Combined Notice of Filings #1, 50406-50407 [2013-20132]
Download as PDF
TKELLEY on DSK3SPTVN1PROD with NOTICES
50406
Federal Register / Vol. 78, No. 160 / Monday, August 19, 2013 / Notices
On April 12, 2011, Northern Pass sent
a letter to DOE ‘‘withdraw[ing] its
support for certain alternatives,’’ and
‘‘request[ing] a 60-day extension of the
[NEPA] scoping period to allow
Northern Pass time to explore whether
there might be additional routing
alternatives, particularly in the North
Country, that would meet the needs of
the Project.’’
On July 1, 2013, Northern Pass
submitted an amended application that
is meant to replace the application that
Northern Pass originally submitted on
October 14, 2010, and supplemented on
February 15, 2011, and April 12, 2011.
In the amended application, Northern
Pass proposes to construct and operate
a primarily overhead high-voltage direct
current (HVDC) electric transmission
line that would originate at an HVDC
converter station to be constructed at
´
the Des Cantons Substation in Quebec,
Canada, then would be converted from
HVDC to alternating current (AC) in
Franklin, NH, and would continue to its
southern terminus in Deerfield, NH
(collectively the ‘‘Project’’). The
proposed facilities would be capable of
transmitting up to 1200 megawatts
(MW) of power.
The New Hampshire portion of the
proposed Project would be a single
circuit 300 kilovolt (kV) HVDC
transmission line of approximately 153
miles from the U.S. border crossing with
Canada near the community of
Pittsburg, NH, to a new HVDC-to-AC
transformer facility to be constructed in
Franklin, NH. From Franklin, NH, to the
Project terminus at the Public Service
Company of New Hampshire’s existing
Deerfield Substation located in
Deerfield, NH, the Project would consist
of 34 miles of 345-kV AC electric
transmission line. The total Project
length would be approximately 187
miles.
The amended proposed route for the
Project remains largely unchanged from
the application submitted on October
14, 2010, for the Central and Southern
sections, but has been substantially
reconfigured for the Northern section.
The amended proposed route continues
to maximize the use of the existing
right-of-way (ROW) in all sections.
The majority of the Northern section
of the amended proposed route has been
moved to a less populated area on
properties that Renewable Properties
Inc., an affiliate of Northern Pass, has
purchased, leased, or obtained an
easement on from landowners. The
amended proposed route includes the
use of additional existing ROW in the
towns of Dummer, Stark, and
Northumberland, NH. It also includes
two underground segments: 2,300 feet
VerDate Mar<15>2010
17:51 Aug 16, 2013
Jkt 229001
and 7.5 miles in the towns of Pittsburg/
Clarksville and Clarksville/
Stewartstown, NH, respectively.
In the Southern section, Northern
Pass previously indicated that a
deviation from the existing ROW would
be necessary if the Federal Aviation
Administration (FAA) requirements
could not be met to locate the proposed
transmission line in the existing ROW
around Concord Airport. Since filing the
original application, Northern Pass has
determined that the Project can meet the
necessary requirements and the
amended proposed route reflects that
the proposed transmission line would
follow the existing ROW near the
Concord Airport.
The amended application also notes
key developments since the Project’s
original application filing, including
information about the potential
environmental, historical, and cultural
impacts of the proposed Project,
information about the transmission
structure locations and heights along the
entire proposed route, and discussion of
certain alternatives suggested through
public comment.
Procedural Matters: Any person may
comment on this application by filing
such comment at the address provided
above. Comments requested in this
Notice of Amended Application, such as
those related to reliability matters,
should not be confused with scoping
comments that continue to be solicited
through a separate process pursuant to
the National Environmental Policy Act
of 1969 (NEPA) regulations. Scoping
comments may be submitted at https://
www.northernpasseis.us/comment/.
Any person seeking to become a party
to this proceeding should file a request
to intervene at the address provided
above in accordance with Rule 214 of
FERC’s Rules of Practice and Procedure
(18 CFR 385.214). Additional copies of
such requests to intervene should also
be filed directly with:
Anne Bartosewicz, Northeast Utilities,
107 Selden Street, Berlin, CT 06037.
Mary Anne Sullivan, Hogan Lovells,
LLP, 555 13th St. NW., Washington,
DC 20004.
Persons who filed a request to
intervene following notice of the
original application (October 14, 2010)
will continue to be considered parties to
this proceeding and need not reapply.
Before a Presidential permit may be
issued, DOE must determine whether
issuance of the permit would be
consistent with the public interest. In
making that determination, DOE
considers the potential environmental
impacts of the proposed project
pursuant to NEPA, determines the
project’s impact on electric reliability by
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
ascertaining whether the proposed
project would adversely affect the
operation of the U.S. electric power
supply system under normal and
contingency conditions, and considers
any other factors that may also be
relevant to the public interest. DOE
must also obtain the favorable
recommendations of the Secretary of
State and the Secretary of Defense
before issuing a Presidential permit.
