Drawbridge Operation Regulation Lake Washington, Seattle, WA, 46258 [2013-18341]
Download as PDF
46258
Federal Register / Vol. 78, No. 147 / Wednesday, July 31, 2013 / Rules and Regulations
address for the Filer Manual is https://
www.sec.gov/info/edgar.shtml. You can
also inspect the document at the
National Archives and Records
Administration (NARA). For
information on the availability of this
material at NARA, call 202–741–6030,
or go to: https://www.archives.gov/
federal_register/
code_of_federal_regulations/
ibr_locations.html.
By the Commission.
Dated: July 25, 2013.
Elizabeth M. Murphy,
Secretary.
[FR Doc. 2013–18395 Filed 7–30–13; 8:45 am]
BILLING CODE 8011–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0678]
Drawbridge Operation Regulation Lake
Washington, Seattle, WA
Coast Guard, DHS.
ACTION: Notice of deviation from
drawbridge regulation.
AGENCY:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Evergreen
Point Floating Bridge (State Route 520
across Lake Washington) at Seattle, WA.
This deviation is necessary to
accommodate the Seafair Air Show
practice and event. This deviation
allows the bridge to remain in the
closed position to help minimize traffic
congestion during the event.
DATES: This deviation is effective from
9:30 a.m. on August 1, 2013 to 3:30 p.m.
August 4, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0678] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Lieutenant
Commander Steven M. Fischer,
ehiers on DSK2VPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
14:07 Jul 30, 2013
Jkt 229001
Thirteenth Coast Guard District Bridge
Program Officer, telephone 206–220–
7277, email
Steven.M.Fischer2@uscg.mil. If you
have questions on viewing the docket,
call Barbara Hairston, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The
Washington State Department of
Transportation has requested that the
draw span of the Evergreen Point
Floating Bridge (State Route 520 across
Lake Washington) remain closed to
vessel traffic to facilitate safe passage of
participants of the Seafair Airshow
practice and event. Interstate 90 will be
closed to road traffic during this time,
which would divert road traffic onto the
Evergreen Point Floating Bridge. The
closure of the Evergreen Point Floating
Bridge will further help minimize road
traffic congestion resulting from the
closure of Interstate 90. The Evergreen
Point Floating Bridge provides three
navigational openings for vessel
passage, the movable floating span,
subject to this closure, and two fixed
navigational openings; one on the east
end of the bridge and one on the west
end. The fixed navigational opening on
the east end of the bridge provides a
horizontal clearance of 150 feet and a
vertical clearance of 57 feet at mean
high water. The opening on the west
end of the bridge provides a horizontal
clearance of 170 feet and a vertical
clearance of 44 feet at mean high water.
Vessels that are able to safely pass
through the fixed navigational openings
are allowed to do so during this closure
period. Under normal conditions,
during this time frame, the bridge
operates in accordance with 33 CFR
117.1049(a) which states the bridge
shall open on signal if at least two hours
notice is given. This deviation period is
from 9:30 a.m. on August 1, 2013 to 3:30
p.m. August 4, 2013. The deviation
allows the floating draw span of the
Evergreen Point Floating Bridge on Lake
Washington to remain in the closed
position and need not open for maritime
traffic from 9:30 a.m. to 3:00 p.m. on
August 1, 2013; 12:30 p.m. to 3:00 p.m.
on August 2, 2013; 12:30 p.m. to 3:30
p.m. on August 3, 2013; and 12:30 p.m.
to 3:30 p.m. on August 4, 2013. The
bridge shall operate in accordance to 33
CFR 117.1049(a) at all other times.
Waterway usage on the Lake
Washington Ship ranges from
commercial tug and barge to small
pleasure craft. Mariners will be notified
and kept informed of the bridge’s
operational status via the Coast Guard
Notice to Mariners publication and
Broadcast Notice to Mariners as
PO 00000
Frm 00010
Fmt 4700
Sfmt 4700
appropriate. The draw span will be
required to open, if needed, for vessels
engaged in emergency response
operations during this closure period.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: July 24, 2013.
Daryl R. Peloquin,
Acting Bridge Administrator.
[FR Doc. 2013–18341 Filed 7–30–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG–2013–0410]
RIN 1625–AA00
Safety Zone; Upper Mississippi River,
Mile 662.8 to 663.9
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
The Coast Guard is
establishing a temporary safety zone for
all waters of the Upper Mississippi
River, from mile 662.8 to 663.9,
extending the entire width of the river.
