Joint Failure on Continuous Welded Rail Track, 47486-47487 [2013-18787]
Download as PDF
47486
Federal Register / Vol. 78, No. 150 / Monday, August 5, 2013 / Notices
Indians, Alaska Natives, and tribes. The
Department affirms its commitment to
these principles, and those set forth in
Executive Order 13175 and the
President’s November 5, 2009,
memorandum in establishing the DOT
Consultation Plan dated March 4, 2010,
and found at: https://www.dot.gov/sites/
dot.dev/files/docs/
Tribal%20Consultation%20Plan.pdf
In furtherance of these documents
pertaining to consultation, FHWA
informally consulted with the TPPCC in
categorizing the eligible activities and
determining funding priorities as
described herein. In addition to
soliciting comments on this notice,
FHWA expects to provide other
outreach opportunities with tribes
through webinars in advance of
publication of a final notice of funding
availability.
Authority: Section 1119 of Pub. L. 112–
141; 23 U.S.C. 202(e).
Issued on: July 29, 2013.
Victor M. Mendez,
FHWA Administrator.
[FR Doc. 2013–18769 Filed 8–2–13; 8:45 am]
BILLING CODE 4910–22–P
DEPARTMENT OF TRANSPORTATION
Federal Motor Carrier Safety
Administration
Sunshine Act Meetings; Unified Carrier
Registration Plan Board of Directors
Federal Motor Carrier Safety
Administration (FMCSA), DOT.
ACTION: Notice of Unified Carrier
Registration Plan Board of Directors
Meeting.
AGENCY:
The meeting will be held
on August 29, 2013, from 12:00 Noon to
3:00 p.m., Eastern Daylight Time.
PLACE: This meeting will be open to the
public via conference call. Any
interested person may call 1–877–820–
7831, passcode, 908048 to listen and
participate in this meeting.
STATUS: Open to the public.
MATTERS TO BE CONSIDERED: The Unified
Carrier Registration Plan Board of
Directors (the Board) will continue its
work in developing and implementing
the Unified Carrier Registration Plan
and Agreement and to that end, may
consider matters properly before the
Board.
mstockstill on DSK4VPTVN1PROD with NOTICES
TIME AND DATE:
Mr.
Avelino Gutierrez, Chair, Unified
Carrier Registration Board of Directors at
(505) 827–4565.
FOR FURTHER INFORMATION CONTACT:
VerDate Mar<15>2010
19:07 Aug 02, 2013
Jkt 229001
Issued on: July 25, 2013.
Larry W. Minor,
Associate Administrator, Office of Policy,
Federal Motor Carrier Safety Administration.
[FR Doc. 2013–18916 Filed 8–1–13; 11:15 am]
BILLING CODE 4910–EX–P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Safety Advisory 2013–05]
Joint Failure on Continuous Welded
Rail Track
Federal Railroad
Administration (FRA), Department of
Transportation (DOT).
ACTION: Notice of safety advisory.
AGENCY:
FRA is issuing Safety
Advisory 2013–05 to remind railroad
track owners about the importance of
reviewing current, internal continuous
welded rail (CWR) plans and properly
inspecting CWR joints to identify and
correct locations that indicate potential
joint failure that may cause a
derailment. FRA is issuing this notice in
response to two recent train
derailments. Although the causes of
these derailments are still under
investigation, preliminary evidence
suggests that failed joint bars played a
significant role in both derailments.
This notice reminds railroad track
owners that they must comply with the
requirements of their CWR plan
procedures regarding inspecting track to
identify indications of potential joint
failure in CWR track, especially that of
compromise joints. This notice also
recommends that railroad track owners
review their CWR plans to ensure that
the instructions properly identify the
necessary track maintenance procedures
to remedy indications of potential joint
failure that lead to rapid failure of joint
bars. Finally, the notice recommends
that railroad track owners follow good
maintenance practices to ensure the
joints are adequately supported and,
wherever possible, eliminate joints in
CWR, especially compromise joints in
passenger and hazardous material
routes.
FOR FURTHER INFORMATION CONTACT: Mr.
