Joint Failure on Continuous Welded Rail Track, 47486-47487 [2013-18787]

Download as PDF 47486 Federal Register / Vol. 78, No. 150 / Monday, August 5, 2013 / Notices Indians, Alaska Natives, and tribes. The Department affirms its commitment to these principles, and those set forth in Executive Order 13175 and the President’s November 5, 2009, memorandum in establishing the DOT Consultation Plan dated March 4, 2010, and found at: https://www.dot.gov/sites/ dot.dev/files/docs/ Tribal%20Consultation%20Plan.pdf In furtherance of these documents pertaining to consultation, FHWA informally consulted with the TPPCC in categorizing the eligible activities and determining funding priorities as described herein. In addition to soliciting comments on this notice, FHWA expects to provide other outreach opportunities with tribes through webinars in advance of publication of a final notice of funding availability. Authority: Section 1119 of Pub. L. 112– 141; 23 U.S.C. 202(e). Issued on: July 29, 2013. Victor M. Mendez, FHWA Administrator. [FR Doc. 2013–18769 Filed 8–2–13; 8:45 am] BILLING CODE 4910–22–P DEPARTMENT OF TRANSPORTATION Federal Motor Carrier Safety Administration Sunshine Act Meetings; Unified Carrier Registration Plan Board of Directors Federal Motor Carrier Safety Administration (FMCSA), DOT. ACTION: Notice of Unified Carrier Registration Plan Board of Directors Meeting. AGENCY: The meeting will be held on August 29, 2013, from 12:00 Noon to 3:00 p.m., Eastern Daylight Time. PLACE: This meeting will be open to the public via conference call. Any interested person may call 1–877–820– 7831, passcode, 908048 to listen and participate in this meeting. STATUS: Open to the public. MATTERS TO BE CONSIDERED: The Unified Carrier Registration Plan Board of Directors (the Board) will continue its work in developing and implementing the Unified Carrier Registration Plan and Agreement and to that end, may consider matters properly before the Board. mstockstill on DSK4VPTVN1PROD with NOTICES TIME AND DATE: Mr. Avelino Gutierrez, Chair, Unified Carrier Registration Board of Directors at (505) 827–4565. FOR FURTHER INFORMATION CONTACT: VerDate Mar<15>2010 19:07 Aug 02, 2013 Jkt 229001 Issued on: July 25, 2013. Larry W. Minor, Associate Administrator, Office of Policy, Federal Motor Carrier Safety Administration. [FR Doc. 2013–18916 Filed 8–1–13; 11:15 am] BILLING CODE 4910–EX–P DEPARTMENT OF TRANSPORTATION Federal Railroad Administration [Safety Advisory 2013–05] Joint Failure on Continuous Welded Rail Track Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Notice of safety advisory. AGENCY: FRA is issuing Safety Advisory 2013–05 to remind railroad track owners about the importance of reviewing current, internal continuous welded rail (CWR) plans and properly inspecting CWR joints to identify and correct locations that indicate potential joint failure that may cause a derailment. FRA is issuing this notice in response to two recent train derailments. Although the causes of these derailments are still under investigation, preliminary evidence suggests that failed joint bars played a significant role in both derailments. This notice reminds railroad track owners that they must comply with the requirements of their CWR plan procedures regarding inspecting track to identify indications of potential joint failure in CWR track, especially that of compromise joints. This notice also recommends that railroad track owners review their CWR plans to ensure that the instructions properly identify the necessary track maintenance procedures to remedy indications of potential joint failure that lead to rapid failure of joint bars. Finally, the notice recommends that railroad track owners follow good maintenance practices to ensure the joints are adequately supported and, wherever possible, eliminate joints in CWR, especially compromise joints in passenger and hazardous material routes. FOR FURTHER INFORMATION CONTACT: Mr. Kenneth Rusk, Staff Director, Track Division, Office of Railroad Safety, FRA, 1200 New Jersey Avenue SE., Washington, DC 20590, telephone (202) 493–6236; Mr. Carlo M. Patrick, Staff Director, Rail and Infrastructure Integrity Division, Office of Railroad Safety, FRA, 1200 New Jersey Avenue SE., Washington, DC 20590, telephone (202) 493–6399; or Ms. Elisabeth Galotto, Trial Attorney, Office of Chief SUMMARY: PO 00000 Frm 00216 Fmt 4703 Sfmt 4703 Counsel, FRA, 1200 New Jersey Avenue SE., Washington, DC 20590, telephone (202) 493–0270. SUPPLEMENTARY INFORMATION: Joints in CWR are considered one of the weakest elements of track structure. The