AUC, LLC Reno Creek, In Situ, 47427-47431 [2013-18811]
Download as PDF
Federal Register / Vol. 78, No. 150 / Monday, August 5, 2013 / Notices
exemption is necessary in order to issue
the requested license amendment, the
NRC granted the exemption and issued
the amendment concurrently, rather
than in sequence. This included issuing
a combined safety evaluation containing
the NRC staff’s review of both the
exemption request and the license
amendment. The exemption met all
applicable regulatory criteria set forth in
10 CFR 50.12, 10 CFR 52.7, and Section
VIII.A.4 of Appendix D to 10 CFR Part
52. The license amendment was found
to be acceptable as well. The combined
safety evaluation is available in ADAMS
under Accession No. ML13135A594.
Identical exemption documents
(except for referenced unit numbers and
license numbers) were issued to the
licensee for VCSNS Units 2 and 3 (COLs
NPF–93 and NPF–94). These documents
can be found in ADAMS under
Accession Nos. ML13135A579 and
ML13135A586. The exemption is
reproduced (with the exception of
abbreviated titles and additional
citations) in Section II of this document.
The amendment documents for COLs
NPF–93 and NPF–94 are available in
ADAMS under Accession Nos.
ML13135A574 and ML13135A577. A
summary of the amendment documents
is provided in Section III of this
document.
mstockstill on DSK4VPTVN1PROD with NOTICES
II. Exemption
Reproduced below is the exemption
document issued to VCSNS Units 2 and
3. It makes reference to the combined
safety evaluation that provides the
reasoning for the findings made by the
NRC (and listed under Item 1) in order
to grant the exemption:
1. In a letter dated August 29, 2012,
and supplemented by a letter dated
February 11, 2013, the licensee
requested from the Commission an
exemption from the provisions of 10
CFR Part 52, Appendix D, Section III.B,
‘‘Design Certification Rule for the
AP1000 Design, Scope, and Contents,’’
as part of license amendment request
12–01, ‘‘Additional Electrical
Penetration Assemblies.’’
For the reasons set forth in Section
3.1, ‘‘Evaluation of Exemption,’’ of the
NRC staff’s Safety Evaluation, which
can be found in ADAMS under
Accession No. ML13135A316, the
Commission finds that:
A. The exemption is authorized by
law;
B. the exemption presents no undue
risk to public health and safety;
C. the exemption is consistent with
the common defense and security;
D. special circumstances are present
in that the application of the rule in this
VerDate Mar<15>2010
19:07 Aug 02, 2013
Jkt 229001
circumstance is not necessary to serve
the underlying purpose of the rule;
E. the special circumstances outweigh
any decrease in safety that may result
from the reduction in standardization
caused by the exemption; and
F. the exemption will not result in a
significant decrease in the level of safety
otherwise provided by the design.
2. Accordingly, the licensee is granted
an exemption to the provisions of 10
CFR Part 52, Appendix D, Section III.B,
to allow deviations from the certified
Design Control Document (DCD) Tier 1
Table 2.2.1–1, Figure 2.2.1–1, and Table
2.2.3–6 as described in the licensee’s
request dated August 29, 2012 and
supplemented on February 11, 2013.
This exemption is related to, and
necessary for the granting of License
Amendment No. 6, which is being
issued concurrently with this
exemption.
3. As explained in Section 5.0,
‘‘Environmental Consideration,’’ of the
NRC staff Safety Evaluation (ADAMS
Accession No. ML13135A594), this
exemption meets the eligibility criteria
for categorical exclusion set forth in 10
CFR 51.22(c)(9). Therefore, pursuant to
10 CFR 51.22(b), no environmental
impact statement or environmental
assessment needs to be prepared in
connection with the issuance of the
exemption.
4. This exemption is effective as of
July 1, 2013.
III. License Amendment Request
By letter dated August 29, 2012, the
licensee requested that the NRC amend
the COLs for VCSNS Units 2 and 3,
COLs NPF–93 and NPF–94. The
licensee supplemented this application
on February 11, 2013. The proposed
amendment would depart from Tier 2
Material previously incorporated into
the UFSAR. Additionally, these Tier 2
changes involve changes to Tier 1
Information in the UFSAR, and the
proposed amendment would also revise
the associated material that has been
included in Appendix C of each of the
VEGP, Units 3 and 4 COLs. The
requested amendment will revise the
Tier 2 information pertaining to the
affected structures and tables related to
electrical penetration assemblies. These
changes require modifications to
particular Tier 1 information located in
Tables 2.2.1–1 and 2.2.3–6, and Figure
2.2.1–1 of the UFSAR, as well as the
corresponding information in Appendix
C. The Commission has determined for
these amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
PO 00000
Frm 00157
Fmt 4703
Sfmt 4703
47427
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
10 CFR Chapter I, which are set forth in
the license amendment. These changes
were necessary in order to support the
electrical loads within containment. No
additional loads or modifications to
existing loads are required as part of this
request.