Kenneth Rusk, Staff Director, Track
Division, Office of Railroad Safety, FRA,
1200 New Jersey Avenue SE.,
Washington, DC 20590, telephone (202)
493–6236; Mr. Carlo M. Patrick, Staff
Director, Rail and Infrastructure
Integrity Division, Office of Railroad
Safety, FRA, 1200 New Jersey Avenue
SE., Washington, DC 20590, telephone
(202) 493–6399; or Ms. Elisabeth
Galotto, Trial Attorney, Office of Chief
SUMMARY:
PO 00000
Frm 00216
Fmt 4703
Sfmt 4703
Counsel, FRA, 1200 New Jersey Avenue
SE., Washington, DC 20590, telephone
(202) 493–0270.
SUPPLEMENTARY INFORMATION: Joints in
CWR are considered one of the weakest
elements of track structure. The track
components at a joint are subject to
stresses in vertical, lateral, and
longitudinal planes. Although the
number of CWR joint-caused
derailments on a main line has been
relatively small, these derailments can
be catastrophic, especially if passenger
trains or hazardous materials are
involved. Recent accidents highlight the
need for track owners, railroads, and
their respective employees to review,
reemphasize, and adhere to the
requirements of a track owner’s CWR
plan procedures and current internal
engineering instructions that address
inspecting track to identify stress
conditions in CWR joints.
FRA requires that a track owner
comply with the contents of an
approved or conditionally approved
CWR plan under Title 49 Code of
Federal Regulations (CFR) Section
213.118, Continuous welded rail (CWR),
plan review and approval.1 See
§ 213.119, Continuous welded rail
(CWR), plan contents. The plan must
include procedures that prescribe the
scheduling and conduct of inspections
to detect cracks and other indications of
potential failures in CWR joints. See
§ 213.119(h). These procedures are
required to specify the conditions of
actual or potential joint failure for
which railroad personnel must inspect,
including, at a minimum, (i) loose, bent,
or missing joint bolts; (ii) rail end batter
or mismatch that contributes to
instability of the joint; and (iii) evidence
of excessive longitudinal rail movement
in or near the joint, including, but not
limited to: wide rail gap, defective joint
bolts, disturbed ballast, surface
deviations, gap between tie plates and
rail, or displaced rail anchors. See
§ 213.119(h)(3).
Recent Incidents
This section provides a brief summary
of the circumstances surrounding two
recent train derailments that appear to
be related to joint bar failure in CWR.
Information regarding these incidents is
based on FRA and the respective
railroad’s preliminary findings to date.
The probable causes and contributing
factors, if any, have not yet been
established. Therefore, nothing in this
safety advisory is intended to attribute
1 All references in this notice to a section or other
provision of a regulation are to a section, part, or
other provision in 49 CFR, unless otherwise
specified.
E:\FR\FM\05AUN1.SGM
05AUN1
Federal Register / Vol. 78, No. 150 / Monday, August 5, 2013 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
a cause to these incidents, or place
responsibility for these incidents on the
acts or omissions of any person or
entity.
On May 17, 2013, at approximately
6:08 p.m., an eastbound Metro-North
Commuter Railroad (Metro-North) train
derailed near Bridgeport, CT. A portion
of the derailed train fouled the adjacent
track and was struck by a westbound
Metro-North commuter train. Sixty-nine
people were reportedly injured and
damages to the equipment and track
amounted to several million dollars. At
the accident, a pair of broken
compromise joint bars was found. The
National Transportation Safety Board is
currently investigating the derailment
and will ultimately determine the cause
of the accident.
On March 18, 2013, an empty Long
Island Rail Road (LIRR) passenger train
derailed in Forest Hill, Queens, NY.
Four of the train’s eight cars derailed
while traveling 75 mph. The railroad’s
preliminary investigation determined
the cause to be a broken joint bar.
Recommended Action
Rail joints in CWR warrant special
attention and maintenance. Adequate
support (which includes good tie
condition, sufficient ballast, and good
drainage) is essential to preventing joint
bar failure. FRA recommends that track
owners and railroads:
1. Review the requirements of their
CWR plans and train employees
responsible for inspecting CWR, with a
focus on inspecting CWR track to
identify conditions of actual or potential
joint failure.