track components at a joint are subject to stresses in vertical, lateral, and longitudinal planes. Although the number of CWR joint-caused derailments on a main line has been relatively small, these derailments can be catastrophic, especially if passenger trains or hazardous materials are involved. Recent accidents highlight the need for track owners, railroads, and their respective employees to review, reemphasize, and adhere to the requirements of a track owner’s CWR plan procedures and current internal engineering instructions that address inspecting track to identify stress conditions in CWR joints. FRA requires that a track owner comply with the contents of an approved or conditionally approved CWR plan under Title 49 Code of Federal Regulations (CFR) Section 213.118, Continuous welded rail (CWR), plan review and approval.1 See § 213.119, Continuous welded rail (CWR), plan contents. The plan must include procedures that prescribe the scheduling and conduct of inspections to detect cracks and other indications of potential failures in CWR joints. See § 213.119(h). These procedures are required to specify the conditions of actual or potential joint failure for which railroad personnel must inspect, including, at a minimum, (i) loose, bent, or missing joint bolts; (ii) rail end batter or mismatch that contributes to instability of the joint; and (iii) evidence of excessive longitudinal rail movement in or near the joint, including, but not limited to: wide rail gap, defective joint bolts, disturbed ballast, surface deviations, gap between tie plates and rail, or displaced rail anchors. See § 213.119(h)(3). Recent Incidents This section provides a brief summary of the circumstances surrounding two recent train derailments that appear to be related to joint bar failure in CWR. Information regarding these incidents is based on FRA and the respective railroad’s preliminary findings to date. The probable causes and contributing factors, if any, have not yet been established. Therefore, nothing in this safety advisory is intended to attribute 1 All references in this notice to a section or other provision of a regulation are to a section, part, or other provision in 49 CFR, unless otherwise specified. E:\FR\FM\05AUN1.SGM 05AUN1 Federal Register / Vol. 78, No. 150 / Monday, August 5, 2013 / Notices mstockstill on DSK4VPTVN1PROD with NOTICES a cause to these incidents, or place responsibility for these incidents on the acts or omissions of any person or entity. On May 17, 2013, at approximately 6:08 p.m., an eastbound Metro-North Commuter Railroad (Metro-North) train derailed near Bridgeport, CT. A portion of the derailed train fouled the adjacent track and was struck by a westbound Metro-North commuter train. Sixty-nine people were reportedly injured and damages to the equipment and track amounted to several million dollars. At the accident, a pair of broken compromise joint bars was found. The National Transportation Safety Board is currently investigating the derailment and will ultimately determine the cause of the accident. On March 18, 2013, an empty Long Island Rail Road (LIRR) passenger train derailed in Forest Hill, Queens, NY. Four of the train’s eight cars derailed while traveling 75 mph. The railroad’s preliminary investigation determined the cause to be a broken joint bar. Recommended Action Rail joints in CWR warrant special attention and maintenance. Adequate support (which includes good tie condition, sufficient ballast, and good drainage) is essential to preventing joint bar failure. FRA recommends that track owners and railroads: 1. Review the requirements of their CWR plans and train employees responsible for inspecting CWR, with a focus on inspecting CWR track to identify conditions of actual or potential joint failure. 2. Review current internal engineering instructions to ensure that the instructions contain the appropriate track maintenance instructions to remedy joint conditions that cause joint bars to fail and cause derailments. 3. Follow good maintenance practices to ensure the joints are adequately supported, in addition to all of the requirements prescribed in § 213.119. Ties under and adjacent to CWR joints must be capable of supporting the traffic loading. When spot tamping the joints by hand, joints should be raised at least 1 inch to ensure the ballast particles are properly tamped under the entire width of ties. If the tamping is conducted in hot weather without immediate mechanical track stabilization, as is the case with machine tamping, a speed restriction is required to reduce the risk of track buckling. 