A notice of consideration of issuance
of amendment to facility operating
license or combined license, as
applicable, proposed no significant
hazards consideration determination,
and opportunity for a hearing in
connection with these actions, was
published in the Federal Register on
October 16, 2012 (77 FR 63343). The
supplement had no effect on the no
significant hazards consideration
determination and no comments were
received during the 60-day comment
period.
The Commission has determined that
these amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments.
IV. Conclusion
Using the reasons set forth in the
combined safety evaluation, the staff
granted the exemption and issued the
amendment that the licensee requested
on August 29, 2012, and supplemented
by letter dated February 11, 2013. The
exemption and amendment were issued
on July 1, 2013 as part of a combined
package to the licensee. (ADAMS
Accession No. ML13135A322).
Dated at Rockville, Maryland, this 26th day
of July 2013.
For the Nuclear Regulatory Commission.
Lawrence Burkhart,
Chief, Licensing Branch 4, Division of New
Reactor Licensing, Office of New Reactors.
[FR Doc. 2013–18849 Filed 8–2–13; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 040–09092; NRC–2013–0164]
AUC, LLC Reno Creek, In Situ Leach
Uranium Recovery Project, License
Application Request To Construct and
Operate the Reno Creek ISR Project
Nuclear Regulatory
Commission.
ACTION: License application request;
opportunity to request a hearing and to
petition for leave to intervene; order.
AGENCY:
E:\FR\FM\05AUN1.SGM
05AUN1
47428
Federal Register / Vol. 78, No. 150 / Monday, August 5, 2013 / Notices
By letter dated October 3,
2012, AUC submitted a license
application to the U.S. Nuclear
Regulatory Commission (NRC)
requesting authorization to construct
and operate its proposed Reno Creek, In
Situ Leach Uranium Recovery (ISR)
project to be located in the Powder
River Basin near Wright, Wyoming.
SUMMARY:
Requests for a hearing or petition
for leave to intervene must be filed by
October 4, 2013. Any potential party as
defined in Section 2.4 of Title 10 of the
Code of Federal Regulations (10 CFR),
who believes access to Sensitive
Unclassified Non-Safeguards
Information (SUNSI) is necessary to
respond to this notice must request
document access by August 15, 2013.
DATES:
Please refer to Docket ID
NRC–2013–0164 when contacting the
NRC about the availability of
information regarding this document.
You may access information related to
this document, which the NRC
possesses and is publicly available,
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for documents filed under Docket ID
NRC–2013–0164. Address questions
about NRC dockets to Carol Gallagher
301–287–3422; email
Carol.Gallagher@nrc.gov. For technical
questions, contact the individual(s)
listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publicly
available documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this notice (if
that document is available in ADAMS)
is provided the first time that a
document is referenced. The AUC
License Application request and
additional supporting documents
(Technical Report and Environmental
Report) are available electronically in
ADAMS under Accession Nos.:
ML122890785 and ML131680092.
Documents related to the application
can be found in ADAMS under Docket
No. 04009092.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
mstockstill on DSK4VPTVN1PROD with NOTICES
ADDRESSES:
VerDate Mar<15>2010
19:07 Aug 02, 2013
Jkt 229001
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Chad Glenn, Office of Federal and State
Materials and Environmental
Management Programs, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
6722, email: Chad.Glenn@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
An NRC administrative review,
documented in a letter to AUC dated
June 18, 2013, found the application
acceptable to begin a technical review
(ADAMS Accession No. ML13161A319).
Prior to approving the license
application request, the NRC will need
to make the findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and the NRC’s regulations.
The NRC’s findings will be documented
in a safety evaluation report and a
supplemental environmental impact
statement. The supplemental
environmental impact statement will be
the subject of a subsequent notice in the
Federal Register.
