. Borgstrom,
Director, Office of NEPA Policy and
Compliance (GC–54), U.S. Department
of Energy, 1000 Independence Avenue
SW., Washington, DC 20585–0103;
telephone: (202) 586–4600. The PSA/
DEIS is available on the internet at
https://www.energy.gov/nepa/
downloads/eis-0431-draftenvironmental-impact-statement or on
the CEC electronic docket site at
https://www.energy.ca.gov/
E:\FR\FM\26AUN1.SGM
26AUN1
Federal Register / Vol. 78, No. 165 / Monday, August 26, 2013 / Notices
2013publications/CEC-700-2013-001/
CEC-700-2013-001-PSA.pdf. Copies of
the PSA/DEIS are available for public
review at the following locations: Beale
Memorial Library, 701 Truxtun Avenue,
Bakersfield, CA 93301; HollowayGonzales Branch Library, 506 E.
Brundage Lane, Bakersfield, CA 93307;
and Southwest Memorial Library, 8301
Ming Avenue, Bakersfield, CA 93301.
Dated: August 20, 2013.
Mark J. Matarrese,
Director, Office of Environment, Security,
Safety & Health, Office of Fossil Energy.
[FR Doc. 2013–20713 Filed 8–23–13; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ehiers on DSK2VPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG13–53–000.
Applicants: RE Columbia 3 LLC.
Description: RE Columbia 3 LLC
Notice of Self-Certification of Exempt
Wholesale Generator Status.
Filed Date: 8/16/13.
Accession Number: 20130816–5124.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: EG13–54–000.
Applicants: RE Columbia, LLC.
Description: RE Columbia, LLC Notice
of Self-Certification of Exempt
Wholesale Generator Status.
Filed Date: 8/16/13.
Accession Number: 20130816–5125.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: EG13–55–000.
Applicants: RE Yakima LLC.
Description: RE Yakima LLC Notice of
Self-Certification of Exempt Wholesale
Generator Status.
Filed Date: 8/16/13.
Accession Number: 20130816–5126.
Comments Due: 5 p.m. ET 9/6/13.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1910–001.
Applicants: Guzman Power Markets
Description: Market-Based Rate Tariff
#1 revision to be effective 8/20/2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5105.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: ER13–2074–001.
Applicants: E.ON Global
Commodities North America LLC.
Description: Amendment to 1 to be
effective 10/1/2013.
Filed Date: 8/16/13.
VerDate Mar<15>2010
13:45 Aug 23, 2013
Jkt 229001
Accession Number: 20130816–5093.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: ER13–2173–000.
Applicants: Southwest Power Pool,
Inc.
Description: 1997R2 City of Mulvane,
Kansas NITSA and NOA to be effective
8/1/2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5131.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: ER13–2174–000.
Applicants: Southwest Power Pool,
Inc.
Description: Order 719 Compliance
Filing—Attachment AE, Section 4.1.2 to
be effective 3/1/2014.
Filed Date: 8/16/13.
Accession Number: 20130816–5145.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: ER13–2175–000.
Applicants: Fairless Energy, LLC.
Description: Compliance Filing—
Amended Single MBR Tariff and Chg of
DF to DEMI to be effective 8/19/2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5158.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: ER13–2176–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Revisions to OATT & OA
re Regional Balancing Operating Reserve
Rate Errata to be effective 10/15/2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5159.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: ER13–2177–000.
Applicants: Southwest Power Pool,
Inc.
Description: 1641R4 GRDA NITSA
and NOA Notice of Cancellation to be
effective 6/1/2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5160.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: ER13–2178–000.
Applicants: California Independent
System Operator Corporation.
Description: 2013–08–16_SMUD_
MEEA to be effective 10/16/2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5161.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: ER13–2179–000.
Applicants: Dominion Bridgeport
Fuel Cell, LLC.
Description: Compliance Filing—
Certificate of Concurrence Chg to DEMI
to be effective 8/19/2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5169.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: ER13–2180–000.
Applicants: New England Hydro
Transmission Electric.
Description: NEHTEC Agreement with
Hydro-Quebec TransEnergie re HVDC
PO 00000
Frm 00008
Fmt 4703
Sfmt 4703
52765
Interconnection to be effective 7/29/
2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5181.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: ER13–2181–000.
Applicants: Southwest Power Pool,
Inc.
Description: 2023R1 Midwest Energy,
Inc. NITSA and NOA Notice of
Cancellation to be effective 6/1/2013.
Filed Date: 8/16/13.
Accession Number: 20130816–5182.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: ER13–2182–000.
Applicants: Entergy Arkansas, Inc.
Description: Collation Value
Correction Filing to be effective 8/1/
2010.
Filed Date: 8/19/13.
Accession Number: 20130819–5000.
Comments Due: 5 p.m. ET 9/9/13.
Docket Numbers: ER13–2183–000.
Applicants: Elwood Energy, LLC.
Description: Compliance Filing—
Amended Cert of Concurrence Chg to
DEMI to be effective 8/19/2013.
Filed Date: 8/19/13.
Accession Number: 20130819–5001.
Comments Due: 5 p.m. ET 9/9/13.
Docket Numbers: ER13–2184–000.
Applicants: Kincaid Generation,
L.L.C.