2. Review current internal engineering
instructions to ensure that the
instructions contain the appropriate
track maintenance instructions to
remedy joint conditions that cause joint
bars to fail and cause derailments.
3. Follow good maintenance practices
to ensure the joints are adequately
supported, in addition to all of the
requirements prescribed in § 213.119.
Ties under and adjacent to CWR joints
must be capable of supporting the traffic
loading. When spot tamping the joints
by hand, joints should be raised at least
1 inch to ensure the ballast particles are
properly tamped under the entire width
of ties. If the tamping is conducted in
hot weather without immediate
mechanical track stabilization, as is the
case with machine tamping, a speed
restriction is required to reduce the risk
of track buckling.
4. Perform appropriate ballast
maintenance to ensure proper track
drainage for adequate tie support.
5. Wherever possible, eliminate joints
in CWR, especially compromise joints
VerDate Mar<15>2010
19:07 Aug 02, 2013
Jkt 229001
in passenger and hazardous materials
routes.
6. Reinforce with employees
responsible for inspecting track the
importance of the proper installation
and maintenance of joints by ensuring
that sufficient anchoring, ballast, and
ties ensure the integrity of the joint.
This is especially important around
compromise joints, which by design
typically have a suspended joint
configuration.
7. If joint bars (and particularly
compromise joint bars) are found
cracked or broken between the middle
two bolt holes after a relatively short
time after installation, determine the
root cause that led to the premature
failure of the joint bars and correct the
deficiency.
FRA strongly encourages railroads
and track owners to take actions that are
consistent with the preceding
recommendations to help ensure the
safety of the Nation’s railroad
employees and the public. FRA may
modify Safety Advisory 2013–05, issue
additional safety advisories, or take
other appropriate actions it deems
necessary to ensure the highest level of
safety on the Nation’s railroads,
including pursuing other corrective
measures under its rail safety authority.
Robert C. Lauby,
Deputy Associate Administrator for
Regulatory and Legislative Operations.
[FR Doc. 2013–18787 Filed 8–2–13; 8:45 am]
BILLING CODE 4910–06–P
DEPARTMENT OF TRANSPORTATION
Federal Transit Administration
[Docket No. FTA–2012–0029]
Notice of Proposed Buy America
Waiver
AGENCY:
Federal Transit Administration,
DOT.
Notice of proposed Buy America
waiver and request for comment.
ACTION:
The Federal Transit
Administration (FTA) received a request
for a waiver to permit the purchase of
minivans that are non-compliant with
FTA Buy America requirements using
FTA funding. The request is from the
North Front Range Metropolitan
Planning Organization (NFRMPO).
NFRMPO is in the process of procuring
vehicles for its vanpool program,
‘‘VanGo.’’
In accordance with 49 U.S.C.
5323(j)(3)(A), FTA is providing notice of
the waiver request and seeks public
comment before deciding whether to
SUMMARY:
PO 00000
Frm 00217
Fmt 4703
Sfmt 4703
47487
grant the request. If granted, the waiver
would be for the Buy America final
assembly requirement only and would
apply only to the FTA-funded
procurement by NFRMPO.
DATES: Comments must be received by
September 4, 2013. Late-filed comments
will be considered to the extent
practicable.
Please submit your
comments by one of the following
means, identifying your submissions by
docket number FTA–2013–0027:
1. Web site: https://
www.regulations.gov. Follow the
instructions for submitting comments
on the U.S. Government electronic
docket site.
2. Fax: (202) 493–2251.
3. Mail: U.S. Department of
Transportation, 1200 New Jersey
Avenue SE., Docket Operations, M–30,
West Building, Ground Floor, Room
W12–140, Washington, DC 20590–0001.
4. Hand Delivery: U.S. Department of
Transportation, 1200 New Jersey
Avenue SE., Docket Operations, M–30,
West Building, Ground Floor, Room
W12–140, Washington, DC 20590–0001
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
Instructions: All submissions must
make reference to the ‘‘Federal Transit
Administration’’ and include docket
number FTA–2013–0027. Due to the
security procedures in effect since
October 2011, mail received through the
U.S. Postal Service may be subject to
delays. Parties making submissions
responsive to this notice should
consider using an express mail firm to
ensure the prompt filing of any
submissions not filed electronically or
by hand. Note that all submissions
received, including any personal
information therein, will be posted
without change or alteration to https://
www.regulations.gov. For more
information, you may review DOT’s
complete Privacy Act Statement in the
Federal Register published April 11,
2000 (65 FR 19477), or you may visit
https://www.regulations.gov.