II. Opportunity to Request a Hearing
and Petitions for Leave to Intervene
The NRC hereby provides notice that
this is a proceeding on an application to
construct and operate an ISR facility at
AUC’s Reno Creek site near Wright,
Wyoming. Requirements for hearing
requests and petitions for leave to
intervene are found in 10 CFR 2.309,
‘‘Hearing requests, petitions to
intervene, requirements for standing,
and contentions.’’ Interested persons
should consult 10 CFR 2.309, which is
available at the NRC’s PDR, located at
O1–F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland
20852 (or call the PDR at 800–397–4209
or 301–415–4737). The NRC’s
regulations are also accessible
electronically from the NRC Library on
the NRC’s Web site at https://www.nrc.
gov/reading-rm/doc-collections/cfr/.
Any person whose interest may be
affected by this proceeding and who
wishes to participate as a party in the
proceeding must file a written petition
for leave to intervene. As required by 10
CFR 2.309, a petition for leave to
intervene shall set forth with
particularity the interest of the
petitioner in the proceeding and how
that interest may be affected by the
results of the proceeding. The petition
must provide the name, address, and
telephone number of the petitioner and
specifically explain the reasons why
intervention should be permitted with
particular reference to the following
PO 00000
Frm 00158
Fmt 4703
Sfmt 4703
factors: (1) The nature of the petitioner’s
right under the Act to be made a party
to the proceeding; (2) the nature and
extent of the petitioner’s property,
financial, or other interest in the
proceeding; and (3) the possible effect of
any order that may be entered in the
proceeding on the petitioner’s interest.
A petition for leave to intervene must
also include a specification of the
contentions that the petitioner seeks to
have litigated in the hearing. For each
contention, the petitioner must provide
a specific statement of the issue of law
or fact to be raised or controverted, as
well as a brief explanation of the basis
for the contention. Additionally, the
petitioner must demonstrate that the
issue raised by each contention is
within the scope of the proceeding and
is material to the findings the NRC must
make to support the granting of a license
in response to the application. The
petition must include a concise
statement of the alleged facts or expert
opinions which support the position of
the petitioner and on which the
petitioner intends to rely at hearing,
together with references to the specific
sources and documents on which the
petitioner intends to rely. Finally, the
petition must provide sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact, including
references to specific portions of the
license application that the petitioner
disputes and the supporting reasons for
each dispute, or, if the petitioner
believes that the license application
fails to contain information on a
relevant matter as required by law, the
identification of each failure and the
supporting reasons for the petitioner’s
belief. Each contention must be one
that, if proven, would entitle the
petitioner to relief.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing with respect to resolution of
that person’s admitted contentions,
including the opportunity to present
evidence and to submit a crossexamination plan for cross-examination
of witnesses, consistent with NRC
regulations, policies, and procedures.
The Atomic Safety and Licensing Board
will set the time and place for any
prehearing conferences and evidentiary
hearings, and the appropriate notices
will be provided.
Requests for hearing, petitions for
leave to intervene, and motions for leave
to file contentions that are filed after the
60-day deadline will not be entertained
absent a determination by the presiding
E:\FR\FM\05AUN1.SGM
05AUN1
Federal Register / Vol. 78, No. 150 / Monday, August 5, 2013 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
officer that the new or amended filing
demonstrates good cause by satisfying
the following three factors in 10 CFR
2.309(c)(1)(i)-(iii).
A State, local governmental body,
Federally-recognized Indian tribe, or
agency thereof may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1) and (2). The
petition should state the nature and
extent of the petitioner’s interest in the
proceeding. The petition should be
submitted to the Commission by
October 4, 2013. The petition must be
filed in accordance with the filing
instructions in section III of this
document, and should meet the
requirements for petitions for leave to
intervene set forth in this section,
except that under 10 CFR 2.309(h)(2) a
State, local governmental body, or
Federally-recognized Indian tribe does
not need to address the standing
requirements in 10 CFR 2.309(d) if the
facility is located within its boundaries.
A State, local governmental body,
Federally-recognized Indian tribe, or
agency thereof may also have the
opportunity to participate under 10 CFR
2.315(c).
If a hearing is granted, any person
who does not wish to become a party to
the proceeding may, in the discretion of
the presiding officer, be permitted to
make a limited appearance under 10
CFR 2.315(a), by making an oral or
written statement of his or her position
on the issues at any session of the
hearing or at any pre-hearing
conference, within the limits and
conditions fixed by the presiding
officer. However, that person may not
otherwise participate in the proceeding.
III. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC’s E-Filing rule
(72 FR 49139; August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
VerDate Mar<15>2010
19:07 Aug 02, 2013
Jkt 229001
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to (1) request a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
apply-certificates.html. System
requirements for accessing the ESubmittal server are detailed in NRC’s
‘‘Guidance for Electronic Submission,’’
which is available on the agency’s
public Web site at https://www.nrc.gov/
site-help/e-submittals.html. Participants
may attempt to use other software not
listed on the Web site, but should note
that the NRC’s E-Filing system does not
support unlisted software, and the NRC
Meta System Help Desk will not be able
to offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through the Electronic
Information Exchange System, users
will be required to install a Web
browser plug-in from the NRC’s Web
site. Further information on the Webbased submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with the NRC’s
guidance available on the NRC’s public
Web site at https://www.nrc.gov/sitehelp/e-submittals.html. A filing is
considered complete at the time the
documents are submitted through the
NRC’s E-Filing system. To be timely, an
electronic filing must be submitted to
PO 00000
Frm 00159
Fmt 4703
Sfmt 4703
47429
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the EFiling system time-stamps the document
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the agency’s adjudicatory E-Filing
system may seek assistance by
contacting the NRC Meta System Help
Desk through the ‘‘Contact Us’’ link
located on the NRC’s public Web site at
https://www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852, Attention: Rulemaking
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
E:\FR\FM\05AUN1.SGM
05AUN1
47430
Federal Register / Vol. 78, No. 150 / Monday, August 5, 2013 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/ehd/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information for Contention
Preparation
A. This Order contains instructions
regarding how potential parties to this
proceeding may request access to
documents containing Sensitive
Unclassified Non-Safeguards
Information (SUNSI).
B. Within 10 days after publication of
this notice of hearing and opportunity to
petition for leave to intervene, any
potential party who believes access to
SUNSI is necessary to respond to this
notice may request such access. A
‘‘potential party’’ is any person who
intends to participate as a party by
demonstrating standing and filing an
admissible contention under 10 CFR
2.309. Requests for access to SUNSI
submitted later than 10 days after
publication of this notice will not be
considered absent a showing of good
cause for the late filing, addressing why
the request could not have been filed
earlier.
C. The requestor shall submit a letter
requesting permission to access SUNSI
to the Office of the Secretary, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and provide a copy to the Associate
General Counsel for Hearings,
Enforcement and Administration, Office
of the General Counsel, Washington, DC
20555–0001. The expedited delivery or
courier mail address for both offices is:
U.S. Nuclear Regulatory Commission,
11555 Rockville Pike, Rockville,
Maryland 20852. The email address for
the Office of the Secretary and the
Office of the General Counsel are
Hearing.Docket@nrc.gov and
VerDate Mar<15>2010
19:07 Aug 02, 2013
Jkt 229001
OGCmailcenter@nrc.gov, respectively.1
The request must include the following
information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1); and
(3) The identity of the individual or
entity requesting access to SUNSI and
the requester’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly-available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention.
D. Based on an evaluation of the
information submitted under paragraph
C.(3) the NRC staff will determine
within 10 days of receipt of the request
whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI.
E. If the NRC staff determines that the
requestor satisfies both D.(1) and D.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure
Agreementor Affidavit, or Protective
Order 2 setting forth terms and
conditions to prevent the unauthorized
or inadvertent disclosure of SUNSI by
each individual who will be granted
access to SUNSI.
F. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI must be filed by the requestor no
later than 25 days after the requestor is
granted access to that information.
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E-Filing Rule,’’
the initial request to access SUNSI under these
procedures should be submitted as described in this
paragraph.
2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
PO 00000
Frm 00160
Fmt 4703
Sfmt 4703
However, if more than 25 days remain
between the date the petitioner is
granted access to the information and
the deadline for filing all other
contentions (as established in the notice
of hearing or opportunity for hearing),
the petitioner may file its SUNSI
contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI
is denied by the NRC staff after a
determination on standing and need for
access, the NRC staff shall immediately
notify the requestor in writing, briefly
stating the reason or reasons for the
denial.
