Commission Information Collection Activities (FERC-582); Comment Request, 47310-47311 [2013-18745]
Download as PDF
47310
Federal Register / Vol. 78, No. 150 / Monday, August 5, 2013 / Notices
the Defense Finance and Accounting
Service, Freedom of Information/
Privacy Act Program Manager,
Corporate Communications, DFAS–
ZCF/IN, 8899 E. 56th Street,
Indianapolis, IN 46249–0150.’’
*
*
*
*
*
[FR Doc. 2013–18772 Filed 8–2–13; 8:45 am]
BILLING CODE 5001–06–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. Ic13–15–000]
Commission Information Collection
Activities (FERC–582); Comment
Request
Federal Energy Regulatory
Commission, DOE.
ACTION: Comment request.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3507(a)(1)(D), the Federal Energy
Regulatory Commission (Commission or
FERC) is submitting the information
collection FERC–582 (Electric Fees,
Annual Charges, Waivers, and
Exemptions) to the Office of
Management and Budget (OMB) for
review of the information collection
requirements. Any interested person
may file comments directly with OMB
and should address a copy of those
comments to the Commission as
explained below. The Commission
issued a Notice in the Federal Register
(78 FR 30912, 5/23/2013) requesting
public comments. FERC received no
comments on the FERC–582 and is
making this notation in its submittal to
OMB.
DATES: Comments on the collection of
information are due by September 4,
2013.
SUMMARY:
Comments filed with OMB,
identified by the OMB Control No.
1902–0132, should be sent via email to
the Office of Information and Regulatory
Affairs: oira_submission@omb.gov.
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at 202–395–4718.
mstockstill on DSK4VPTVN1PROD with NOTICES
ADDRESSES:
VerDate Mar<15>2010
19:07 Aug 02, 2013
Jkt 229001
A copy of the comments should also
be sent to the Federal Energy Regulatory
Commission, identified by the Docket
No. IC13–15–000, by either of the
following methods:
• eFiling at Commission’s Web site:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Title: Electric Fees, Annual Charges,
Waivers, and Exemptions.
OMB Control No.: 1902–0132.
Type of Request: Three-year extension
of the FERC–582 information collection
requirements with no changes to the
reporting requirements.
Abstract: The information required by
FERC–582 is contained within 18 Code
of Federal Regulations (CFR) part 381 1
and part 382 2.
The Commission uses the FERC–582
to implement the statutory provisions of
the Independent Offices Appropriation
Act of 1952 (IOAA) 3 which authorizes
the Commission to establish fees for its
services. In addition, the Omnibus
Budget Reconciliation Act of 1986
(OBRA) 4 authorizes the Commission to
assess and collect fees and annual
1 Title 18 CFR, Sections 381.105, 381.106,
381.108, 381.302, and 381.305.
2 Title 18 CFR, Sections 382.102, 382.103,
382.105, 382.106, and 382.201.
3 31 USC 9701.
4 42 USC 7178.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
charges in any fiscal year in amounts
equal to all the costs incurred by the
Commission in that fiscal year.
To comply with the FERC–582,
respondents submit to the Commission
the sum of the megawatt-hours (MWh)
of all unbundled transmission
(including MWh delivered in wheeling
transactions and MWh delivered in
exchange transactions) and the
megawatt-hours of all bundled
wholesale power sales (to the extent the
bundled wholesale power sales were not
separately reported as unbundled
transmission). The data collected within
the FERC–582 is drawn directly from
the FERC Form 1 transmission data. The
Commission sums the costs of its
electric regulatory program and
subtracts all electric regulatory program
filing fee collections to determine the
total collectible electric regulatory
program costs. Then, the Commission
uses the data submitted under FERC–
582 to determine the total megawatthours of transmission of electric energy
in interstate commerce.
Respondents (public utilities, power
marketers) subject to these annual
charges must submit FERC–582 data to
the Commission by April 30 of each
year.5 The Commission issues bills for
annual charges to respondents. Then,
respondents must pay the charges
within 45 days of the Commission’s
issuance of the bill.
Respondents may file requests for
waivers and exemptions of fees and
charges 6 based on need. The
Commission’s staff uses the filer’s
financial information to evaluate the
request for a waiver or exemption of the
obligation to pay a fee or an annual
charge.
Type of Respondents: Public utilities
and power marketers.
Estimate of Annual Burden 7: The
Commission estimates the total Public
Reporting Burden for this information
collection as:
5 18
CFR 382.201.
CFR 381 and 382.
7 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
explanation of what is included in the information
collection burden, reference 5 Code of Federal
Regulations 1320.3.
6 18
E:\FR\FM\05AUN1.SGM
05AUN1
47311
Federal Register / Vol. 78, No. 150 / Monday, August 5, 2013 / Notices
FERC–582—ELECTRIC FEES; ANNUAL CHARGES; WAIVERS; AND EXEMPTIONS
Number of
respondents
Annual
number of
responses per
respondent
Annual total
number of
responses
Average
annual burden
hours per
response
Estimated total
annual burden
(A)
(B)
(A) x (B) = (C)
(D)
(C) x (D)
114
1
114
1
114
FERC–582 ...........................................................................
