Rivermill Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption, 48670 [2013-19290]
Download as PDF
48670
Federal Register / Vol. 78, No. 154 / Friday, August 9, 2013 / Notices
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link.
Dated: August 2, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–19238 Filed 8–8–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 9403–007]
Rivermill Hydroelectric, Inc., New
Hampshire Hydro Associates; Notice
of Transfer of Exemption
August 5, 2013.
1. By letter filed July 19, 2013,
Rivermill Hydroelectric, Inc. and New
Hampshire Hydro Associates informed
the Commission that the exemption
from licensing for the HDI Mascoma
Dam Project,1 FERC No. 9403, originally
issued September 21, 1988,2 has been
transferred to New Hampshire Hydro
Associates. The project is located on the
Mascoma River in Grafton County, New
Hampshire. The transfer of an
exemption does not require Commission
approval.
2. New Hampshire Hydro Associates
is now the exemptee of the HDI
Mascoma Dam Project, FERC No. 9403.
All correspondence should be
forwarded to Rivermill Hydroelectric,
Inc., c/o Essex Hydro Associates, L.L.C.,
located at 55 Main Street, 4th Floor,
Boston, MA 02108.
Dated: August 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–19290 Filed 8–8–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
pmangrum on DSK3VPTVN1PROD with NOTICES
Western Area Power Administration
Boulder Canyon Project
Western Area Power
Administration, DOE.
AGENCY:
1 On July 29, 2013, Commission staff spoke with
the exemptee and confirmed correct project name
is HDI Mascoma Dam Project.
2 44 FERC ¶ 62,273, Order Granting Exemption
from Licensing (5 MW or Less).
VerDate Mar<15>2010
14:54 Aug 08, 2013
Jkt 229001
ACTION:
Notice of Base Charge and Rates.
In this notice, the Deputy
Secretary of Energy (Deputy Secretary)
approves the Fiscal Year (FY) 2014 Base
Charge and Rates for Boulder Canyon
Project (BCP) electric service provided
by the Western Area Power
Administration (Western). The Base
Charge will provide sufficient revenue
to pay all annual costs, including
interest expense, and repay investments
within the allowable period.
DATES: The revised Base Charge and
Rates will be effective the first day of
the first full billing period beginning on
or after October 1, 2013, and will stay
in effect through September 30, 2014, or
until superseded.
FOR FURTHER INFORMATION CONTACT: Mr.
Jack Murray, Rates Manager, Desert
Southwest Customer Service Region,
Western Area Power Administration,
P.O. Box 6457, Phoenix, AZ 85005–
6457, (602) 605–2442, email
jmurray@wapa.gov.
SUMMARY:
Hoover
Dam, authorized by the Boulder Canyon
Project Act (45 Stat. 1057, December 21,
1928), sits on the Colorado River along
the Arizona and Nevada border. The
Hoover Dam powerplant has 19
generating units (two for plant use) and
an installed capacity of 2,078,800
kilowatts (kW) (4,800 kW for plant use).
High-voltage transmission lines and
substations connect BCP power to
consumers in southern Nevada,
Arizona, and southern California. BCP
electric service rates are adjusted
annually using an existing rate formula
established on April 19, 1996. The rate
formula requires the BCP Contractors to
pay a Base Charge (expressed in
dollars), rather than a rate, for their
power. The Base Charge is calculated to
generate sufficient revenue to cover all
annual costs and to repay investment
obligations within allowable time
periods. The Base Charge is allocated to
each BCP Contractor in proportion to its
allocation of Hoover power. A BCP
composite power rate, expressed in
mills per kilowatt-hour (mills/kWh), can
be inferred by dividing the Base Charge
by energy sales in the year; however, the
rate is not used to determine customers’
bills.
Rate Schedule BCP–F8, Rate Order
No. WAPA–150, effective October 1,
2010, through September 30, 2015,
allows for an annual recalculation of the
Base Charge and Rates.1 This notice sets
SUPPLEMENTARY INFORMATION:
1 FERC confirmed and approved Rate Schedule
BCP–F8 on a final basis on December 9, 2010, in
Docket No. EF10–7–000, See United States
Department of Energy, Western Area Power
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
forth the recalculation for FY 2014.
