Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit Drawing, 49509-49510 [2013-19658]

Download as PDF Federal Register / Vol. 78, No. 157 / Wednesday, August 14, 2013 / Notices notice that members of its staff may attend the meeting noted below. Their attendance is part of the Commission’s ongoing outreach efforts. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State Committee Meeting The Federal Energy Regulatory Commission (Commission) hereby gives Docket Docket Docket Docket Docket Docket Docket Docket Docket No. No. No. No. No. No. No. No. No. EL01–88 EL09–50 EL09–61 EL10–55 EL10–65 EL11–63 EL11–65 EL13–41 EL13–43 ....................... ....................... ....................... ....................... ....................... ....................... ....................... ....................... ....................... Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. ER05–1065 .................. ER07–682 .................... ER07–956 .................... ER08–1056 .................. ER10–1350 .................. ER10–2001 .................. ER10–3357 .................. ER11–2161 .................. ER11–3657 .................. ER12–480 .................... ER12–1428 .................. ER12–2681, et al. ........ ER12–2682 .................. ER12–2683 .................. ER12–2693 .................. ER13–288 .................... ER13–432 .................... ER13–665 .................... ER13–769 .................... ER13–770 .................... ER13–948 .................... ER13–1194 .................. ER13–1195 .................. ER13–1317 .................. ER13–1508, et al. ........ ER13–1556 .................. Dated: August 7, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–19661 Filed 8–13–13; 8:45 am] tkelley on DSK3SPTVN1PROD with NOTICES BILLING CODE 6717–01–P Entergy Regional State Committee August 13, 2013 (9 a.m.–3 p.m.). This meeting will be held at the Windsor Court Hotel, 300 Gravier Street, New Orleans, LA 70130. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13625–003; Project No. 14504– 000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit Drawing The Commission has received two preliminary permit applications deemed filed on March 1, 2012, at 8:30 a.m.,1 for proposed projects to be located at the U.S. Army Corps of Engineers’ New 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. See 18 CFR 385.2001(a)(2) (2013). 16:16 Aug 13, 2013 The discussions may address matters at issue in the following proceedings: Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Occidental Chemical Company v. Midwest Independent System Transmission Operator, Inc. Council of the City of New Orleans, Mississippi Public Service Commission, Arkansas Public Service Commission, Public Utility Commission of Texas, Louisiana Public Service Commission Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Arkansas, Inc. Entergy Arkansas, Inc. Entergy Texas, Inc. Entergy Arkansas, Inc. Midwest Independent Transmission System Operator, Inc. Entergy Arkansas, Inc. Entergy Corp., Midwest Independent Transmission System Operator, Inc. and ITC Holdings Corp. Midwest Independent Transmission System Operator, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Midwest Independent Transmission System Operator, Inc. Entergy Arkansas, Inc. and Entergy Mississippi, Inc. Entergy Arkansas, Inc. and Entergy Louisiana, LLC. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. These meetings are open to the public. For more information, contact Patrick Clarey, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (317) 249–5937 or patrick.clarey@ferc.gov. VerDate Mar<15>2010 49509 Jkt 229001 PO 00000 Frm 00066 Fmt 4703 Sfmt 4703 Cumberland Locks and Dam on the Ohio River, near the town of New Cumberland, Hancock County, West Virginia and Jefferson County, Ohio. The applications were filed by Lock+ Hydro Friends Fund XXX, LLC for Project No. 13625 and FFP Project 121, LLC for Project No. 14504. On August 21, 2013, at 10:00 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, between those with 2 See E:\FR\FM\14AUN1.SGM id. § 4.37. 14AUN1 49510 Federal Register / Vol. 78, No. 157 / Wednesday, August 14, 2013 / Notices identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First Street NE., Washington, DC 20426. The Secretary will issue a subsequent notice announcing the results of the drawing. Dated: August 7, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–19658 Filed 8–13–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13–526–000] tkelley on DSK3SPTVN1PROD with NOTICES Tennessee Gas Pipeline Company, LLC; Notice of Request Under Blanket Authorization Take notice that on July 24, 2013, Tennessee Gas Pipeline Company, LLC (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed in Docket No. CP13–526–000, a prior notice request pursuant to sections 157.205, 157.210, and 157.211(a)(2) of the Commission’s regulations under the Natural Gas Act (NGA). Tennessee seeks authorization to modify and operate meter station facilities and appurtenances located in Susquehanna County, Pennsylvania. Tennessee proposes to perform these activities under its blanket certificate issued in Docket No. CP82–413–000 [20 FERC ¶ 62,409 (1982)], all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to Thomas G. Joyce, Manager, Certificates, Tennessee Gas Pipeline Company, LLC, 1001 Louisiana Street, Houston, Texas 77002, or by calling (713) 420–3299 (telephone) or (713) 420–1473 (fax) tom_joyce@kindermorgan.com. Any person or the Commission’s Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR VerDate Mar<15>2010 16:16 Aug 13, 2013 Jkt 229001 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to Section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site (www.ferc.gov) PO 00000 Frm 00067 Fmt 4703 Sfmt 4703 under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. See, 18CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. Dated: August 6, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–19652 Filed 8–13–13; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9900–04–OEI] Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of Montana Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: This notice announces EPA’s approval of the State of Montana’s request to revise its National Primary Drinking Water Regulations Implementation EPA-authorized program to allow electronic reporting. DATES: EPA’s approval is effective September 13, 2013 for the State of Montana’s National Primary Drinking Water Regulations Implementation program, if no timely request for a public hearing is received and accepted by the Agency. FOR FURTHER INFORMATION CONTACT: Evi Huffer, U.S. Environmental Protection Agency, Office of Environmental Information, Mail Stop 2823T, 1200 Pennsylvania Avenue NW., Washington, DC 20460, (202) 566–1697, huffer.evi@epa.gov, or Karen Seeh, U.S. Environmental Protection Agency, Office of Environmental Information, Mail Stop 2823T, 1200 Pennsylvania Avenue NW., Washington, DC 20460, (202) 566–1175, seeh.karen@epa.gov. SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic Reporting Rule (CROMERR) was published in the Federal Register (70 FR 59848) and codified as part 3 of title 40 of the CFR. CROMERR establishes electronic reporting as an acceptable regulatory alternative to paper reporting and establishes requirements to assure that electronic documents are as legally dependable as their paper counterparts. Subpart D of CROMERR requires that state, tribal or local government agencies that receive, SUMMARY: E:\FR\FM\14AUN1.SGM 14AUN1

