Download as PDF Federal Register / Vol. 78, No. 146 / Tuesday, July 30, 2013 / Notices motion to intervene at the address provided above in accordance with Rule 214 of FERC’s Rules of Practice and Procedure (18 CFR 385.214). Fifteen copies of each comment, protest, or motion to intervene should be filed with DOE on or before the date listed above. Additional copies of such comment, protest, or motion to intervene should also be filed directly with: Mr. Robert S. Grimm, CEO/President, Soule Hydro, LLC, c/o Alaska Power & Telephone Company, 193 Otto Street, P.O. Box 3222, Port Townsend, WA 98368. Before a Presidential permit may be issued or amended, DOE must determine that the proposed action is in the public interest. In making that determination, DOE considers the environmental impacts of the proposed project pursuant to the National Environmental Policy Act of 1969, determines the project’s impact on electric reliability by ascertaining whether the proposed project would adversely affect the operation of the U.S. electric power supply system under normal and contingency conditions, and considers any other factors that may also be relevant to the public interest. DOE must obtain the concurrences of the Secretary of State and the Secretary of Defense before taking final action on a Presidential permit application. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at https:// www.oe.energy.gov/permits_ pending.htm, or by emailing Angela Troy at angela.troy@hq.doe.gov. Issued in Washington, DC, on July 24, 2013. Brian Mills, Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2013–18241 Filed 7–29–13; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC13–14–000] pmangrum on DSK3VPTVN1PROD with NOTICES Commission Information Collection Activities (FERC Form 80); Comment Request; Extension Federal Energy Regulatory Commission. ACTION: Comment request. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507(a)(1)(D), the Federal Energy SUMMARY: VerDate Mar<15>2010 14:32 Jul 29, 2013 Jkt 229001 Regulatory Commission (Commission or FERC) is submitting the information collection, FERC Form 80, Licensed Hydropower Development Recreation Report, to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission issued a Notice in the Federal Register (78 FR 28820, 5/16/2013) requesting public comments. FERC received no comments on the FERC Form 80 and is making this notation in its submittal to OMB. DATES: Comments on the collection of information are due August 29, 2013. ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 1902–0106, should be sent via email to the Office of Information and Regulatory Affairs: oira_submission@omb.gov. Attention: Federal Energy Regulatory Commission Desk Officer. The Desk Officer may also be reached via telephone at 202–395–4718. A copy of the comments should also be sent to the Federal Energy Regulatory Commission, identified by the Docket No. IC13–14–000, by either of the following methods: • eFiling at Commission’s Web site: https://www.ferc.gov/docs-filing/ efiling.asp • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–8663, and fax at (202) 273– 0873. SUPPLEMENTARY INFORMATION: Title: FERC Form 80, Licensed Hydropower Development Recreation Report. OMB Control No.: 1902–0106. Type of Request: Minor revisions to the FERC Form 80 information PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 45919 collection requirements with no change to the current reporting burden. Abstract: FERC uses the information on the FERC Form 80 to