Environmental Assessment for Potential Lease Issuance and Marine Hydrokinetic Technology Testing Offshore Florida, 49287 [2013-19593]
Download as PDF
Federal Register / Vol. 78, No. 156 / Tuesday, August 13, 2013 / Notices
The Bureau of Land
Management (BLM) is scheduled to file
the plats of survey of the land described
below thirty (30) calendar days from the
date of this publication in the BLM
Wyoming State Office, Cheyenne,
Wyoming.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Bureau of Land Management, 5353
Yellowstone Road, P.O. Box 1828,
Cheyenne, Wyoming 82003.
SUPPLEMENTARY INFORMATION: The
following surveys were executed at the
request of the Bureau of Land
Management:
The plat and field notes representing
the dependent resurvey of a portion of
the subdivisional lines and the
subdivision of section 11, the survey of
a portion of the subdivision of section
11, and the metes and bounds surveys
of Lot 3, section 10, and Lot 15, section
11, Township 51 North, Range 97 West,
Sixth Principal Meridian, Wyoming,
Group No. 875, was accepted August 7,
2013.
The plat representing the entire
record of the dependent resurvey of a
portion of the subdivision of section 15,
and the metes and bounds survey of Lot
2, section 15, Township 12 North, Range
90 West, Sixth Principal Meridian,
Wyoming, Group No. 883, was accepted
August 7, 2013.
Copies of the preceding described
plats and field notes are available to the
public at a cost of $1.10 per page.
Dated: August 7, 2013.
John P. Lee,
Chief Cadastral Surveyor, Division of Support
Services.
[FR Doc. 2013–19646 Filed 8–12–13; 8:45 am]
BILLING CODE 4310–22–P
DEPARTMENT OF THE INTERIOR
Bureau of Ocean Energy Management
[Docket No. BOEM–2013–0007;
MMAA104000]
Environmental Assessment for
Potential Lease Issuance and Marine
Hydrokinetic Technology Testing
Offshore Florida
Bureau of Ocean Energy
Management (BOEM), Interior.
ACTION: Notice of the Availability of a
Revised Environmental Assessment and
a Finding of No Significant Impact.
ehiers on DSK2VPTVN1PROD with NOTICES
AGENCY:
BOEM has prepared a revised
environmental assessment (EA)
considering the environmental impacts
and socioeconomic effects of issuing a
lease in Official Protraction Diagram NG
17–06, Blocks 7003, 7053, and 7054,
SUMMARY:
VerDate Mar<15>2010
15:31 Aug 12, 2013
Jkt 229001
offshore Florida. The proposed lease
would authorize technology testing
activities, including the installation,
operation, relocation, and
decommissioning of technology testing
facilities within the lease area, such as
deployment of technology
demonstration devices, single anchor
moorings, and mooring telemetry buoys.
As a result of the analysis in the revised
EA, BOEM issued a Finding of No
Significant Impact (FONSI). The FONSI
concluded that the environmental
impacts associated with the preferred
alternative would not significantly
impact the environment; therefore, the
preparation of an environmental impact
statement (EIS) is not required.
The purpose of this notice is to inform
the public of the availability of the EA
and FONSI, which can be accessed
online at: https://www.boem.gov/
Renewable-Energy-Program/StateActivities/Florida.aspx.
49287
be viewed at: https://
www.regulations.gov by searching for
Docket ID BOEM–2012–0011.
Dated: August 6, 2013.
Tommy P. Beaudreau,
Director, Bureau of Ocean Energy
Management.
[FR Doc. 2013–19593 Filed 8–12–13; 8:45 am]
BILLING CODE 4310–MR–P
INTERNATIONAL TRADE
COMMISSION
[Docket No 2971]
Certain Flash Memory Chips and
Products Containing the Same
Correction to Notice of Receipt of
Complaint; Solicitation of Comments
Relating to the Public Interest
Authority: This notice of availability
(NOA) of an EA and FONSI is published
pursuant to 43 CFR 46.305.
AGENCY:
FOR FURTHER INFORMATION CONTACT:
ACTION:
Michelle Morin, BOEM Office of
Renewable Energy Programs, 381 Elden
Street, HM 1328, Herndon, Virginia
20170–4817, (703) 787–1340 or
michelle.morin@boem.gov.
SUPPLEMENTARY INFORMATION: On May
24, 2011, BOEM published a Notice of
Intent (NOI) to prepare an EA that
requested public comments on
alternatives for consideration in the EA,
as well as identification of important
environmental issues associated with
data collection and technology testing
activities (76 FR 30184). BOEM
considered these public comments in
drafting the alternatives and assessing
the reasonably foreseeable
environmental impacts associated with
each. Comments received in response to
the NOI can be viewed at: https://
www.regulations.gov by searching for
Docket ID BOEM–2011–0012.
On April 25, 2012, BOEM released an
EA for a 30-day public review (77 FR
24734). During the comment period,
BOEM held a public information
meeting in Fort Lauderdale, Florida on
May 9, 2012, to provide stakeholders an
additional opportunity to offer
comments on the EA. After the
comment period closed, Florida Atlantic
University Southeast National Marine
Renewable Energy Center proposed to
also conduct ocean current turbine tow
tests concurrent with survey activities.
