Drawbridge Operation Regulation; Lake Washington Ship Canal, Seattle, WA, 45056 [2013-18029]
Download as PDF
45056
Federal Register / Vol. 78, No. 144 / Friday, July 26, 2013 / Rules and Regulations
Monday, July 15, 2013, make the
following correction:
On page 42326, in Table 1, the table
section beneath the heading ‘‘Scenario:
(3) Serve as an SIC (first officer) in part
121 operations’’ should read as follows:
Scenario:
(3) Serve as an SIC (first officer) in part
121 operations
Previous requirements
Requirements in final rule
Hold:
(1) At least a commercial pilot certificate with an appropriate category and class rating;
(2) An instrument rating; and
(3) At least a second-class medical certificate.
Hold:
(1) An ATP certificate with appropriate aircraft type rating OR—An
ATP certificate with restricted privileges and an appropriate aircraft
type rating; and
(2) At least a second-class medical certificate.
(Ref. §§ 121.436 and 61.23).
[FR Doc. C1–2013–16849 Filed 7–25–13; 8:45 am]
BILLING CODE 1505–01–D
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0620]
Drawbridge Operation Regulation;
Lake Washington Ship Canal, Seattle,
WA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Montlake
Bridge across the Lake Washington Ship
Canal, mile 5.2, at Seattle, WA. The
deviation is necessary to accommodate
vehicular traffic attending football
games at Husky Stadium at the
University of Washington, Seattle,
Washington. This deviation allows the
bridge to remain in the closed position
two hours before and two hours after
each game. Please note that the game
times for five of the seven games
scheduled for Husky Stadium have not
yet been determined due to NCAA
television scheduling.
DATES: This deviation is effective from
5 p.m. to 7 p.m. and 10 p.m. to 11:59
p.m. on August 31, 2013; 12:01 a.m. to
11:59 p.m. on September 21, 2013; 12:01
a.m. to 11:59 p.m. on September 28,
2013; 12:01 a.m. to 11:59 p.m. on
October 12, 2013; 12:01 a.m. to 11:59
p.m. on October 26, 2013; 12:01 a.m. to
11:59 p.m. on November 9, 2013; 10:30
a.m. to 12:30 p.m. and 3:30 p.m. to 5:30
p.m. on November 29, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0620] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
tkelley on DSK3SPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
17:30 Jul 25, 2013
Jkt 229001
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Steven M.
Fischer, Lieutenant Commander, Bridge
Specialist, Thirteenth District, Coast
Guard; telephone 206–220–7277, email
Steven.M.Fischer2@uscg.mil. If you
have questions on viewing the docket,
call Barbara Hairston, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The
Washington State Department of
Transportation, on behalf of the
University of Washington Police
Department, has requested that the
Montlake Bridge bascule span remain
closed and need not open to vessel
traffic to facilitate timely movement of
pre-game and post game football traffic.
The Montlake Bridge crosses the Lake
Washington Ship Canal at mile 5.2 and
while in the closed position provides 30
feet of vertical clearance throughout the
navigation channel and 46 feet of
vertical clearance throughout the center
60-feet of the bridge. These vertical
clearance measurements are made in
reference to the Mean Water Level of
Lake Washington. Vessels which do not
require a bridge opening may continue
to transit beneath the bridges during this
closure period. Under normal
conditions this bridge opens on signal,
subject to the list of exceptions provided
in 33 CFR 117.1051(e).
This deviation period will cover the
dates August 31, 2013 to November 29,
2013 as follows. From 5:00 p.m. to 7:00
p.m. and from 10:00 p.m. to 11:59 p.m.
on August 31, 2013; from 10:30 a.m. to
12:30 p.m. and from 3:30 p.m. to 5:30
p.m. on November 29, 2013. The times
for the closures on September 21, 2013,
September 28, 2013, October 12, 2013,
PO 00000
Frm 00006
Fmt 4700
Sfmt 9990
October 26, 2013, and November 09,
2013 will be determined and announced
in the Coast Guard’s Local Notice to
Mariners and Broadcast Notice to
Mariners as they become available. Due
to NCAA television scheduling, the
times for the games are not currently
available.
The deviation allows the bascule span
of the Montlake Bridge to remain in the
closed position and need not open for
maritime traffic from 5:00 p.m. to 7:00
p.m. and 10:00 p.m. to 11:59 p.m. on
August 31, 2013, and from 10:30 a.m. to
12:30 p.m. and 3:30 p.m. to 5:30 p.m. on
November 29, 2013, for times to be
determined on September 21, 2013,
September 28, 2013, October 12, 2013,
October 26, 2013, and November 09,
2013. The bridge shall operate in
accordance with 33 CFR 117.1051(e) at
all other times. Waterway usage on the
Lake Washington Ship Canal ranges
from commercial tug and barge to small
pleasure craft. Mariners will be notified
and kept informed of the bridge’s
operational status via the Coast Guard
Notice to Mariners publication and
Broadcast Notice to Mariners as
appropriate. The draw span will be
required to open, if needed, for vessels
engaged in emergency response
operations during this closure period.