Description: Compliance Filing—
Amded Cert of Concurrence Chg to
DEMI to be effective 8/20/2013.
Filed Date: 8/19/13.
Accession Number: 20130819–5002.
Comments Due: 5 p.m. ET 9/9/13.
Docket Numbers: ER13–2185–000.
Applicants: Dominion Nuclear
Connecticut, Inc.
Description: Compliance Filing—
Amded Certificate on Concurrence Chg
to DEMI to be effective 8/20/2013.
Filed Date: 8/19/13.
Accession Number: 20130819–5003.
Comments Due: 5 p.m. ET 9/9/13.
Docket Numbers: ER13–2186–000.
Applicants: Duke Energy Progress,
Inc.
Description: Duke Energy Progress,
Inc. submits its Revised Depreciation
Rates under ER13–2186.
Filed Date: 8/16/13.
Accession Number: 20130816–5186.
Comments Due: 5 p.m. ET 9/6/13.
Docket Numbers: ER13–2187–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Midcontinent
Independent System Operator, Inc. files
this calculation of the Cost of New Entry
value (CONE) applicable to the Local
Resource Zones (LRZ) recently
established in the MISO Southern
Region.
E:\FR\FM\26AUN1.SGM
26AUN1
Agencies
[Federal Register Volume 78, Number 165 (Monday, August 26, 2013)]
[Notices]
[Pages 52764-52765]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-20713]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Extension of Public Comment Period Hydrogen Energy California's
Integrated Gasification Combined Cycle Project Preliminary Staff
Assessment and Draft Environmental Impact Statement
AGENCY: U.S. Department of Energy.
ACTION: Extension of public comment period; notice of public hearing.
-----------------------------------------------------------------------
SUMMARY: The U.S. Department of Energy (DOE) published a notice of
availability and public hearing on July 22, 2013 (78 FR 43870) that
provided for a comment period ending September 3, 2013. DOE is extening
the public comment period to October 1, 2013 and announces public
hearings for the Hydrogen Energy California's Integrated Gasification
Combined Cycle Project Preliminary Staff Assessment/Draft Environmental
Impact Statement (PSA/DEIS) (DOE/EIS--0431D).
DATES: DOE extends the public comment period to October 1, 2013.
Comments submitted to California Energy Commission (CEC) or DOE
concerning the Hydrogen Energy California Project (HECA) prior to this
meeting do not need to be resubmitted as a result of this extension of
the comment period.
The PSA/DEIS is available on the internet at https://www.energy.gov/nepa/downloads/eis-0431-draft-environmental-impact-statement or on the
CEC electronic docket site at https://www.energy.ca.gov/2013publications/CEC-700-2013-001/CEC-700-2013-001-PSA.pdf. Copies of
the PSA/DEIS are available for public review at the following
locations: Beale Memorial Library, 701 Truxtun Avenue, Bakersfield, CA
93301; Holloway-Gonzales Branch Library, 506 E. Brundage Lane,
Bakersfield, CA 93307; and Southwest Memorial Library, 8301 Ming
Avenue, Bakersfield, CA 93301.
Meetings: OE and CEC will hold joint public hearings as follows:
Tuesday, September 17, 2013, Buttonwillow Recreation and Park
District, Multi-purpose Facility, 556 Milo Avenue, Buttonwillow,
California 93206, 10:00 a.m. CEC Workshop, 6:00 p.m.-8:00 p.m. Formal
Public Comments.
Wednesday, September 18, 2013 (Same location as above), 9:00 a.m.-
8:00 p.m. CEC Workshop and Committee conference, 6:00 p.m.-8:00 p.m.
Formal Public Comments, (Committee conference may continue after the
close of formal public comment).
FOR FURTHER INFORMATION CONTACT: For further information on the
proposed project, contact Mr. Fred Pozzuto, U.S. Department of Energy,
National Energy Technology Laboratory, 3610 Collins Ferry Road, P.O.
Box 880, Morgantown, WV. Additional information may be requested by
email: fred.pozzuto@netl.doe.gov or by telephone at (304) 285-5219, or
toll free at 1-(800) 432-8330, ext. 5219. For general information
regarding DOE NEPA process, please contact: Ms. Carol M. Borgstrom,
Director, Office of NEPA Policy and Compliance (GC-54), U.S. Department
of Energy, 1000 Independence Avenue SW., Washington, DC 20585-0103;
telephone: (202) 586-4600. The PSA/DEIS is available on the internet at
https://www.energy.gov/nepa/downloads/eis-0431-draft-environmental-impact-statement or on the CEC electronic docket site at https://
www.energy.ca.gov/
[[Page 52765]]
2013publications/CEC-700-2013-001/CEC-700-2013-001-PSA.pdf. Copies of
the PSA/DEIS are available for public review at the following
locations: Beale Memorial Library, 701 Truxtun Avenue, Bakersfield, CA
93301; Holloway-Gonzales Branch Library, 506 E. Brundage Lane,
Bakersfield, CA 93307; and Southwest Memorial Library, 8301 Ming
Avenue, Bakersfield, CA 93301.
Dated: August 20, 2013.
Mark J. Matarrese,
Director, Office of Environment, Security, Safety & Health, Office of
Fossil Energy.
[FR Doc. 2013-20713 Filed 8-23-13; 8:45 am]