To address the comments received and
consider additional activities associated
with the proposed action, BOEM revised
the EA. All comments received in
response to the April 25, 2012, NOA can
PO 00000
Frm 00038
Fmt 4703
Sfmt 9990
U.S. International Trade
Commission.
Notice.
Correction is made to namedrespondent Macronix International Co.,
Ltd. of Taiwan.
SUMMARY:
The U.S.
International Trade Commission
published a notice (78 FR 48188, August
7, 2013) of receipt of complaint entitled,
Certain Flash Memory Chips and
Products Containing the Same, DN
2971; the Commission solicited
comments on any public interest issues
raised by the complaint or
complainant’s filing under section
210.8(b) of the Commission’s Rules of
Practice and Procedure (19 CFR
210.8(b)). The complaint named as
respondents Macronix International Co.,
Ltd. of Taiwan; Macronix America, Inc.
of CA; Macronix Asia Limited of Japan;
Macronix (Hong Kong) Co., Ltd. of Hong
Kong; Acer Inc. of Taiwan; Acer
America Corporation of CA; ASUSTek
Computer Inc. of Taiwan; Asus
Computer International of CA; Belkin
International, .Inc. of CA; D-Link
Corporation of Taiwan; D-Link System,
Inc. of CA; Netgear Inc. of CA; Nintendo
Co., Ltd. of Japan; and Nintendo of
America, Inc. of WA.
SUPPLEMENTARY INFORMATION:
Issued: August 7, 2013.
Lisa R. Barton,
Acting Secretary to the Commission.
[FR Doc. 2013–19501 Filed 8–12–13; 8:45 am]
BILLING CODE 7020–02–P
E:\FR\FM\13AUN1.SGM
13AUN1
Agencies
[Federal Register Volume 78, Number 156 (Tuesday, August 13, 2013)]
[Notices]
[Page 49287]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-19593]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Ocean Energy Management
[Docket No. BOEM-2013-0007; MMAA104000]
Environmental Assessment for Potential Lease Issuance and Marine
Hydrokinetic Technology Testing Offshore Florida
AGENCY: Bureau of Ocean Energy Management (BOEM), Interior.
ACTION: Notice of the Availability of a Revised Environmental
Assessment and a Finding of No Significant Impact.
-----------------------------------------------------------------------
SUMMARY: BOEM has prepared a revised environmental assessment (EA)
considering the environmental impacts and socioeconomic effects of
issuing a lease in Official Protraction Diagram NG 17-06, Blocks 7003,
7053, and 7054, offshore Florida. The proposed lease would authorize
technology testing activities, including the installation, operation,
relocation, and decommissioning of technology testing facilities within
the lease area, such as deployment of technology demonstration devices,
single anchor moorings, and mooring telemetry buoys. As a result of the
analysis in the revised EA, BOEM issued a Finding of No Significant
Impact (FONSI). The FONSI concluded that the environmental impacts
associated with the preferred alternative would not significantly
impact the environment; therefore, the preparation of an environmental
impact statement (EIS) is not required.
The purpose of this notice is to inform the public of the
availability of the EA and FONSI, which can be accessed online at:
https://www.boem.gov/Renewable-Energy-Program/State-Activities/Florida.aspx.
Authority: This notice of availability (NOA) of an EA and FONSI
is published pursuant to 43 CFR 46.305.
FOR FURTHER INFORMATION CONTACT: Michelle Morin, BOEM Office of
Renewable Energy Programs, 381 Elden Street, HM 1328, Herndon, Virginia
20170-4817, (703) 787-1340 or michelle.morin@boem.gov.
SUPPLEMENTARY INFORMATION: On May 24, 2011, BOEM published a Notice of
Intent (NOI) to prepare an EA that requested public comments on
alternatives for consideration in the EA, as well as identification of
important environmental issues associated with data collection and
technology testing activities (76 FR 30184). BOEM considered these
public comments in drafting the alternatives and assessing the
reasonably foreseeable environmental impacts associated with each.
Comments received in response to the NOI can be viewed at: https://www.regulations.gov by searching for Docket ID BOEM-2011-0012.
On April 25, 2012, BOEM released an EA for a 30-day public review
(77 FR 24734). During the comment period, BOEM held a public
information meeting in Fort Lauderdale, Florida on May 9, 2012, to
provide stakeholders an additional opportunity to offer comments on the
EA. After the comment period closed, Florida Atlantic University
Southeast National Marine Renewable Energy Center proposed to also
conduct ocean current turbine tow tests concurrent with survey
activities. To address the comments received and consider additional
activities associated with the proposed action, BOEM revised the EA.
All comments received in response to the April 25, 2012, NOA can be
viewed at: https://www.regulations.gov by searching for Docket ID BOEM-
2012-0011.
Dated: August 6, 2013.
Tommy P. Beaudreau,
Director, Bureau of Ocean Energy Management.
[FR Doc. 2013-19593 Filed 8-12-13; 8:45 am]
BILLING CODE 4310-MR-P