The Bank of New York Mellon Trust Co., N.A., (Owner Trustee), EIF Haypress, LLC; Notice of Transfer of Exemption, 44107-44108 [2013-17586]
Download as PDF
Federal Register / Vol. 78, No. 141 / Tuesday, July 23, 2013 / Notices
Docket Numbers: RP13–1074–000.
Applicants: Iroquois Gas Transmission
System, L.P.
Description: 07/15/13 Negotiated
Rates—Exelon Generation Company,
LLC to be effective 7/15/2013.
Filed Date: 7/15/13.
Accession Number: 20130715–5245.
Comments Due: 5 p.m. ET 7/29/13.
Docket Numbers: RP13–1075–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: Negotiated Rate
Agreement—Sequent Energy to be
effective 7/16/2013.
Filed Date: 7/15/13.
Accession Number: 20130715–5269.
Comments Due: 5 p.m. ET 7/29/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 16, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–17624 Filed 7–22–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 6597–013–NH]
ehiers on DSK2VPTVN1PROD with NOTICES
Monadnock Paper Mills, Inc.; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR Part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for a new license for the multidevelopment Monadnock Hydroelectric
Project, located along a five-mile reach
of the Contoocook River in the towns of
VerDate Mar<15>2010
15:40 Jul 22, 2013
Jkt 229001
Peterborough, Greenfield, Hancock, and
Bennington in Hillsborough County,
New Hampshire, and has prepared an
Environmental Assessment (EA) for the
project. The project does not occupy any
federal land.
The EA contains the staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental measures, would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. You may also register
online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified
via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
For assistance, please contact FERC
Online Support. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail
comments to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426.
FOR FURTHER INFORMATION CONTACT:
Samantha Davidson at (202) 502–6839
or samantha.davidson@ferc.gov.
Dated: July 16, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–17587 Filed 7–22–13; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
44107
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6028–008]
The Bank of New York Mellon Trust
Co., N.A. (Owner Trustee) EIF
Haypress, Inc.; Notice of Transfer of
Exemption
1. By letter filed July 5, 2013, The
Bank of New York Mellon Trust Co.,
N.A. (Owner Trustee) and EIF Haypress,
Inc. informed the Commission that the
exemption from licensing for the Lower
Haypress Creek Hydroelectric Project,
FERC No. 6028, originally issued
August 6, 1982,1 has been transferred to
EIF Haypress, Inc. The project is located
on the Haypress Creek in Sierra County,
California. The transfer of an exemption
does not require Commission approval.
2. EIF Haypress, LLC, c/o Northbrook
Hydro, LLC, 14550 N Frank Lloyd
Wright Blvd., Suite 210, Scottsdale, AZ
85260, is now the exemptee of the
Lower Haypress Creek Hydroelectric
Project, FERC No. 6028.
Dated: July 16, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–17584 Filed 7–22–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6061–008]
The Bank of New York Mellon Trust
Co., N.A., (Owner Trustee), EIF
Haypress, LLC; Notice of Transfer of
Exemption
1. By letter filed July 5, 2013, The
Bank of New Mellon Trust Co., N.A.
(Owner Trustee) and EIF Haypress, LLC
informed the Commission that the
exemption from licensing for the
Haypress Creek Hydroelectric Project,
FERC No. 6061, originally issued
August 12, 1982,1 has been transferred
to EIF Haypress, Inc. The project is
located on the Haypress Creek in Sierra
County, California. The transfer of an
exemption does not require Commission
approval.
1 20 FERC ¶ 62,225, Order Granting Exemption
from Licensing of a Small Hydroelectric Project of
5 MW or Less and Denying Competing Applications
for Preliminary Permit.
1 20 FERC ¶ 62,260, Order Granting Exemption
from Licensing of a Small Hydroelectric Project of
5 MW and Denying Application for Preliminary
Permits.
E:\FR\FM\23JYN1.SGM
23JYN1
44108
Federal Register / Vol. 78, No. 141 / Tuesday, July 23, 2013 / Notices
2. EIF Haypress, LLC, c/o Northbrook
Hydro, LLC, 14550 N Frank Lloyd
Wright Blvd., Suite 210, Scottsdale, AZ
85260, is now the exemptee of the
Haypress Creek Hydroelectric Project,
FERC No. 6061.
Dated: July 16, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–17586 Filed 7–22–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Docket No. ER13–1903–000]
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: July 17, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
MET New York Trading LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2013–17609 Filed 7–22–13; 8:45 am]
BILLING CODE 6717–01–P
ehiers on DSK2VPTVN1PROD with NOTICES
July 17, 2013.
This is a supplemental notice in the
above-referenced proceeding, of MET
New York Trading LLC’s application for
market-based rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability is August 6,
2013.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
VerDate Mar<15>2010
15:40 Jul 22, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER13–1904–000]
MET West Trading LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: July 17, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–17610 Filed 7–22–13; 8:45 am]
BILLING CODE 6717–01–P
July 17, 2013.
This is a supplemental notice in the
above-referenced proceeding, of MET
West Trading LLC’s application for
market-based rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability is August 6,
2013.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER13–1988–000]
Eligo Energy NY, LLC; Supplemental
Notice that Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
July 17, 2013.
This is a supplemental notice in the
above-referenced proceeding, of Eligo
Energy NY, LLC’s application for
market-based rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
E:\FR\FM\23JYN1.SGM
23JYN1
Agencies
[Federal Register Volume 78, Number 141 (Tuesday, July 23, 2013)]
[Notices]
[Pages 44107-44108]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-17586]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6061-008]
The Bank of New York Mellon Trust Co., N.A., (Owner Trustee),
EIF Haypress, LLC; Notice of Transfer of Exemption
1. By letter filed July 5, 2013, The Bank of New Mellon Trust Co.,
N.A. (Owner Trustee) and EIF Haypress, LLC informed the Commission that
the exemption from licensing for the Haypress Creek Hydroelectric
Project, FERC No. 6061, originally issued August 12, 1982,\1\ has been
transferred to EIF Haypress, Inc. The project is located on the
Haypress Creek in Sierra County, California. The transfer of an
exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ 20 FERC ] 62,260, Order Granting Exemption from Licensing of
a Small Hydroelectric Project of 5 MW and Denying Application for
Preliminary Permits.
---------------------------------------------------------------------------
[[Page 44108]]
2. EIF Haypress, LLC, c/o Northbrook Hydro, LLC, 14550 N Frank
Lloyd Wright Blvd., Suite 210, Scottsdale, AZ 85260, is now the
---------------------------------------------------------------------------
exemptee of the Haypress Creek Hydroelectric Project, FERC No. 6061.
Dated: July 16, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-17586 Filed 7-22-13; 8:45 am]
BILLING CODE 6717-01-P