In accordance with 33 CFR 117.35(e),
the drawbridges must return to its
regular operating schedule immediately
at the end of the designated time period.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: July 16, 2013.
Daryl R. Peloquin,
Acting Bridge Administrator, Thirteenth
Coast Guard District.
[FR Doc. 2013–18029 Filed 7–25–13; 8:45 am]
BILLING CODE 9110–04–P
E:\FR\FM\26JYR1.SGM
26JYR1
Agencies
[Federal Register Volume 78, Number 144 (Friday, July 26, 2013)]
[Rules and Regulations]
[Page 45056]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-18029]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-0620]
Drawbridge Operation Regulation; Lake Washington Ship Canal,
Seattle, WA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Montlake Bridge across the Lake
Washington Ship Canal, mile 5.2, at Seattle, WA. The deviation is
necessary to accommodate vehicular traffic attending football games at
Husky Stadium at the University of Washington, Seattle, Washington.
This deviation allows the bridge to remain in the closed position two
hours before and two hours after each game. Please note that the game
times for five of the seven games scheduled for Husky Stadium have not
yet been determined due to NCAA television scheduling.
DATES: This deviation is effective from 5 p.m. to 7 p.m. and 10 p.m. to
11:59 p.m. on August 31, 2013; 12:01 a.m. to 11:59 p.m. on September
21, 2013; 12:01 a.m. to 11:59 p.m. on September 28, 2013; 12:01 a.m. to
11:59 p.m. on October 12, 2013; 12:01 a.m. to 11:59 p.m. on October 26,
2013; 12:01 a.m. to 11:59 p.m. on November 9, 2013; 10:30 a.m. to 12:30
p.m. and 3:30 p.m. to 5:30 p.m. on November 29, 2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0620] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Steven M. Fischer, Lieutenant
Commander, Bridge Specialist, Thirteenth District, Coast Guard;
telephone 206-220-7277, email Steven.M.Fischer2@uscg.mil. If you have
questions on viewing the docket, call Barbara Hairston, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Washington State Department of
Transportation, on behalf of the University of Washington Police
Department, has requested that the Montlake Bridge bascule span remain
closed and need not open to vessel traffic to facilitate timely
movement of pre-game and post game football traffic. The Montlake
Bridge crosses the Lake Washington Ship Canal at mile 5.2 and while in
the closed position provides 30 feet of vertical clearance throughout
the navigation channel and 46 feet of vertical clearance throughout the
center 60-feet of the bridge. These vertical clearance measurements are
made in reference to the Mean Water Level of Lake Washington. Vessels
which do not require a bridge opening may continue to transit beneath
the bridges during this closure period. Under normal conditions this
bridge opens on signal, subject to the list of exceptions provided in
33 CFR 117.1051(e).
This deviation period will cover the dates August 31, 2013 to
November 29, 2013 as follows. From 5:00 p.m. to 7:00 p.m. and from
10:00 p.m. to 11:59 p.m. on August 31, 2013; from 10:30 a.m. to 12:30
p.m. and from 3:30 p.m. to 5:30 p.m. on November 29, 2013. The times
for the closures on September 21, 2013, September 28, 2013, October 12,
2013, October 26, 2013, and November 09, 2013 will be determined and
announced in the Coast Guard's Local Notice to Mariners and Broadcast
Notice to Mariners as they become available. Due to NCAA television
scheduling, the times for the games are not currently available.
The deviation allows the bascule span of the Montlake Bridge to
remain in the closed position and need not open for maritime traffic
from 5:00 p.m. to 7:00 p.m. and 10:00 p.m. to 11:59 p.m. on August 31,
2013, and from 10:30 a.m. to 12:30 p.m. and 3:30 p.m. to 5:30 p.m. on
November 29, 2013, for times to be determined on September 21, 2013,
September 28, 2013, October 12, 2013, October 26, 2013, and November
09, 2013. The bridge shall operate in accordance with 33 CFR
117.1051(e) at all other times. Waterway usage on the Lake Washington
Ship Canal ranges from commercial tug and barge to small pleasure
craft. Mariners will be notified and kept informed of the bridge's
operational status via the Coast Guard Notice to Mariners publication
and Broadcast Notice to Mariners as appropriate. The draw span will be
required to open, if needed, for vessels engaged in emergency response
operations during this closure period.
In accordance with 33 CFR 117.35(e), the drawbridges must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: July 16, 2013.
Daryl R. Peloquin,
Acting Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2013-18029 Filed 7-25-13; 8:45 am]
BILLING CODE 9110-04-P