St. Paul Park Refining Co. LLC v. Enbridge Pipelines (North Dakota) LLC; Notice of Complaint, 46938 [2013-18588]

Download as PDF sroberts on DSK5SPTVN1PROD with NOTICES 46938 Federal Register / Vol. 78, No. 149 / Friday, August 2, 2013 / Notices Comments Due: 5 p.m. ET 8/16/13. Docket Numbers: ER13–2037–000. Applicants: Niagara Mohawk Power Corporation. Description: Niagara Mohawk Power Corporation submits Notice of Cancellation of Rate Schedule No. 249. Filed Date: 7/26/13. Accession Number: 20130726–5122. Comments Due: 5 p.m. ET 8/16/13. Docket Numbers: ER13–2038–000. Applicants: Hess Corporation. Description: Application for Tariff Waiver to submit exception for mustoffer bid requirement, by Hess Corporation. Filed Date: 7/26/13. Accession Number: 20130726–5129. Comments Due: 5 p.m. ET 8/2/13. Docket Numbers: ER13–2039–000. Applicants: Southwest Power Pool, Inc. Description: Appendix 1 to Attachment M—Westar Loss Factor Update to be effective 9/1/2012. Filed Date: 7/26/13. Accession Number: 20130726–5133. Comments Due: 5 p.m. ET 8/16/13. Take notice that the Commission received the following land acquisition reports: Docket Numbers: LA13–2–000, Applicants: Blue Sky East, LLC, Canandaigua Power Partners, LLC, Canandaigua Power Partners II, LLC, Erie Wind, LLC, Evergreen Wind Power, LLC, Evergreen Wind Power III, LLC, First Wind Energy Marketing, LLC, Milford Wind Corridor Phase I, LLC, Milford Wind Corridor Phase II, LLC, Palouse Wind, LLC, Niagara Wind Power, LLC, Stetson Holdings, LLC, Stetson Wind II, LLC, Vermont Wind, LLC. Description: Quarterly Land Acquisition Report of Blue Sky East, LLC, et al. Filed Date: 7/25/13. Accession Number: 20130725–5113. Comments Due: 5 p.m. ET 8/15/13. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH13–21–000. Applicants: Fortis Inc., FortisUS Holdings Nova Scotia Limited, FortisUS Inc.,CH Energy Group, Inc. Description: Fortis, Inc. and Certain Subsidiaries submit FERC–65–B Waiver Notification. Filed Date: 7/26/13. Accession Number: 20130726–5121. Comments Due: 5 p.m. ET 8/16/13. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings VerDate Mar<15>2010 18:55 Aug 01, 2013 Jkt 229001 must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 26, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–18662 Filed 8–1–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR13–28–000] St. Paul Park Refining Co. LLC v. Enbridge Pipelines (North Dakota) LLC; Notice of Complaint Take notice that on July 25, 2013, St. Paul Park Refining Co. LLC (Complainant) filed a formal complaint against Enbridge Pipelines (North Dakota) LLC (Respondent) pursuant to sections 1(5), 3(1), 8, 9, 13(1), 15(1), and 16(1) of the Interstate Commerce Act (ICA), 49 USC App. 1(5), 3(1), 8, 9, 13(1), 15(1), and 16(1), Rule 206 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.206, and section 343.1(a) of the Commission’s Procedural Rules Applicable to Oil Pipeline Proceedings, 18 CFR 343.1(a), alleging that the settlement agreement dealing with the Phase 6 Expansion Project of Enbridge Pipelines (North Dakota) LLC is no longer fair and reasonable and that the surcharge derived from the Settlement Agreement no longer has any regulatory basis. St. Paul Park Refining Co. LLC certifies that copies of the complaint were served on the contacts for Enbridge Pipelines (North Dakota) LLC as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on August 14, 2013. Dated: July 26, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–18588 Filed 8–1–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2558–029] Green Mountain Power Corporation; Notice of Availability of Final Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission (Commission) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for a new license for the 21.814-megawatt (MW) Otter Creek Hydroelectric Project (Commission Project No. 2558–029) and has prepared a final environmental assessment (final EA). The project consists of three developments (Proctor, Beldens, and Huntington Falls) located E:\FR\FM\02AUN1.SGM 02AUN1

Agencies

[Federal Register Volume 78, Number 149 (Friday, August 2, 2013)]
[Notices]
[Page 46938]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-18588]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. OR13-28-000]


St. Paul Park Refining Co. LLC v. Enbridge Pipelines (North 
Dakota) LLC; Notice of Complaint

    Take notice that on July 25, 2013, St. Paul Park Refining Co. LLC 
(Complainant) filed a formal complaint against Enbridge Pipelines 
(North Dakota) LLC (Respondent) pursuant to sections 1(5), 3(1), 8, 9, 
13(1), 15(1), and 16(1) of the Interstate Commerce Act (ICA), 49 USC 
App. 1(5), 3(1), 8, 9, 13(1), 15(1), and 16(1), Rule 206 of the 
Commission's Rules of Practice and Procedure, 18 CFR 385.206, and 
section 343.1(a) of the Commission's Procedural Rules Applicable to Oil 
Pipeline Proceedings, 18 CFR 343.1(a), alleging that the settlement 
agreement dealing with the Phase 6 Expansion Project of Enbridge 
Pipelines (North Dakota) LLC is no longer fair and reasonable and that 
the surcharge derived from the Settlement Agreement no longer has any 
regulatory basis.
    St. Paul Park Refining Co. LLC certifies that copies of the 
complaint were served on the contacts for Enbridge Pipelines (North 
Dakota) LLC as listed on the Commission's list of Corporate Officials.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on August 14, 2013.

    Dated: July 26, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-18588 Filed 8-1-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.