implement the statutory provisions of sections 4(a), 10(a), 301(a), 304 and 309 of the Federal Power Act (FPA), 16 U.S.C. 797, 803, 825c & 8254. FERC’s authority to collect this information comes from section 10(a) of the FPA which requires the Commission to be responsible for ensuring that hydro projects subject to FERC jurisdiction are consistent with the comprehensive development of the nation’s waterway for recreation and other beneficial public uses. In the interest of fulfilling these objectives, FERC expects licensees subject to its jurisdiction to recognize the resources that are affected by their activities and to play a role in protecting such resources. FERC Form 80 is a report on the use and development of recreational facilities at hydropower projects licensed by the Commission. Applications for licenses, amendments to licenses, and/or changes in land rights frequently involve changes in resources available for recreation. FERC utilizes the FERC Form 80 data when analyzing the adequacy of existing public recreational facilities and when processing and reviewing proposed amendments to help determine the impact of such changes. In addition, the FERC regional office staff uses the FERC Form 80 data when conducting inspections of licensed projects. FERC inspectors use the data in evaluating compliance with various license conditions and in identifying recreational facilities at hydropower projects. The FERC Form 80 requires data specified by Title 18 of the Code of Federal Regulations (CFR) under Parts 8.11 and 141.14 (and discussed at https://www.ferc.gov/docs-filing/ forms.asp#80). FERC collects the FERC Form 80 once every six years. The last collection was due on April 1, 2009, for data compiled during the 2008 calendar year. The next collection of the FERC Form 80 is due on April 1, 2015, with subsequent collections due every sixth year, for data compiled during the previous calendar year. The Commission made minor revisions throughout the form. Specifically, FERC clarified and simplified instructions, removed redundancy in certain questions, clarified questions and terms, and generally improved the readability of the form. FERC has attached the revised form to this notice. E:\FR\FM\30JYN1.SGM 30JYN1 45920 Federal Register / Vol. 78, No. 146 / Tuesday, July 30, 2013 / Notices Type of Respondents: Hydropower project licensees. Estimate of Annual Burden:1 For each reporting period, FERC estimates the total Public Reporting Burden for this information collection as: (a) 1,000 respondents, (b) 0.167 responses/ respondent, and (c) 3 hours per response, giving a total of 501 burden hours. The Commission has increased its total number of respondents to reflect the actual numbers we received during the last two reporting periods. In addition, FERC spreads the burden hours and costs over the six-year collection cycle in the table below to reflect how the information is collected. The average burden hours per response remains unchanged. These are the figures FERC will submit to OMB. FERC–80—LICENSED HYDROPOWER DEVELOPMENT RECREATION REPORT Number of respondents Number of responses per respondent 2 Total number of responses Average burden hours per response Estimated total annual burden (A) (B) (A) × (B) = (C) (D) (C) × (D) 1,000 0.167 167 3 501 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1483–001. Applicants: Dominion Energy Kewaunee, Inc. Description: Supplement to June 29, 2012 Market Power Analyses Report of Dominion Energy Kewaunee, Inc. Filed