FOR FURTHER INFORMATION CONTACT:
Mary J. Lee, FTA Attorney-Advisor, at
(202) 366–0985 or mary.j.lee@dot.gov.
SUPPLEMENTARY INFORMATION: The
purpose of this notice is to provide
notice and seek comment on whether
the Federal Transit Administration
(FTA) should a grant non-availability
waiver for NFRMPO’s procurement of
minivans or similar vehicles (minivans).
If granted, the waiver would be limited
to the Buy America final assembly
requirement under 49 U.S.C.
5323(j)(2)(C)(ii) and 49 CFR 661.11.
ADDRESSES:
E:\FR\FM\05AUN1.SGM
05AUN1
Agencies
[Federal Register Volume 78, Number 150 (Monday, August 5, 2013)]
[Notices]
[Pages 47486-47487]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-18787]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Safety Advisory 2013-05]
Joint Failure on Continuous Welded Rail Track
AGENCY: Federal Railroad Administration (FRA), Department of
Transportation (DOT).
ACTION: Notice of safety advisory.
-----------------------------------------------------------------------
SUMMARY: FRA is issuing Safety Advisory 2013-05 to remind railroad
track owners about the importance of reviewing current, internal
continuous welded rail (CWR) plans and properly inspecting CWR joints
to identify and correct locations that indicate potential joint failure
that may cause a derailment. FRA is issuing this notice in response to
two recent train derailments. Although the causes of these derailments
are still under investigation, preliminary evidence suggests that
failed joint bars played a significant role in both derailments. This
notice reminds railroad track owners that they must comply with the
requirements of their CWR plan procedures regarding inspecting track to
identify indications of potential joint failure in CWR track,
especially that of compromise joints. This notice also recommends that
railroad track owners review their CWR plans to ensure that the
instructions properly identify the necessary track maintenance
procedures to remedy indications of potential joint failure that lead
to rapid failure of joint bars. Finally, the notice recommends that
railroad track owners follow good maintenance practices to ensure the
joints are adequately supported and, wherever possible, eliminate
joints in CWR, especially compromise joints in passenger and hazardous
material routes.
FOR FURTHER INFORMATION CONTACT: Mr. Kenneth Rusk, Staff Director,
Track Division, Office of Railroad Safety, FRA, 1200 New Jersey Avenue
SE., Washington, DC 20590, telephone (202) 493-6236; Mr. Carlo M.
Patrick, Staff Director, Rail and Infrastructure Integrity Division,
Office of Railroad Safety, FRA, 1200 New Jersey Avenue SE., Washington,
DC 20590, telephone (202) 493-6399; or Ms. Elisabeth Galotto, Trial
Attorney, Office of Chief Counsel, FRA, 1200 New Jersey Avenue SE.,
Washington, DC 20590, telephone (202) 493-0270.
SUPPLEMENTARY INFORMATION: Joints in CWR are considered one of the
weakest elements of track structure. The track components at a joint
are subject to stresses in vertical, lateral, and longitudinal planes.
Although the number of CWR joint-caused derailments on a main line has
been relatively small, these derailments can be catastrophic,
especially if passenger trains or hazardous materials are involved.
Recent accidents highlight the need for track owners, railroads, and
their respective employees to review, reemphasize, and adhere to the
requirements of a track owner's CWR plan procedures and current
internal engineering instructions that address inspecting track to
identify stress conditions in CWR joints.
FRA requires that a track owner comply with the contents of an
approved or conditionally approved CWR plan under Title 49 Code of
Federal Regulations (CFR) Section 213.118, Continuous welded rail
(CWR), plan review and approval.\1\ See Sec. 213.119, Continuous
welded rail (CWR), plan contents. The plan must include procedures that
prescribe the scheduling and conduct of inspections to detect cracks
and other indications of potential failures in CWR joints. See Sec.
