Tygart, LLC; Notice of Application Accepted for Filing, Soliciting Motions to Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions, 51717-51718 [2013-20348]
Download as PDF
51717
Federal Register / Vol. 78, No. 162 / Wednesday, August 21, 2013 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12613–004]
mstockstill on DSK4VPTVN1PROD with NOTICES
Tygart, LLC; Notice of Application
Accepted for Filing, Soliciting Motions
to Intervene and Protests, Ready for
Environmental Analysis, and Soliciting
Comments, Recommendations,
Preliminary Terms and Conditions, and
Preliminary Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: 12613–004.
c. Date Filed: April 30, 2013.
d. Applicant: Tygart, LLC.
e. Name of Project: Tygart
Hydroelectric Project.
f. Location: The proposed project
would be located at the U.S. Army
Corps of Engineers’ (Corps) Tygart Dam
on the Tygart River in Taylor County,
West Virginia. The project would
occupy 1 acre of federal land managed
by the Corps.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: David Sinclair,
President, Advanced Hydro Solutions,
3000 Auburn Drive, Suite 430,
Beachwood, OH 44122–4340 or by
email at David.Sinclair@
advancedhydrosolutions.com.
i. FERC Contact: Allyson Conner,
(202) 502–6082 or allyson.conner@
ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
prescriptions: 60 days from the issuance
date of this notice; reply comments are
due 105 days from the issuance date of
this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–12613–004.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The proposed project would utilize
the Corps’ existing Tygart Dam, and
would consist of the following new
facilities: (1) A 15-foot-wide by 21-foothigh steel intake structure; (2) a 270foot-long penstock which would
bifurcate into a 110-foot-long and a 150foot-long penstock; (3) a 121-foot-long
by 99-foot-wide concrete powerhouse;
(4) two unequal-sized turbines with a
combined capacity of 30 megawatts; (5)
an excavated 60-foot-wide by 160-footlong tailrace; (6) a 1.54-mile-long
transmission line; and (7) a switchyard
with appurtenant facilities. The average
annual generation is estimated to be
108,600 megawatt-hours.
The proposed project would operate
in a run-of-release mode using flows
made available by the Corps.
The proposed project boundary would
enclose all of the generating facilities
located on 1 acre of Corps’ land as well
as the transmission line located on 7
acres of privately owned land.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’
‘‘PRELIMINARY TERMS AND
CONDITIONS,’’ or ‘‘PRELIMINARY
FISHWAY PRESCRIPTIONS;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule: The
application will be processed according
to the following revised Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions ............
Commission issues EA ......................................................................................................................................
Comments on EA ...............................................................................................................................................
VerDate Mar<15>2010
16:29 Aug 20, 2013
Jkt 229001
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
E:\FR\FM\21AUN1.SGM
October 13, 2013.
February 10, 2014.
March 12, 2014.
21AUN1
51718
Federal Register / Vol. 78, No. 162 / Wednesday, August 21, 2013 / Notices
Milestone
Target date
Modified terms and conditions ...........................................................................................................................
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3) the
evidence of waiver of water quality
certification.
r. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Comments Due: 5 p.m. ET 8/20/13.
Docket Numbers: RP13–1245–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: New No Notice Service
(NNS–A)—In compliance with App to
Aband Capacity by Lease to be effective
2/1/2014.
Filed Date: 8/13/13.
Accession Number: 20130813–5036.
Comments Due: 5 p.m. ET 8/26/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 14, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Dated: August 14, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–20404 Filed 8–20–13; 8:45 am]
[FR Doc. 2013–20348 Filed 8–20–13; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Combined Notice of Filings #2
Federal Energy Regulatory
Commission
Combined Notice of Filings
mstockstill on DSK4VPTVN1PROD with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP10–149–000.
Applicants: Great Lakes Gas
Transmission Limited Par.
Description: Petition to Amend
Settlement and Motion for Shortened
Answer Period and Expedited Action.
Filed Date: 8/13/13.
Accession Number: 20130813–5099.
VerDate Mar<15>2010
16:29 Aug 20, 2013
Jkt 229001
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–2147–000.
Applicants: Frontier Utilities New
York LLC.
Description: Normal filing name
change to be effective 8/14/2013.
Filed Date: 8/13/13.
Accession Number: 20130813–5049.
Comments Due: 5 p.m. ET 9/3/13.
Docket Numbers: ER13–2148–000.
Applicants: Southern California
Edison Company.
Description: Agmt for Additional SCE
Connection to Eldorado System with
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
May 11, 2014.