This safety zone is needed to protect
vessels transiting through the area on
the Upper Mississippi River. Entry into
this zone is prohibited unless
specifically authorized by the Captain of
the Port Upper Mississippi River or a
designated representative.
DATES: This rule is effective from 8:30
p.m. until 10 p.m. on August 10, 2013.
ADDRESSES: Documents indicated in this
preamble as being available in the
docket are part of docket USCG–2013–
0410 and are available online by going
to https://www.regulations.gov and
following the instructions on that Web
site. If you do not have access to the
internet, you may view the docket by
visiting the Docket Management Facility
in Room W12–140 on the ground floor
of the Department of Transportation
West Building, 1200 New Jersey Avenue
SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through
Friday, except Federal holidays. We
have an agreement with the Department
of Transportation to use the Docket
Management Facility.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
rule, call or email Lieutenant Colin
SUMMARY:
E:\FR\FM\31JYR1.SGM
31JYR1
Agencies
[Federal Register Volume 78, Number 147 (Wednesday, July 31, 2013)]
[Rules and Regulations]
[Page 46258]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-18341]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-0678]
Drawbridge Operation Regulation Lake Washington, Seattle, WA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Evergreen Point Floating Bridge
(State Route 520 across Lake Washington) at Seattle, WA. This deviation
is necessary to accommodate the Seafair Air Show practice and event.
This deviation allows the bridge to remain in the closed position to
help minimize traffic congestion during the event.
DATES: This deviation is effective from 9:30 a.m. on August 1, 2013 to
3:30 p.m. August 4, 2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0678] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Lieutenant Commander Steven M.
Fischer, Thirteenth Coast Guard District Bridge Program Officer,
telephone 206-220-7277, email Steven.M.Fischer2@uscg.mil. If you have
questions on viewing the docket, call Barbara Hairston, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Washington State Department of
Transportation has requested that the draw span of the Evergreen Point
Floating Bridge (State Route 520 across Lake Washington) remain closed
to vessel traffic to facilitate safe passage of participants of the
Seafair Airshow practice and event. Interstate 90 will be closed to
road traffic during this time, which would divert road traffic onto the
Evergreen Point Floating Bridge. The closure of the Evergreen Point
Floating Bridge will further help minimize road traffic congestion
resulting from the closure of Interstate 90. The Evergreen Point
Floating Bridge provides three navigational openings for vessel
passage, the movable floating span, subject to this closure, and two
fixed navigational openings; one on the east end of the bridge and one
on the west end. The fixed navigational opening on the east end of the
bridge provides a horizontal clearance of 150 feet and a vertical
clearance of 57 feet at mean high water. The opening on the west end of
the bridge provides a horizontal clearance of 170 feet and a vertical
clearance of 44 feet at mean high water. Vessels that are able to
safely pass through the fixed navigational openings are allowed to do
so during this closure period. Under normal conditions, during this
time frame, the bridge operates in accordance with 33 CFR 117.1049(a)
which states the bridge shall open on signal if at least two hours
notice is given. This deviation period is from 9:30 a.m. on August 1,
2013 to 3:30 p.m. August 4, 2013. The deviation allows the floating
draw span of the Evergreen Point Floating Bridge on Lake Washington to
remain in the closed position and need not open for maritime traffic
from 9:30 a.m. to 3:00 p.m. on August 1, 2013; 12:30 p.m. to 3:00 p.m.
on August 2, 2013; 12:30 p.m. to 3:30 p.m. on August 3, 2013; and 12:30
p.m. to 3:30 p.m. on August 4, 2013. The bridge shall operate in
accordance to 33 CFR 117.1049(a) at all other times. Waterway usage on
the Lake Washington Ship ranges from commercial tug and barge to small
pleasure craft. Mariners will be notified and kept informed of the
bridge's operational status via the Coast Guard Notice to Mariners
publication and Broadcast Notice to Mariners as appropriate. The draw
span will be required to open, if needed, for vessels engaged in
emergency response operations during this closure period.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: July 24, 2013.
Daryl R. Peloquin,
Acting Bridge Administrator.
[FR Doc. 2013-18341 Filed 7-30-13; 8:45 am]