(2) The requestor may challenge the
NRC staff’s adverse determination by
filing a challenge within 5 days of
receipt of that determination with: (a)
The presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an administrative law judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
H. Review of Grants of Access. A
party other than the requestor may
challenge an NRC staff determination
granting access to SUNSI whose release
would harm that party’s interest
independent of the proceeding. Such a
challenge must be filed with the Chief
Administrative Judge within 5 days of
the notification by the NRC staff of its
grant of access.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.3
I. The Commission expects that the
NRC staff and presiding officers (and
any other reviewing officers) will
consider and resolve requests for access
to SUNSI, and motions for protective
orders, in a timely fashion in order to
minimize any unnecessary delays in
identifying those petitioners who have
standing and who have propounded
contentions meeting the specificity and
basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes
3 Requesters should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
49139; August 28, 2007) apply to appeals of NRC
staff determinations (because they must be served
on a presiding officer or the Commission, as
applicable), but not to the initial SUNSI request
submitted to the NRC staff under these procedures.
E:\FR\FM\05AUN1.SGM
05AUN1
Federal Register / Vol. 78, No. 150 / Monday, August 5, 2013 / Notices
the general target schedule for
processing and resolving requests under
these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 30th day
of July, 2013.
47431
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO
SENSITIVE UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING
Day
Event/Activity
0 ........................
Publication of FEDERAL REGISTER notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests.
Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information:
supporting the standing of a potential party identified by name and address; describing the need for the information in order
for the potential party to participate meaningfully in an adjudicatory proceeding.
Deadline for submitting petition for intervention containing: (i) Demonstration of standing; and (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 petitioner/requestor reply).
U.S. Nuclear Regulatory Commission (NRC) staff informs the requester of the staff’s determination whether the request for
access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents).
If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for petitioner/requestor to file a motion seeking a ruling
to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief
Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any
party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information to
file a motion seeking a ruling to reverse the NRC staff’s grant of access.
Deadline for NRC staff reply to motions to reverse NRC staff determination(s).
(Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and
file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure
Agreement for SUNSI.
If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access
to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a
final adverse determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order.
Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25 days
remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as
established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later
deadline.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
10 ......................
60 ......................
20 ......................
25 ......................
30 ......................
40 ......................
A .......................
A + 3 .................
A + 28 ...............
A + 53 ...............
A + 60 ...............
>A + 60 .............
[FR Doc. 2013–18811 Filed 8–2–13; 8:45 am]
BILLING CODE 7590–01–P
POSTAL REGULATORY COMMISSION
[Docket Nos. C2009–1R, MC2013–57 and
CP2013–75; Order No. 1794]
New Postal Product
Postal Regulatory Commission.
Notice.
AGENCY:
ACTION:
The Commission is noticing a
recent Postal Service filing concerning
the addition of Round-Trip Mailer to
replace the existing market dominant
mailer options for round-trip DVD mail.
This notice informs the public of the
filing, invites public comment, and
takes other administrative steps.
DATES: Comments are due: August 15,
2013. Reply Comments are due: August
22, 2013.
ADDRESSES: Submit comments
electronically via the Commission’s
Filing Online system at https://
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
19:07 Aug 02, 2013
Jkt 229001
www.prc.gov. Those who cannot submit
comments electronically should contact
the person identified in the FOR FURTHER
INFORMATION CONTACT section by
telephone for advice on filing
alternatives.
FOR FURTHER INFORMATION CONTACT:
Stephen L. Sharfman, General Counsel,
at 202–789–6820.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Introduction
II. Notice of Filings
III. Ordering Paragraphs
I. Introduction
On July 26, 2013, the Postal Service
filed a request to create a new
competitive product, tentatively called
‘‘Round-Trip Mailer,’’ to replace
existing market dominant mailer
options for round-trip DVD mail.1 The
1 Docket No. C2009–1R, Request of the United
States Postal Service Under Section 3642 to Create
Round-Trip Mailer Product, July 26, 2013, at 2
(Request). See Order No. 1763, Docket No. C2009–
PO 00000
Frm 00161
Fmt 4703
Sfmt 4703
Request, submitted in response to the
Commission’s order on remand in
Docket No. C2009–1R, equalizes the
rates for letter-shaped and flat-shaped
round-trip DVD mail.
The Request is made pursuant to 39
U.S.C. 3642 and 39 CFR 3020.30 et seq.
As proposed, the requested changes
would: (1) remove Letter Round-Trip
Mailer and Flat Round-Trip Mailer from
the market dominant product list; and
(2) add the new Round-Trip Mailer
product to the competitive product list.