4. Perform appropriate ballast maintenance to ensure proper track drainage for adequate tie support. 5. Wherever possible, eliminate joints in CWR, especially compromise joints VerDate Mar<15>2010 19:07 Aug 02, 2013 Jkt 229001 in passenger and hazardous materials routes. 6. Reinforce with employees responsible for inspecting track the importance of the proper installation and maintenance of joints by ensuring that sufficient anchoring, ballast, and ties ensure the integrity of the joint. This is especially important around compromise joints, which by design typically have a suspended joint configuration. 7. If joint bars (and particularly compromise joint bars) are found cracked or broken between the middle two bolt holes after a relatively short time after installation, determine the root cause that led to the premature failure of the joint bars and correct the deficiency. FRA strongly encourages railroads and track owners to take actions that are consistent with the preceding recommendations to help ensure the safety of the Nation’s railroad employees and the public. FRA may modify Safety Advisory 2013–05, issue additional safety advisories, or take other appropriate actions it deems necessary to ensure the highest level of safety on the Nation’s railroads, including pursuing other corrective measures under its rail safety authority. Robert C. Lauby, Deputy Associate Administrator for Regulatory and Legislative Operations. [FR Doc. 2013–18787 Filed 8–2–13; 8:45 am] BILLING CODE 4910–06–P DEPARTMENT OF TRANSPORTATION Federal Transit Administration [Docket No. FTA–2012–0029] Notice of Proposed Buy America Waiver AGENCY: Federal Transit Administration, DOT. Notice of proposed Buy America waiver and request for comment. ACTION: The Federal Transit Administration (FTA) received a request for a waiver to permit the purchase of minivans that are non-compliant with FTA Buy America requirements using FTA funding. The request is from the North Front Range Metropolitan Planning Organization (NFRMPO). NFRMPO is in the process of procuring vehicles for its vanpool program, ‘‘VanGo.’’ In accordance with 49 U.S.C. 5323(j)(3)(A), FTA is providing notice of the waiver request and seeks public comment before deciding whether to SUMMARY: PO 00000 Frm 00217 Fmt 4703 Sfmt 4703 47487 grant the request. If granted, the waiver would be for the Buy America final assembly requirement only and would apply only to the FTA-funded procurement by NFRMPO. DATES: Comments must be received by September 4, 2013. Late-filed comments will be considered to the extent practicable. Please submit your comments by one of the following means, identifying your submissions by docket number FTA–2013–0027: 1. Web site: https:// www.regulations.gov. Follow the instructions for submitting comments on the U.S. Government electronic docket site. 2. Fax: (202) 493–2251. 3. Mail: U.S. Department of Transportation, 1200 New Jersey Avenue SE., Docket Operations, M–30, West Building, Ground Floor, Room W12–140, Washington, DC 20590–0001. 4. Hand Delivery: U.S. Department of Transportation, 1200 New Jersey Avenue SE., Docket Operations, M–30, West Building, Ground Floor, Room W12–140, Washington, DC 20590–0001 between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. Instructions: All submissions must make reference to the ‘‘Federal Transit Administration’’ and include docket number FTA–2013–0027. Due to the security procedures in effect since October 2011, mail received through the U.S. Postal Service may be subject to delays. Parties making submissions responsive to this notice should consider using an express mail firm to ensure the prompt filing of any submissions not filed electronically or by hand. Note that all submissions received, including any personal information therein, will be posted without change or alteration to https:// www.regulations.gov. For more information, you may review DOT’s complete Privacy Act Statement in the Federal Register published April 11, 2000 (65 FR 19477), or you may visit https://www.regulations.gov. FOR FURTHER INFORMATION CONTACT: Mary J. Lee, FTA Attorney-Advisor, at (202) 366–0985 or mary.j.lee@dot.gov. SUPPLEMENTARY INFORMATION: The purpose of this notice is to provide notice and seek comment on whether the Federal Transit Administration (FTA) should a grant non-availability waiver for NFRMPO’s procurement of minivans or similar vehicles (minivans). If granted, the waiver would be limited to the Buy America final assembly requirement under 49 U.S.C. 5323(j)(2)(C)(ii) and 49 CFR 661.11. ADDRESSES: E:\FR\FM\05AUN1.SGM 05AUN1