Copies of the amended application will
be made available, upon request, for
public inspection by accessing the
program Web site at https://energy.gov/
oe/services/electricity-policycoordination-and-implementation/
international-electricity-regulatio-2 or
by emailing Angela Troy at angela.troy@
hq.doe.gov.
Issued in Washington, DC, on August 12,
2013.
Patricia Hoffman,
Assistant Secretary, Office of Electricity
Delivery and Energy Reliability.
[FR Doc. 2013–20129 Filed 8–16–13; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1851–001.
Applicants: ISO New England Inc.
Description: 2013–2014 Emergency
Winter Amendments to be effective 9/6/
2013.
Filed Date: 8/9/13.
Accession Number: 20130809–5118.
Comments Due: 5 p.m. ET 8/19/13.
Docket Numbers: ER13–1953–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 08–08–2013 BREC–KU
T–T IA Revised Concurrence to be
effective 9/3/2013.
Filed Date: 8/9/13.
Accession Number: 20130809–5000.
Comments Due: 5 p.m. ET 8/30/13.
Docket Numbers: ER13–2134–000.
Applicants: Nevada Power Company.
Description: Rate Schedule No. 136
APS Mead-Phoenix Project Concurrence
to be effective 4/22/2013.
Filed Date: 8/8/13.
Accession Number: 20130808–5150.
Comments Due: 5 p.m. ET 8/29/13.
Docket Numbers: ER13–2135–000.
Applicants: Liberty Utilities (CalPeco
Electric) LLC.
Description: Notice of Succession to
be effective 8/9/2013.
E:\FR\FM\19AUN1.SGM
19AUN1
TKELLEY on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 160 / Monday, August 19, 2013 / Notices
Filed Date: 8/8/13.
Accession Number: 20130808–5170.
Comments Due: 5 p.m. ET 8/29/13.
Docket Numbers: ER13–2136–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing per
FERC Order No. 676–G RM05–5–020 to
be effective 5/6/2013.
Filed Date: 8/8/13.
Accession Number: 20130808–5176.
Comments Due: 5 p.m. ET 8/29/13.
Docket Numbers: ER13–2137–000.
Applicants: Westar Energy, Inc.
Description: Midwest Energy Inc.,
Wholesale Power Sales Service to be
effective 10/1/2013.
Filed Date: 8/9/13.
Accession Number: 20130809–5081.
Comments Due: 5 p.m. ET 8/30/13.
Docket Numbers: ER13–2138–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Revisions to the PJM
Tariff re Interconnection Agmt
Execution & Study Deposits to be
effective 10/9/2013.
Filed Date: 8/9/13.
Accession Number: 20130809–5084.
Comments Due: 5 p.m. ET 8/30/13.
Docket Numbers: ER13–2139–000.
Applicants: Merline One, LLC.
Description: Application for Initial
Tariff to be effective 8/9/2013.
Filed Date: 8/9/13.
Accession Number: 20130809–5134.
Comments Due: 5 p.m. ET 8/30/13.
Docket Numbers: ER13–2140–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Revisions to PJM OATT
re Must Offer Requirement Exception
for Deactivation to be effective 10/15/
2013.
Filed Date: 8/9/13.
Accession Number: 20130809–5142.
Comments Due: 5 p.m. ET 8/30/13.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR13–8–000.
Applicants: North American Electric
Reliability Corp.
Description: Petition of North
American Electric Reliability
Corporation for Approval of
Amendments to Exhibit B to the
Delegation Agreement with Southwest
Power Pool, Inc. Amendments to
Southwest Power Pool, Inc. Bylaws.
Filed Date: 8/9/13.
Accession Number: 20130809–5152.
Comments Due: 5 p.m. ET 8/30/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
VerDate Mar<15>2010
17:51 Aug 16, 2013
Jkt 229001
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 9, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–20132 Filed 8–16–13; 8:45 am]
BILLING CODE 6717–01–P
50407
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 12, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–20091 Filed 8–16–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2835–002.
Applicants: Google Energy LLC.
Description: Notice of Change in
Status of Google Energy LLC.
Filed Date: 8/9/13.
Accession Number: 20130809–5190.
Comments Due: 5 p.m. ET 8/30/13.
Docket Numbers: ER13–2141–000.
Applicants: PacifiCorp.
Description: Revised Non-Conforming
Long Term Firm PTP Agreements to be
effective 8/1/2013.
Filed Date: 8/9/13.
Accession Number: 20130809–5165.
Comments Due: 5 p.m. ET 8/30/13.
Docket Numbers: ER13–2142–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Revisions to PJM OATT
and OA re FTR Modeling to be effective
10/8/2013.
Filed Date: 8/9/13.
Accession Number: 20130809–5167.
Comments Due: 5 p.m. ET 8/30/13.
Docket Numbers: ER13–2143–000.
Applicants: Black Bear Development
Holdings, LLC.