Request, Attachment B. The Request has
been assigned Docket No. MC2013–57.
The Postal Service
contemporaneously filed proposed
changes to the Mail Classification
Schedule (MCS) that contain outbound
and return prices for the proposed
Round-Trip Mailer product. Those
changes have been assigned Docket No.
CP2013–75.
Request. The Request includes the
following supporting material:
1R, Order on Remand, June 26, 2013 (Order No.
1763).
E:\FR\FM\05AUN1.SGM
05AUN1
Agencies
[Federal Register Volume 78, Number 150 (Monday, August 5, 2013)]
[Notices]
[Pages 47427-47431]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-18811]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 040-09092; NRC-2013-0164]
AUC, LLC Reno Creek, In Situ Leach Uranium Recovery Project,
License Application Request To Construct and Operate the Reno Creek ISR
Project
AGENCY: Nuclear Regulatory Commission.
ACTION: License application request; opportunity to request a hearing
and to petition for leave to intervene; order.
-----------------------------------------------------------------------
[[Page 47428]]
SUMMARY: By letter dated October 3, 2012, AUC submitted a license
application to the U.S. Nuclear Regulatory Commission (NRC) requesting
authorization to construct and operate its proposed Reno Creek, In Situ
Leach Uranium Recovery (ISR) project to be located in the Powder River
Basin near Wright, Wyoming.
DATES: Requests for a hearing or petition for leave to intervene must
be filed by October 4, 2013. Any potential party as defined in Section
2.4 of Title 10 of the Code of Federal Regulations (10 CFR), who
believes access to Sensitive Unclassified Non-Safeguards Information
(SUNSI) is necessary to respond to this notice must request document
access by August 15, 2013.
ADDRESSES: Please refer to Docket ID NRC-2013-0164 when contacting the
NRC about the availability of information regarding this document. You
may access information related to this document, which the NRC
possesses and is publicly available, using any of the following
methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for documents filed under Docket ID NRC-
2013-0164. Address questions about NRC dockets to Carol Gallagher 301-
287-3422; email Carol.Gallagher@nrc.gov. For technical questions,
contact the individual(s) listed in the FOR FURTHER INFORMATION CONTACT
section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly available documents online in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number
for each document referenced in this notice (if that document is
available in ADAMS) is provided the first time that a document is
referenced. The AUC License Application request and additional
supporting documents (Technical Report and Environmental Report) are
available electronically in ADAMS under Accession Nos.: ML122890785 and
ML131680092. Documents related to the application can be found in ADAMS
under Docket No. 04009092.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Chad Glenn, Office of Federal and
State Materials and Environmental Management Programs, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-
6722, email: Chad.Glenn@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
An NRC administrative review, documented in a letter to AUC dated
June 18, 2013, found the application acceptable to begin a technical
review (ADAMS Accession No. ML13161A319). Prior to approving the
license application request, the NRC will need to make the findings
required by the Atomic Energy Act of 1954, as amended (the Act), and
the NRC's regulations. The NRC's findings will be documented in a
safety evaluation report and a supplemental environmental impact
statement. The supplemental environmental impact statement will be the
subject of a subsequent notice in the Federal Register.
II. Opportunity to Request a Hearing and Petitions for Leave to
Intervene
The NRC hereby provides notice that this is a proceeding on an
application to construct and operate an ISR facility at AUC's Reno
Creek site near Wright, Wyoming. Requirements for hearing requests and
petitions for leave to intervene are found in 10 CFR 2.309, ``Hearing
requests, petitions to intervene, requirements for standing, and
contentions.'' Interested persons should consult 10 CFR 2.309, which is
available at the NRC's PDR, located at O1-F21, One White Flint North,
11555 Rockville Pike, Rockville, Maryland 20852 (or call the PDR at
800-397-4209 or 301-415-4737). The NRC's regulations are also
accessible electronically from the NRC Library on the NRC's Web site at
https://www.nrc.gov/reading-rm/doc-collections/cfr/.
Any person whose interest may be affected by this proceeding and
who wishes to participate as a party in the proceeding must file a
written petition for leave to intervene. As required by 10 CFR 2.309, a
petition for leave to intervene shall set forth with particularity the
interest of the petitioner in the proceeding and how that interest may
be affected by the results of the proceeding. The petition must provide
the name, address, and telephone number of the petitioner and
specifically explain the reasons why intervention should be permitted
with particular reference to the following factors: (1) The nature of
the petitioner's right under the Act to be made a party to the
proceeding; (2) the nature and extent of the petitioner's property,
financial, or other interest in the proceeding; and (3) the possible
effect of any order that may be entered in the proceeding on the
petitioner's interest.