The total estimated annual cost
burden to respondents is $7,980 [114
hours * $70 per hour 8 = $7,980]
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: July 29, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–18745 Filed 8–2–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2570–031]
mstockstill on DSK4VPTVN1PROD with NOTICES
Ohio Power Company; AEP Generation
Resources, Inc.; Notice of Application
for Transfer of License, and Soliciting
Comments and Motions to Intervene
On July 19, 2013, Ohio Power
Company (transferor) and AEP
Generation Resources, Inc. (transferee)
filed an application for transfer of
license for the Racine Hydroelectric
Project, FERC No. 2570, located at the
U.S. Corps of Engineers Racine Locks
and Dam on the Ohio River in Meigs
County, Ohio.
Applicants seek Commission approval
to transfer the license for the Racine
Hydroelectric Project from the transferor
to the transferee.
Applicants’ Contact: For transferor:
Mr. Ken McDonough, Assistant General
Counsel—Real Estate, American Electric
Power Service Corporation, 1 Riverside
Plaza, Columbus, OH 43215, telephone
(614) 716–1696 and Mr. Frank M.
Simms, AER Plant Manager II, American
Electric Power Service Corporation, 40
Franklin Road, Roanoke, VA 24011,
telephone (540) 985–2875. For
transferee: Mr. Jeffrey D. Cross, Deputy
General Counsel, American Electric
Power Service Corporation, 1 Riverside
Plaza, Columbus, OH 43215, (614) 716–
1580.
FERC Contact: Patricia W. Gillis (202)
502–8735, patricia.gillis@ferc.gov.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice, by the
Commission. Comments and motions to
intervene may be filed electronically via
the Internet. See 18 CFR 385.2001(a)(1)
and the instructions on the
Commission’s Web site under https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project can
be viewed or printed on the eLibrary
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–2570) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–18747 Filed 8–2–13; 8:45 am]
BILLING CODE 6717–01–P
8 This is a loaded cost (wages plus benefits) for
a full-time employee.
VerDate Mar<15>2010
19:07 Aug 02, 2013
Jkt 229001
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2401–003;
ER10–2423–003; ER10–2404–003;
ER10–2406–003.
Applicants: Blue Canyon Windpower
II LLC, Flat Rock Windpower LLC, Flat
Rock Windpower II LLC, High Trail
Wind Farm, LLC.
Description: Notice of Non-Material
Change in Status of Blue Canyon
Windpower II LLC, et al.
Filed Date: 7/26/13.
Accession Number: 20130726–5180.
Comments Due: 5 p.m. ET 8/16/13.
Docket Numbers: ER11–4026–002.
Applicants: Eel River Power LLC.
Description: Supplement to June 28,
2013 Notice of Change in Status to be
effective 9/26/2013.
Filed Date: 7/26/13.
Accession Number: 20130726–5154.
Comments Due: 5 p.m. ET 8/16/13.
Docket Numbers: ER12–1320–002.
Applicants: Desert View Power, Inc.
Description: Supplement to Notice of
Change in Status to be effective 9/26/
2013.
Filed Date: 7/26/13.
Accession Number: 20130726–5155.
Comments Due: 5 p.m. ET 8/16/13.
Docket Numbers: ER13–1514–000.
Applicants: Public Service Company
of Colorado.
Description: 2013–07–25_PSC–TSGT
Davis Intm CA 341 Comp Filing to be
effective N/A.
Filed Date: 7/25/13.
Accession Number: 20130725–5107.
Comments Due: 5 p.m. ET 8/15/13.
Docket Numbers: ER13–1793–001.
Applicants: Hazle Spindle, LLC.
Description: Hazle Spindle, LLC
submits Supplement to July 15, 2013
tariff filing Amendment.
Filed Date: 7/26/13.
Accession Number: 20130726–5179.
Comments Due: 5 p.m. ET 8/16/13.
Docket Numbers: ER13–2040–000.
E:\FR\FM\05AUN1.SGM
05AUN1
Agencies
[Federal Register Volume 78, Number 150 (Monday, August 5, 2013)]
[Notices]
[Pages 47310-47311]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-18745]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. Ic13-15-000]
Commission Information Collection Activities (FERC-582); Comment
Request
AGENCY: Federal Energy Regulatory Commission, DOE.
ACTION: Comment request.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of the Paperwork Reduction
Act of 1995, 44 U.S.C. 3507(a)(1)(D), the Federal Energy Regulatory
Commission (Commission or FERC) is submitting the information
collection FERC-582 (Electric Fees, Annual Charges, Waivers, and
Exemptions) to the Office of Management and Budget (OMB) for review of
the information collection requirements. Any interested person may file
comments directly with OMB and should address a copy of those comments
to the Commission as explained below. The Commission issued a Notice in
the Federal Register (78 FR 30912, 5/23/2013) requesting public
comments. FERC received no comments on the FERC-582 and is making this
notation in its submittal to OMB.
DATES: Comments on the collection of information are due by September
4, 2013.
ADDRESSES: Comments filed with OMB, identified by the OMB Control No.