Agencies

[Federal Register Volume 78, Number 157 (Wednesday, August 14, 2013)]
[Notices]
[Pages 49509-49510]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-19658]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[ Project No. 13625-003; Project No. 14504-000]


 Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice 
Announcing Preliminary Permit Drawing

    The Commission has received two preliminary permit applications 
deemed filed on March 1, 2012, at 8:30 a.m.,\1\ for proposed projects 
to be located at the U.S. Army Corps of Engineers' New Cumberland Locks 
and Dam on the Ohio River, near the town of New Cumberland, Hancock 
County, West Virginia and Jefferson County, Ohio. The applications were 
filed by Lock+ Hydro Friends Fund XXX, LLC for Project No. 13625 and 
FFP Project 121, LLC for Project No. 14504.
---------------------------------------------------------------------------

    \1\ Under the Commission's Rules of Practice and Procedure, any 
document received after regular business hours is considered filed 
at 8:30 a.m. on the next regular business day. See 18 CFR 
385.2001(a)(2) (2013).
---------------------------------------------------------------------------

    On August 21, 2013, at 10:00 a.m. (Eastern Time), the Secretary of 
the Commission, or her designee, will conduct a random drawing to 
determine the filing priority of the applicants identified in this 
notice. The Commission will select among competing permit applications 
as provided in section 4.37 of its regulations.\2\ The priority 
established by this drawing will be used to determine which applicant, 
between those with

[[Page 49510]]

identical filing times, will be considered to have the first-filed 
application.
---------------------------------------------------------------------------

    \2\ See id. Sec.  4.37.
---------------------------------------------------------------------------

    The drawing is open to the public and will be held in room 2C, the 
Commission Meeting Room, located at 888 First Street NE., Washington, 
DC 20426. The Secretary will issue a subsequent notice announcing the 
results of the drawing.

    Dated: August 7, 2013.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2013-19658 Filed 8-13-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.