Date: 6/17/13. Accession Number: 20130617–5076. Comments Due: 5 p.m. ET 8/13/13. Docket Numbers: ER10–1483–003, ER10–2386–002; ER10–1823–002; ER10–1462–002; ER10–1996–002; ER10–1802–001; ER10–2413–002; ER10–2309–002; ER10–1917–002; ER13–1403–002; ER10–2458–002; ER10–2468–003. Applicants: Dominion Energy Kewaunee, Inc., Fairless Energy, LLC, Dominion Energy Marketing, Inc., Dominion Energy Brayton Point, LLC, Dominion Energy Kewaunee, Inc., Dominion Retail, Inc., Dominion Energy Manchester Street, Inc., Kincaid Generation, L.L.C., Elwood Energy, LLC, Dominion Nuclear Connecticut, Inc., Dominion Bridgeport Fuel Cell, LLC, NedPower Mount Storm, LLC, Fowler Ridge Wind Farm LLC. Description: Second Supplement to June 29, 2012 Market Power Analyses Report of Dominion Energy Kewaunee, Inc., et al. Filed Date: 6/28/13. Accession Number: 20130628–5319. Comments Due: 5 p.m. ET 8/13/13. Docket Numbers: ER13–101–003. Applicants: Midcontinent Independent System Operator, Inc. Description: 07–22–13 ATCLLC Order 1000 Compliance to be effective 12/31/ 9998. Filed Date: 7/22/13. Accession Number: 20130722–5157. Comments Due: 5 p.m. ET 8/21/13. Docket Numbers: ER13–198–002. Applicants: PJM Interconnection, L.L.C. Description: PJM Order 1000 Compliance filing per 3/22/2013 Order in Docket No. ER13–198–000 to be effective 1/1/2014. Filed Date: 7/22/13. Accession Number: 20130722–5164. Comments Due: 5 p.m. ET 8/21/13. Docket Numbers: ER13–690–003. Applicants: Public Service Company of New Mexico. Description: Attachment H Compliance Filing to be effective 8/2/ 2011. Filed Date: 7/22/13. Accession Number: 20130722–5128. Comments Due: 5 p.m. ET 8/12/13. Docket Numbers: ER13–690–004. Applicants: Public Service Company of New Mexico. Description: Public Service Company of New Mexico submits Attachment H Compliance to be effective 8/2/2013. Filed Date: 7/23/13. Accession Number: 20130723–5074. Comments Due: 5 p.m. ET 8/13/13. Docket Numbers: ER13–1366–000. Applicants: Public Service Company of New Mexico. Description: Public Service Company of New Mexico submits Gallup Refund Report to be effective N/A. Filed Date: 7/23/13. Accession Number: 20130723–5065. Comments Due: 5 p.m. ET 8/13/13. Docket Numbers: ER13–1631–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Errata to June 4, 2013 Request for Waiver of certain tariff provisions of Midcontinent Independent System Operator, Inc. Filed Date: 7/22/13. Accession Number: 20130722–5191. Comments Due: 5 p.m. ET 8/12/13. Docket Numbers: ER13–1747–001. Applicants: eBay Inc. Description: eBay Inc. submits Amendment to MBR Application to be effective 8/26/2013. Filed Date: 7/23/13. Accession Number: 20130723–5096. 1 FERC defines burden as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, reference 5 Code of Federal Regulations 1320.3. 2 FERC divides the responses per respondent by six because this collection occurs once every six years. 3 FY 2013 Estimated Average Hourly Cost per FTE, including salary + benefits. The total estimated annual cost burden to respondents is $35,070 [501 hours * $70/hour 3 = $35,070]. Comments: The Commission invites comments on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: July 23, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–18208 Filed 7–29–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission pmangrum on DSK3VPTVN1PROD with NOTICES Combined Notice of Filings #1 VerDate Mar<15>2010 14:32 Jul 29, 2013 Jkt 229001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\30JYN1.SGM 30JYN1