Agencies

[Federal Register Volume 78, Number 150 (Monday, August 5, 2013)]
[Notices]
[Pages 47486-47487]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-18787]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration

[Safety Advisory 2013-05]


Joint Failure on Continuous Welded Rail Track

AGENCY: Federal Railroad Administration (FRA), Department of 
Transportation (DOT).

ACTION: Notice of safety advisory.

-----------------------------------------------------------------------

SUMMARY: FRA is issuing Safety Advisory 2013-05 to remind railroad 
track owners about the importance of reviewing current, internal 
continuous welded rail (CWR) plans and properly inspecting CWR joints 
to identify and correct locations that indicate potential joint failure 
that may cause a derailment. FRA is issuing this notice in response to 
two recent train derailments. Although the causes of these derailments 
are still under investigation, preliminary evidence suggests that 
failed joint bars played a significant role in both derailments. This 
notice reminds railroad track owners that they must comply with the 
requirements of their CWR plan procedures regarding inspecting track to 
identify indications of potential joint failure in CWR track, 
especially that of compromise joints. This notice also recommends that 
railroad track owners review their CWR plans to ensure that the 
instructions properly identify the necessary track maintenance 
procedures to remedy indications of potential joint failure that lead 
to rapid failure of joint bars. Finally, the notice recommends that 
railroad track owners follow good maintenance practices to ensure the 
joints are adequately supported and, wherever possible, eliminate 
joints in CWR, especially compromise joints in passenger and hazardous 
material routes.

FOR FURTHER INFORMATION CONTACT: Mr. Kenneth Rusk, Staff Director, 
Track Division, Office of Railroad Safety, FRA, 1200 New Jersey Avenue 
SE., Washington, DC 20590, telephone (202) 493-6236; Mr. Carlo M. 
Patrick, Staff Director, Rail and Infrastructure Integrity Division, 
Office of Railroad Safety, FRA, 1200 New Jersey Avenue SE., Washington, 
DC 20590, telephone (202) 493-6399; or Ms. Elisabeth Galotto, Trial 
Attorney, Office of Chief Counsel, FRA, 1200 New Jersey Avenue SE., 
Washington, DC 20590, telephone (202) 493-0270.

SUPPLEMENTARY INFORMATION: Joints in CWR are considered one of the 
weakest elements of track structure. The track components at a joint 
are subject to stresses in vertical, lateral, and longitudinal planes. 
Although the number of CWR joint-caused derailments on a main line has 
been relatively small, these derailments can be catastrophic, 
especially if passenger trains or hazardous materials are involved. 
Recent accidents highlight the need for track owners, railroads, and 
their respective employees to review, reemphasize, and adhere to the 
requirements of a track owner's CWR plan procedures and current 
internal engineering instructions that address inspecting track to 
identify stress conditions in CWR joints.
    FRA requires that a track owner comply with the contents of an 
approved or conditionally approved CWR plan under Title 49 Code of 
Federal Regulations (CFR) Section 213.118, Continuous welded rail 
(CWR), plan review and approval.\1\ See Sec.  213.119, Continuous 
welded rail (CWR), plan contents. The plan must include procedures that 
prescribe the scheduling and conduct of inspections to detect cracks 
and other indications of potential failures in CWR joints. See Sec.  
213.119(h). These procedures are required to specify the conditions of 
actual or potential joint failure for which railroad personnel must 
inspect, including, at a minimum, (i) loose, bent, or missing joint 
bolts; (ii) rail end batter or mismatch that contributes to instability 
of the joint; and (iii) evidence of excessive longitudinal rail 
movement in or near the joint, including, but not limited to: wide rail 
gap, defective joint bolts, disturbed ballast, surface deviations, gap 
between tie plates and rail, or displaced rail anchors. See Sec.  
213.119(h)(3).
---------------------------------------------------------------------------