A petition for leave to intervene must also include a specification
of the contentions that the petitioner seeks to have litigated in the
hearing. For each contention, the petitioner must provide a specific
statement of the issue of law or fact to be raised or controverted, as
well as a brief explanation of the basis for the contention.
Additionally, the petitioner must demonstrate that the issue raised by
each contention is within the scope of the proceeding and is material
to the findings the NRC must make to support the granting of a license
in response to the application. The petition must include a concise
statement of the alleged facts or expert opinions which support the
position of the petitioner and on which the petitioner intends to rely
at hearing, together with references to the specific sources and
documents on which the petitioner intends to rely. Finally, the
petition must provide sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact,
including references to specific portions of the license application
that the petitioner disputes and the supporting reasons for each
dispute, or, if the petitioner believes that the license application
fails to contain information on a relevant matter as required by law,
the identification of each failure and the supporting reasons for the
petitioner's belief. Each contention must be one that, if proven, would
entitle the petitioner to relief.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that person's admitted
contentions, including the opportunity to present evidence and to
submit a cross-examination plan for cross-examination of witnesses,
consistent with NRC regulations, policies, and procedures. The Atomic
Safety and Licensing Board will set the time and place for any
prehearing conferences and evidentiary hearings, and the appropriate
notices will be provided.
Requests for hearing, petitions for leave to intervene, and motions
for leave to file contentions that are filed after the 60-day deadline
will not be entertained absent a determination by the presiding
[[Page 47429]]
officer that the new or amended filing demonstrates good cause by
satisfying the following three factors in 10 CFR 2.309(c)(1)(i)-(iii).
A State, local governmental body, Federally-recognized Indian
tribe, or agency thereof may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1) and (2). The petition
should state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission by
October 4, 2013. The petition must be filed in accordance with the
filing instructions in section III of this document, and should meet
the requirements for petitions for leave to intervene set forth in this
section, except that under 10 CFR 2.309(h)(2) a State, local
governmental body, or Federally-recognized Indian tribe does not need
to address the standing requirements in 10 CFR 2.309(d) if the facility
is located within its boundaries. A State, local governmental body,
Federally-recognized Indian tribe, or agency thereof may also have the
opportunity to participate under 10 CFR 2.315(c).
If a hearing is granted, any person who does not wish to become a
party to the proceeding may, in the discretion of the presiding
officer, be permitted to make a limited appearance under 10 CFR
2.315(a), by making an oral or written statement of his or her position
on the issues at any session of the hearing or at any pre-hearing
conference, within the limits and conditions fixed by the presiding
officer. However, that person may not otherwise participate in the
proceeding.
III. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC's E-Filing rule (72 FR 49139;
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a request or
petition for hearing (even in instances in which the participant, or
its counsel or representative, already holds an NRC-issued digital ID
certificate). Based upon this information, the Secretary will establish
an electronic docket for the hearing in this proceeding if the
Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is
available on NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in NRC's ``Guidance for Electronic
Submission,'' which is available on the agency's public Web site at
https://www.nrc.gov/site-help/e-submittals.html. Participants may
attempt to use other software not listed on the Web site, but should
note that the NRC's E-Filing system does not support unlisted software,
and the NRC Meta System Help Desk will not be able to offer assistance
in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through the Electronic Information Exchange System,
users will be required to install a Web browser plug-in from the NRC's
Web site. Further information on the Web-based submission form,
including the installation of the Web browser plug-in, is available on
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with the NRC's guidance
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC's public
Web site at https://www.nrc.gov/site-help/e-submittals.html, by email to
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the
[[Page 47430]]
reason for granting the exemption from use of E-Filing no longer
exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information. With
respect to copyrighted works, except for limited excerpts that serve
the purpose of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing Sensitive
Unclassified Non-Safeguards Information (SUNSI).