1902-0132, should be sent via email to the Office of Information and
Regulatory Affairs: oira_submission@omb.gov. Attention: Federal Energy
Regulatory Commission Desk Officer. The Desk Officer may also be
reached via telephone at 202-395-4718.
A copy of the comments should also be sent to the Federal Energy
Regulatory Commission, identified by the Docket No. IC13-15-000, by
either of the following methods:
eFiling at Commission's Web site: https://www.ferc.gov/docs-filing/efiling.asp.
Mail/Hand Delivery/Courier: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE.,
Washington, DC 20426.
Instructions: All submissions must be formatted and filed in
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676
(toll-free), or (202) 502-8659 for TTY.
Docket: Users interested in receiving automatic notification of
activity in this docket or in viewing/downloading comments and
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at
DataClearance@FERC.gov, by telephone at (202) 502-8663, and by fax at
(202) 273-0873.
SUPPLEMENTARY INFORMATION:
Title: Electric Fees, Annual Charges, Waivers, and Exemptions.
OMB Control No.: 1902-0132.
Type of Request: Three-year extension of the FERC-582 information
collection requirements with no changes to the reporting requirements.
Abstract: The information required by FERC-582 is contained within
18 Code of Federal Regulations (CFR) part 381 \1\ and part 382 \2\.
---------------------------------------------------------------------------
\1\ Title 18 CFR, Sections 381.105, 381.106, 381.108, 381.302,
and 381.305.
\2\ Title 18 CFR, Sections 382.102, 382.103, 382.105, 382.106,
and 382.201.
---------------------------------------------------------------------------
The Commission uses the FERC-582 to implement the statutory
provisions of the Independent Offices Appropriation Act of 1952 (IOAA)
\3\ which authorizes the Commission to establish fees for its services.
In addition, the Omnibus Budget Reconciliation Act of 1986 (OBRA) \4\
authorizes the Commission to assess and collect fees and annual charges
in any fiscal year in amounts equal to all the costs incurred by the
Commission in that fiscal year.
---------------------------------------------------------------------------
\3\ 31 USC 9701.
\4\ 42 USC 7178.
---------------------------------------------------------------------------
To comply with the FERC-582, respondents submit to the Commission
the sum of the megawatt-hours (MWh) of all unbundled transmission
(including MWh delivered in wheeling transactions and MWh delivered in
exchange transactions) and the megawatt-hours of all bundled wholesale
power sales (to the extent the bundled wholesale power sales were not
separately reported as unbundled transmission). The data collected
within the FERC-582 is drawn directly from the FERC Form 1 transmission
data. The Commission sums the costs of its electric regulatory program
and subtracts all electric regulatory program filing fee collections to
determine the total collectible electric regulatory program costs.
Then, the Commission uses the data submitted under FERC-582 to
determine the total megawatt-hours of transmission of electric energy
in interstate commerce.
Respondents (public utilities, power marketers) subject to these
annual charges must submit FERC-582 data to the Commission by April 30
of each year.\5\ The Commission issues bills for annual charges to
respondents. Then, respondents must pay the charges within 45 days of
the Commission's issuance of the bill.
---------------------------------------------------------------------------
\5\ 18 CFR 382.201.
---------------------------------------------------------------------------
Respondents may file requests for waivers and exemptions of fees
and charges \6\ based on need. The Commission's staff uses the filer's
financial information to evaluate the request for a waiver or exemption
of the obligation to pay a fee or an annual charge.
---------------------------------------------------------------------------
\6\ 18 CFR 381 and 382.
---------------------------------------------------------------------------
Type of Respondents: Public utilities and power marketers.
Estimate of Annual Burden \7\: The Commission estimates the total
Public Reporting Burden for this information collection as:
---------------------------------------------------------------------------
\7\ Burden is defined as the total time, effort, or financial
resources expended by persons to generate, maintain, retain, or
disclose or provide information to or for a Federal agency. For
further explanation of what is included in the information
collection burden, reference 5 Code of Federal Regulations 1320.3.
[[Page 47311]]
FERC-582--Electric Fees; Annual Charges; Waivers; and Exemptions
--------------------------------------------------------------------------------------------------------------------------------------------------------
Annual number Annual total Average annual
Number of of responses number of burden hours Estimated total
respondents per respondent responses per response annual burden
(A) (B) (A) x (B) = (C) (D) (C) x (D)
--------------------------------------------------------------------------------------------------------------------------------------------------------
FERC-582........................................................... 114 1 114 1 114
--------------------------------------------------------------------------------------------------------------------------------------------------------
The total estimated annual cost burden to respondents is $7,980
[114 hours * $70 per hour \8\ = $7,980]
---------------------------------------------------------------------------
\8\ This is a loaded cost (wages plus benefits) for a full-time
employee.
---------------------------------------------------------------------------
Comments: Comments are invited on: (1) Whether the collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimate of the burden and
cost of the collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information collection; and (4) ways to
minimize the burden of the collection of information on those who are
to respond, including the use of automated collection techniques or
other forms of information technology.
Dated: July 29, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-18745 Filed 8-2-13; 8:45 am]
BILLING CODE 6717-01-P