Under Rate Schedule BCP–F8, the
existing composite rate, effective on
October 1, 2012, is 21.28 mills/kWh.
The current Base Charge is $82,379,637,
the energy rate is 10.64 mills/kWh, and
the capacity rate is $1.96 per kilowattmonth (kW-month).
The recalculated Base Charge for BCP
electric service, effective October 1,
2013, is $76,108,019, a 7.61-percent
decrease from the FY 2013 Base Charge.
The major contributing factor to the
decrease is the lower than expected
costs in several categories. Expenses for
operation and maintenance expenses,
the uprating program, the visitor center,
and replacement costs were less than
projected. Other factors for the decrease
are additional carryover from FY 2011
into FY 2012 and higher than projected
FY 2012 Other Revenues from the
Hoover Dam Visitor Center and
Ancillary Services, which are used to
offset costs to be recovered from power
customers. The FY 2012 results allowed
additional funds to be carried into FY
2013 and FY 2014, which enables the
FY 2014 Base Charge to be reduced from
the current level. The FY 2014
composite rate of 20.18 mills/kWh is a
decrease of approximately 5 percent
compared to the FY 2013 BCP
composite rate of 21.28 mills/kWh. The
FY 2014 energy rate of 10.09 mills/kWh
is a decrease of approximately 5 percent
compared to the existing energy rate of
10.64 mills/kWh. The FY 2014 capacity
rate of $1.87/kW-month is a decrease of
approximately 4.5 percent compared to
the existing capacity rate of $1.96/kWmonth. FY 2014 Energy and Capacity
sales have decreased compared with FY
2013, due to a forecast of continued
reduction in hydrological conditions
resulting in lower lake elevation.
Although the energy and capacity sales
for FY 2014 are decreasing, the
significant decrease in the revenue
requirement for FY 2014 results in a
decrease to the composite and energy
and capacity rates. The proposed rates
were calculated using Western’s FY
2013 Final Master Schedule, which
provides the FY 2014 projections for
energy and capacity sales.
The following summarizes the steps
taken by Western to ensure involvement
of all interested parties in determining
the Base Charge and Rates:
1. A Federal Register notice was
published on February 4, 2013 (78 FR
7775), announcing the proposed rate
adjustment process, initiating a public
consultation and comment period,
announcing public information and
Administration, Boulder Canyon Project, 133 FERC
¶ 62,229 (December 9, 2010).
E:\FR\FM\09AUN1.SGM
09AUN1
Agencies
[Federal Register Volume 78, Number 154 (Friday, August 9, 2013)]
[Notices]
[Page 48670]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-19290]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ Project No. 9403-007]
Rivermill Hydroelectric, Inc., New Hampshire Hydro Associates;
Notice of Transfer of Exemption
August 5, 2013.
1. By letter filed July 19, 2013, Rivermill Hydroelectric, Inc. and
New Hampshire Hydro Associates informed the Commission that the
exemption from licensing for the HDI Mascoma Dam Project,\1\ FERC No.
9403, originally issued September 21, 1988,\2\ has been transferred to
New Hampshire Hydro Associates. The project is located on the Mascoma
River in Grafton County, New Hampshire. The transfer of an exemption
does not require Commission approval.
---------------------------------------------------------------------------
\1\ On July 29, 2013, Commission staff spoke with the exemptee
and confirmed correct project name is HDI Mascoma Dam Project.
\2\ 44 FERC ] 62,273, Order Granting Exemption from Licensing (5
MW or Less).
---------------------------------------------------------------------------
2. New Hampshire Hydro Associates is now the exemptee of the HDI
Mascoma Dam Project, FERC No. 9403. All correspondence should be
forwarded to Rivermill Hydroelectric, Inc., c/o Essex Hydro Associates,
L.L.C., located at 55 Main Street, 4th Floor, Boston, MA 02108.
Dated: August 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-19290 Filed 8-8-13; 8:45 am]
BILLING CODE 6717-01-P