Agencies

[Federal Register Volume 78, Number 146 (Tuesday, July 30, 2013)]
[Notices]
[Pages 45919-45920]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-18208]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC13-14-000]


Commission Information Collection Activities (FERC Form 80); 
Comment Request; Extension

AGENCY: Federal Energy Regulatory Commission.

ACTION: Comment request.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, 44 U.S.C. 3507(a)(1)(D), the Federal Energy Regulatory 
Commission (Commission or FERC) is submitting the information 
collection, FERC Form 80, Licensed Hydropower Development Recreation 
Report, to the Office of Management and Budget (OMB) for review of the 
information collection requirements. Any interested person may file 
comments directly with OMB and should address a copy of those comments 
to the Commission as explained below. The Commission issued a Notice in 
the Federal Register (78 FR 28820, 5/16/2013) requesting public 
comments. FERC received no comments on the FERC Form 80 and is making 
this notation in its submittal to OMB.

DATES: Comments on the collection of information are due August 29, 
2013.

ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 
1902-0106, should be sent via email to the Office of Information and 
Regulatory Affairs: oira_submission@omb.gov. Attention: Federal Energy 
Regulatory Commission Desk Officer. The Desk Officer may also be 
reached via telephone at 202-395-4718.
    A copy of the comments should also be sent to the Federal Energy 
Regulatory Commission, identified by the Docket No. IC13-14-000, by 
either of the following methods:
     eFiling at Commission's Web site: https://www.ferc.gov/docs-filing/efiling.asp
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC Form 80, Licensed Hydropower Development Recreation 
Report.
    OMB Control No.: 1902-0106.
    Type of Request: Minor revisions to the FERC Form 80 information 
collection requirements with no change to the current reporting burden.
    Abstract: FERC uses the information on the FERC Form 80 to 
implement the statutory provisions of sections 4(a), 10(a), 301(a), 304 
and 309 of the Federal Power Act (FPA), 16 U.S.C. 797, 803, 825c & 
8254. FERC's authority to collect this information comes from section 
10(a) of the FPA which requires the Commission to be responsible for 
ensuring that hydro projects subject to FERC jurisdiction are 
consistent with the comprehensive development of the nation's waterway 
for recreation and other beneficial public uses. In the interest of 
fulfilling these objectives, FERC expects licensees subject to its 
jurisdiction to recognize the resources that are affected by their 
activities and to play a role in protecting such resources.
    FERC Form 80 is a report on the use and development of recreational 
facilities at hydropower projects licensed by the Commission. 
Applications for licenses, amendments to licenses, and/or changes in 
land rights frequently involve changes in resources available for 
recreation. FERC utilizes the FERC Form 80 data when analyzing the 
adequacy of existing public recreational facilities and when processing 
and reviewing proposed amendments to help determine the impact of such 
changes. In addition, the FERC regional office staff uses the FERC Form 
80 data when conducting inspections of licensed projects. FERC 
inspectors use the data in evaluating compliance with various license 
conditions and in identifying recreational facilities at hydropower 
projects.
    The FERC Form 80 requires data specified by Title 18 of the Code of 
Federal Regulations (CFR) under Parts 8.11 and 141.14 (and discussed at 
https://www.ferc.gov/docs-filing/forms.asp#80).
    FERC collects the FERC Form 80 once every six years. The last 
collection was due on April 1, 2009, for data compiled during the 2008 
calendar year. The next collection of the FERC Form 80 is due on April 
1, 2015, with subsequent collections due every sixth year, for data 
compiled during the previous calendar year.
    The Commission made minor revisions throughout the form. 
Specifically, FERC clarified and simplified instructions, removed 
redundancy in certain questions, clarified questions and terms, and 
generally improved the readability of the form.
    FERC has attached the revised form to this notice.

[[Page 45920]]

    Type of Respondents: Hydropower project licensees.
    Estimate of Annual Burden:\1\ For each reporting period, FERC 
estimates the total Public Reporting Burden for this information 
collection as: (a) 1,000 respondents, (b) 0.167 responses/respondent, 
and (c) 3 hours per response, giving a total of 501 burden hours. The 
Commission has increased its total number of respondents to reflect the 
actual numbers we received during the last two reporting periods. In 
addition, FERC spreads the burden hours and costs over the six-year 
collection cycle in the table below to reflect how the information is 
collected. The average burden hours per response remains unchanged. 
These are the figures FERC will submit to OMB.
---------------------------------------------------------------------------

    \1\ FERC defines burden as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, reference 5 Code of Federal Regulations 1320.3.

                           FERC-80--Licensed Hydropower Development Recreation Report
----------------------------------------------------------------------------------------------------------------
                        Number of responses      Total number of      Average burden hours     Estimated total
Number of respondents    per respondent \2\         responses             per response          annual burden
(A)                                  (B)          (A) x (B) = (C)                  (D)                      (C)
----------------------------------------------------------------------------------------------------------------
            1,000                  0.167                    167                      3                    501
----------------------------------------------------------------------------------------------------------------

    The total estimated annual cost burden to respondents is $35,070 
[501 hours * $70/hour \3\ = $35,070].
---------------------------------------------------------------------------

    \2\ FERC divides the responses per respondent by six because 
this collection occurs once every six years.
    \3\ FY 2013 Estimated Average Hourly Cost per FTE, including 
salary + benefits.
---------------------------------------------------------------------------

    Comments: The Commission invites comments on: (1) Whether the 
collection of information is necessary for the proper performance of 
the functions of the Commission, including whether the information will 
have practical utility; (2) the accuracy of the agency's estimate of 
the burden and cost of the collection of information, including the 
validity of the methodology and assumptions used; (3) ways to enhance 
the quality, utility and clarity of the information collection; and (4) 
ways to minimize the burden of the collection of information on those 
who are to respond, including the use of automated collection 
techniques or other forms of information technology.

    Dated: July 23, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-18208 Filed 7-29-13; 8:45 am]