    \1\ All references in this notice to a section or other 
provision of a regulation are to a section, part, or other provision 
in 49 CFR, unless otherwise specified.
---------------------------------------------------------------------------

Recent Incidents

    This section provides a brief summary of the circumstances 
surrounding two recent train derailments that appear to be related to 
joint bar failure in CWR. Information regarding these incidents is 
based on FRA and the respective railroad's preliminary findings to 
date. The probable causes and contributing factors, if any, have not 
yet been established. Therefore, nothing in this safety advisory is 
intended to attribute

[[Page 47487]]

a cause to these incidents, or place responsibility for these incidents 
on the acts or omissions of any person or entity.
    On May 17, 2013, at approximately 6:08 p.m., an eastbound Metro-
North Commuter Railroad (Metro-North) train derailed near Bridgeport, 
CT. A portion of the derailed train fouled the adjacent track and was 
struck by a westbound Metro-North commuter train. Sixty-nine people 
were reportedly injured and damages to the equipment and track amounted 
to several million dollars. At the accident, a pair of broken 
compromise joint bars was found. The National Transportation Safety 
Board is currently investigating the derailment and will ultimately 
determine the cause of the accident.
    On March 18, 2013, an empty Long Island Rail Road (LIRR) passenger 
train derailed in Forest Hill, Queens, NY. Four of the train's eight 
cars derailed while traveling 75 mph. The railroad's preliminary 
investigation determined the cause to be a broken joint bar.

Recommended Action

    Rail joints in CWR warrant special attention and maintenance. 
Adequate support (which includes good tie condition, sufficient 
ballast, and good drainage) is essential to preventing joint bar 
failure. FRA recommends that track owners and railroads:
    1. Review the requirements of their CWR plans and train employees 
responsible for inspecting CWR, with a focus on inspecting CWR track to 
identify conditions of actual or potential joint failure.
    2. Review current internal engineering instructions to ensure that 
the instructions contain the appropriate track maintenance instructions 
to remedy joint conditions that cause joint bars to fail and cause 
derailments.
    3. Follow good maintenance practices to ensure the joints are 
adequately supported, in addition to all of the requirements prescribed 
in Sec.  213.119. Ties under and adjacent to CWR joints must be capable 
of supporting the traffic loading. When spot tamping the joints by 
hand, joints should be raised at least 1 inch to ensure the ballast 
particles are properly tamped under the entire width of ties. If the 
tamping is conducted in hot weather without immediate mechanical track 
stabilization, as is the case with machine tamping, a speed restriction 
is required to reduce the risk of track buckling.
    4. Perform appropriate ballast maintenance to ensure proper track 
drainage for adequate tie support.
    5. Wherever possible, eliminate joints in CWR, especially 
compromise joints in passenger and hazardous materials routes.
    6. Reinforce with employees responsible for inspecting track the 
importance of the proper installation and maintenance of joints by 
ensuring that sufficient anchoring, ballast, and ties ensure the 
integrity of the joint. This is especially important around compromise 
joints, which by design typically have a suspended joint configuration.
    7. If joint bars (and particularly compromise joint bars) are found 
cracked or broken between the middle two bolt holes after a relatively 
short time after installation, determine the root cause that led to the 
premature failure of the joint bars and correct the deficiency.
    FRA strongly encourages railroads and track owners to take actions 
that are consistent with the preceding recommendations to help ensure 
the safety of the Nation's railroad employees and the public. FRA may 
modify Safety Advisory 2013-05, issue additional safety advisories, or 
take other appropriate actions it deems necessary to ensure the highest 
level of safety on the Nation's railroads, including pursuing other 
corrective measures under its rail safety authority.

Robert C. Lauby,
Deputy Associate Administrator for Regulatory and Legislative 
Operations.
[FR Doc. 2013-18787 Filed 8-2-13; 8:45 am]
BILLING CODE 4910-06-P