LADWP SRP NPC to be effective 8/13/
2013.
Filed Date: 8/13/13.
Accession Number: 20130813–5087.
Comments Due: 5 p.m. ET 9/3/13.
Docket Numbers: ER13–2149–000.
Applicants: ISO New England Inc.
Description: EL13–72–000 to be
effective 6/25/2013.
Filed Date: 8/13/13.
Accession Number: 20130813–5098.
Comments Due: 5 p.m. ET 9/3/13.
Docket Numbers: ER13–2150–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits Notice of
Cancellation of Interim Agmt to be
effective 8/13/2013.
Filed Date: 8/13/13.
Accession Number: 20130813–5114.
Comments Due: 5 p.m. ET 9/3/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 13, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–20402 Filed 8–20–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2848–003;
ER11–1939–005; ER11–2754–005; ER12–
E:\FR\FM\21AUN1.SGM
21AUN1
Agencies
[Federal Register Volume 78, Number 162 (Wednesday, August 21, 2013)]
[Notices]
[Pages 51717-51718]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-20348]
[[Page 51717]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12613-004]
Tygart, LLC; Notice of Application Accepted for Filing,
Soliciting Motions to Intervene and Protests, Ready for Environmental
Analysis, and Soliciting Comments, Recommendations, Preliminary Terms
and Conditions, and Preliminary Fishway Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License.
b. Project No.: 12613-004.
c. Date Filed: April 30, 2013.
d. Applicant: Tygart, LLC.
e. Name of Project: Tygart Hydroelectric Project.
f. Location: The proposed project would be located at the U.S. Army
Corps of Engineers' (Corps) Tygart Dam on the Tygart River in Taylor
County, West Virginia. The project would occupy 1 acre of federal land
managed by the Corps.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: David Sinclair, President, Advanced Hydro
Solutions, 3000 Auburn Drive, Suite 430, Beachwood, OH 44122-4340 or by
email at David.Sinclair@advancedhydrosolutions.com.
i. FERC Contact: Allyson Conner, (202) 502-6082 or
allyson.conner@ferc.gov.
j. Deadline for filing motions to intervene and protests, comments,
recommendations, preliminary terms and conditions, and preliminary
prescriptions: 60 days from the issuance date of this notice; reply
comments are due 105 days from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, recommendations, preliminary
terms and conditions, and preliminary fishway prescriptions using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-12613-004.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The proposed project would utilize the Corps' existing Tygart
Dam, and would consist of the following new facilities: (1) A 15-foot-
wide by 21-foot-high steel intake structure; (2) a 270-foot-long
penstock which would bifurcate into a 110-foot-long and a 150-foot-long
penstock; (3) a 121-foot-long by 99-foot-wide concrete powerhouse; (4)
two unequal-sized turbines with a combined capacity of 30 megawatts;
(5) an excavated 60-foot-wide by 160-foot-long tailrace; (6) a 1.54-
mile-long transmission line; and (7) a switchyard with appurtenant
facilities. The average annual generation is estimated to be 108,600
megawatt-hours.
The proposed project would operate in a run-of-release mode using
flows made available by the Corps.
The proposed project boundary would enclose all of the generating
facilities located on 1 acre of Corps' land as well as the transmission
line located on 7 acres of privately owned land.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit comments, a protest, or a motion to intervene
in accordance with the requirements of Rules of Practice and Procedure,
18 CFR 385.210, .211, and .214. In determining the appropriate action
to take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. A copy of any protest or
motion to intervene must be served upon each representative of the
applicant specified in the particular application. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
o. Procedural Schedule: The application will be processed according
to the following revised Hydro Licensing Schedule. Revisions to the
schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of recommendations, preliminary October 13, 2013.
terms and conditions, and preliminary
fishway prescriptions.
Commission issues EA...................... February 10, 2014.
Comments on EA............................ March 12, 2014.
[[Page 51718]]
Modified terms and conditions............. May 11, 2014.
------------------------------------------------------------------------
p. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
q. A license applicant must file no later than 60 days following
the date of issuance of the notice of acceptance and ready for
environmental analysis provided for in 5.22: (1) A copy of the water
quality certification; (2) a copy of the request for certification,
including proof of the date on which the certifying agency received the
request; or (3) the evidence of waiver of water quality certification.
r. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified intervention
deadline date, a competing development application, or a notice of
intent to file such an application. Submission of a timely notice of
intent allows an interested person to file the competing development
application no later than 120 days after the specified intervention
deadline date. Applications for preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
Dated: August 14, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-20348 Filed 8-20-13; 8:45 am]