213.119(h). These procedures are required to specify the conditions of
actual or potential joint failure for which railroad personnel must
inspect, including, at a minimum, (i) loose, bent, or missing joint
bolts; (ii) rail end batter or mismatch that contributes to instability
of the joint; and (iii) evidence of excessive longitudinal rail
movement in or near the joint, including, but not limited to: wide rail
gap, defective joint bolts, disturbed ballast, surface deviations, gap
between tie plates and rail, or displaced rail anchors. See Sec.
213.119(h)(3).
---------------------------------------------------------------------------
\1\ All references in this notice to a section or other
provision of a regulation are to a section, part, or other provision
in 49 CFR, unless otherwise specified.
---------------------------------------------------------------------------
Recent Incidents
This section provides a brief summary of the circumstances
surrounding two recent train derailments that appear to be related to
joint bar failure in CWR. Information regarding these incidents is
based on FRA and the respective railroad's preliminary findings to
date. The probable causes and contributing factors, if any, have not
yet been established. Therefore, nothing in this safety advisory is
intended to attribute
[[Page 47487]]
a cause to these incidents, or place responsibility for these incidents
on the acts or omissions of any person or entity.
On May 17, 2013, at approximately 6:08 p.m., an eastbound Metro-
North Commuter Railroad (Metro-North) train derailed near Bridgeport,
CT. A portion of the derailed train fouled the adjacent track and was
struck by a westbound Metro-North commuter train. Sixty-nine people
were reportedly injured and damages to the equipment and track amounted
to several million dollars. At the accident, a pair of broken
compromise joint bars was found. The National Transportation Safety
Board is currently investigating the derailment and will ultimately
determine the cause of the accident.
On March 18, 2013, an empty Long Island Rail Road (LIRR) passenger
train derailed in Forest Hill, Queens, NY. Four of the train's eight
cars derailed while traveling 75 mph. The railroad's preliminary
investigation determined the cause to be a broken joint bar.
Recommended Action
Rail joints in CWR warrant special attention and maintenance.
Adequate support (which includes good tie condition, sufficient
ballast, and good drainage) is essential to preventing joint bar
failure. FRA recommends that track owners and railroads:
1. Review the requirements of their CWR plans and train employees
responsible for inspecting CWR, with a focus on inspecting CWR track to
identify conditions of actual or potential joint failure.
2. Review current internal engineering instructions to ensure that
the instructions contain the appropriate track maintenance instructions
to remedy joint conditions that cause joint bars to fail and cause
derailments.
3. Follow good maintenance practices to ensure the joints are
adequately supported, in addition to all of the requirements prescribed
in Sec. 213.119. Ties under and adjacent to CWR joints must be capable
of supporting the traffic loading. When spot tamping the joints by
hand, joints should be raised at least 1 inch to ensure the ballast
particles are properly tamped under the entire width of ties. If the
tamping is conducted in hot weather without immediate mechanical track
stabilization, as is the case with machine tamping, a speed restriction
is required to reduce the risk of track buckling.
4. Perform appropriate ballast maintenance to ensure proper track
drainage for adequate tie support.
5. Wherever possible, eliminate joints in CWR, especially
compromise joints in passenger and hazardous materials routes.
6. Reinforce with employees responsible for inspecting track the
importance of the proper installation and maintenance of joints by
ensuring that sufficient anchoring, ballast, and ties ensure the
integrity of the joint. This is especially important around compromise
joints, which by design typically have a suspended joint configuration.
7. If joint bars (and particularly compromise joint bars) are found
cracked or broken between the middle two bolt holes after a relatively
short time after installation, determine the root cause that led to the
premature failure of the joint bars and correct the deficiency.
FRA strongly encourages railroads and track owners to take actions
that are consistent with the preceding recommendations to help ensure
the safety of the Nation's railroad employees and the public. FRA may
modify Safety Advisory 2013-05, issue additional safety advisories, or
take other appropriate actions it deems necessary to ensure the highest
level of safety on the Nation's railroads, including pursuing other
corrective measures under its rail safety authority.
Robert C. Lauby,
Deputy Associate Administrator for Regulatory and Legislative
Operations.
[FR Doc. 2013-18787 Filed 8-2-13; 8:45 am]