Description: MBR Tariff to be effective
9/8/2013.
Filed Date: 8/9/13.
Accession Number: 20130809–5170.
Comments Due: 5 p.m. ET 8/30/13.
The filings are accessible in the
Commission’s eLibrary system by
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP13–1240–000.
Applicants: Southern Star Central Gas
Pipeline, Inc.
Description: ACA Filing—Eff. October
1, 2013 to be effective 10/1/2013.
Filed Date: 8/9/13.
Accession Number: 20130809–5064.
Comments Due: 5 p.m. ET 8/21/13.
Docket Numbers: RP13–1241–000.
Applicants: Granite State Gas
Transmission, Inc.
Description: Compliance Filing 2013
to be effective 10/1/2013.
Filed Date: 8/9/13.
Accession Number: 20130809–5132.
Comments Due: 5 p.m. ET 8/21/13.
Docket Numbers: RP13–1242–000.
Applicants: Enable Gas Transmission,
LLC.
Description: CEGT LLC—August 2013
Negotiated Rate Filing to be effective 8/
12/2013.
Filed Date: 8/12/13.
Accession Number: 20130812–5208.
Comments Due: 5 p.m. ET 8/26/13.
Docket Numbers: RP13–1243–000.
Applicants: Texas Eastern
Transmission, LP.
Description: ConocoPhillips K910662
8–10–2013 Releases to be effective 8/10/
2013.
E:\FR\FM\19AUN1.SGM
19AUN1
Agencies
[Federal Register Volume 78, Number 160 (Monday, August 19, 2013)]
[Notices]
[Pages 50406-50407]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-20132]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER13-1851-001.
Applicants: ISO New England Inc.
Description: 2013-2014 Emergency Winter Amendments to be effective
9/6/2013.
Filed Date: 8/9/13.
Accession Number: 20130809-5118.
Comments Due: 5 p.m. ET 8/19/13.
Docket Numbers: ER13-1953-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: 08-08-2013 BREC-KU T-T IA Revised Concurrence to be
effective 9/3/2013.
Filed Date: 8/9/13.
Accession Number: 20130809-5000.
Comments Due: 5 p.m. ET 8/30/13.
Docket Numbers: ER13-2134-000.
Applicants: Nevada Power Company.
Description: Rate Schedule No. 136 APS Mead-Phoenix Project
Concurrence to be effective 4/22/2013.
Filed Date: 8/8/13.
Accession Number: 20130808-5150.
Comments Due: 5 p.m. ET 8/29/13.
Docket Numbers: ER13-2135-000.
Applicants: Liberty Utilities (CalPeco Electric) LLC.
Description: Notice of Succession to be effective 8/9/2013.
[[Page 50407]]
Filed Date: 8/8/13.
Accession Number: 20130808-5170.
Comments Due: 5 p.m. ET 8/29/13.
Docket Numbers: ER13-2136-000.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing per FERC Order No. 676-G RM05-5-020
to be effective 5/6/2013.
Filed Date: 8/8/13.
Accession Number: 20130808-5176.
Comments Due: 5 p.m. ET 8/29/13.
Docket Numbers: ER13-2137-000.
Applicants: Westar Energy, Inc.
Description: Midwest Energy Inc., Wholesale Power Sales Service to
be effective 10/1/2013.
Filed Date: 8/9/13.
Accession Number: 20130809-5081.
Comments Due: 5 p.m. ET 8/30/13.
Docket Numbers: ER13-2138-000.
Applicants: PJM Interconnection, L.L.C.
Description: Revisions to the PJM Tariff re Interconnection Agmt
Execution & Study Deposits to be effective 10/9/2013.
Filed Date: 8/9/13.
Accession Number: 20130809-5084.
Comments Due: 5 p.m. ET 8/30/13.
Docket Numbers: ER13-2139-000.
Applicants: Merline One, LLC.
Description: Application for Initial Tariff to be effective 8/9/
2013.
Filed Date: 8/9/13.
Accession Number: 20130809-5134.
Comments Due: 5 p.m. ET 8/30/13.
Docket Numbers: ER13-2140-000.
Applicants: PJM Interconnection, L.L.C.
Description: Revisions to PJM OATT re Must Offer Requirement
Exception for Deactivation to be effective 10/15/2013.
Filed Date: 8/9/13.
Accession Number: 20130809-5142.
Comments Due: 5 p.m. ET 8/30/13.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RR13-8-000.
Applicants: North American Electric Reliability Corp.
Description: Petition of North American Electric Reliability
Corporation for Approval of Amendments to Exhibit B to the Delegation
Agreement with Southwest Power Pool, Inc. Amendments to Southwest Power
Pool, Inc. Bylaws.
Filed Date: 8/9/13.
Accession Number: 20130809-5152.
Comments Due: 5 p.m. ET 8/30/13.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 9, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-20132 Filed 8-16-13; 8:45 am]
BILLING CODE 6717-01-P