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request such access. A ``potential party'' is any person who intends to
participate as a party by demonstrating standing and filing an
admissible contention under 10 CFR 2.309. Requests for access to SUNSI
submitted later than 10 days after publication of this notice will not
be considered absent a showing of good cause for the late filing,
addressing why the request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Associate General
Counsel for Hearings, Enforcement and Administration, Office of the
General Counsel, Washington, DC 20555-0001. The expedited delivery or
courier mail address for both offices is: U.S. Nuclear Regulatory
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The email
address for the Office of the Secretary and the Office of the General
Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov,
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1); and
(3) The identity of the individual or entity requesting access to
SUNSI and the requester's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly-available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention.
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreementor Affidavit, or
Protective Order \2\ setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI by each individual who
will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no later than 25 days after
the requestor is granted access to that information. However, if more
than 25 days remain between the date the petitioner is granted access
to the information and the deadline for filing all other contentions
(as established in the notice of hearing or opportunity for hearing),
the petitioner may file its SUNSI contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
after a determination on standing and need for access, the NRC staff
shall immediately notify the requestor in writing, briefly stating the
reason or reasons for the denial.
(2) The requestor may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an administrative law judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) if another officer has been
designated to rule on information access issues, with that officer.
H. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed with the Chief Administrative Judge
within 5 days of the notification by the NRC staff of its grant of
access.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requesters should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals
of NRC staff determinations (because they must be served on a
presiding officer or the Commission, as applicable), but not to the
initial SUNSI request submitted to the NRC staff under these
procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes
[[Page 47431]]
the general target schedule for processing and resolving requests under
these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 30th day of July, 2013.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
in this Proceeding
------------------------------------------------------------------------
Day Event/Activity
------------------------------------------------------------------------
0........................ Publication of Federal Register notice of
hearing and opportunity to petition for
leave to intervene, including order with
instructions for access requests.
10....................... Deadline for submitting requests for access
to Sensitive Unclassified Non-Safeguards
Information (SUNSI) with information:
supporting the standing of a potential party
identified by name and address; describing
the need for the information in order for
the potential party to participate
meaningfully in an adjudicatory proceeding.
60....................... Deadline for submitting petition for
intervention containing: (i) Demonstration
of standing; and (ii) all contentions whose
formulation does not require access to SUNSI
(+25 Answers to petition for intervention;
+7 petitioner/requestor reply).
20....................... U.S. Nuclear Regulatory Commission (NRC)
staff informs the requester of the staff's
determination whether the request for access
provides a reasonable basis to believe
standing can be established and shows need
for SUNSI. (NRC staff also informs any party
to the proceeding whose interest independent
of the proceeding would be harmed by the
release of the information.) If NRC staff
makes the finding of need for SUNSI and
likelihood of standing, NRC staff begins
document processing (preparation of
redactions or review of redacted documents).
25....................... If NRC staff finds no ``need'' or no
likelihood of standing, the deadline for
petitioner/requestor to file a motion
seeking a ruling to reverse the NRC staff's
denial of access; NRC staff files copy of
access determination with the presiding
officer (or Chief Administrative Judge or
other designated officer, as appropriate).
If NRC staff finds ``need'' for SUNSI, the
deadline for any party to the proceeding
whose interest independent of the proceeding
would be harmed by the release of the
information to file a motion seeking a
ruling to reverse the NRC staff's grant of
access.
30....................... Deadline for NRC staff reply to motions to
reverse NRC staff determination(s).
40....................... (Receipt +30) If NRC staff finds standing and
need for SUNSI, deadline for NRC staff to
complete information processing and file
motion for Protective Order and draft Non-
Disclosure Affidavit. Deadline for applicant/
licensee to file Non-Disclosure Agreement
for SUNSI.
A........................ If access granted: Issuance of presiding
officer or other designated officer decision
on motion for protective order for access to
sensitive information (including schedule
for providing access and submission of
contentions) or decision reversing a final
adverse determination by the NRC staff.
A + 3.................... Deadline for filing executed Non-Disclosure
Affidavits. Access provided to SUNSI
consistent with decision issuing the
protective order.
A + 28................... Deadline for submission of contentions whose
development depends upon access to SUNSI.
However, if more than 25 days remain between
the petitioner's receipt of (or access to)
the information and the deadline for filing
all other contentions (as established in the
notice of hearing or opportunity for
hearing), the petitioner may file its SUNSI
contentions by that later deadline.
A + 53................... (Contention receipt +25) Answers to
contentions whose development depends upon
access to SUNSI.
A + 60................... (Answer receipt +7) Petitioner/Intervenor
reply to answers.
>A + 60.................. Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. 2013-18811 Filed 8-2-13; 8:45 am]