The Bank of New York Mellon Trust Co., N.A., (Owner Trustee), EIF Haypress, LLC; Notice of Transfer of Exemption, 44107-44108 [2013-17586]

Download as PDF Federal Register / Vol. 78, No. 141 / Tuesday, July 23, 2013 / Notices Docket Numbers: RP13–1074–000. Applicants: Iroquois Gas Transmission System, L.P. Description: 07/15/13 Negotiated Rates—Exelon Generation Company, LLC to be effective 7/15/2013. Filed Date: 7/15/13. Accession Number: 20130715–5245. Comments Due: 5 p.m. ET 7/29/13. Docket Numbers: RP13–1075–000. Applicants: Columbia Gas Transmission, LLC. Description: Negotiated Rate Agreement—Sequent Energy to be effective 7/16/2013. Filed Date: 7/15/13. Accession Number: 20130715–5269. Comments Due: 5 p.m. ET 7/29/13. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 16, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–17624 Filed 7–22–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 6597–013–NH] ehiers on DSK2VPTVN1PROD with NOTICES Monadnock Paper Mills, Inc.; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for a new license for the multidevelopment Monadnock Hydroelectric Project, located along a five-mile reach of the Contoocook River in the towns of VerDate Mar<15>2010 15:40 Jul 22, 2013 Jkt 229001 Peterborough, Greenfield, Hancock, and Bennington in Hillsborough County, New Hampshire, and has prepared an Environmental Assessment (EA) for the project. The project does not occupy any federal land. The EA contains the staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. Comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail comments to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. FOR FURTHER INFORMATION CONTACT: Samantha Davidson at (202) 502–6839 or samantha.davidson@ferc.gov. Dated: July 16, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–17587 Filed 7–22–13; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 44107 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6028–008] The Bank of New York Mellon Trust Co., N.A. (Owner Trustee) EIF Haypress, Inc.; Notice of Transfer of Exemption 1. By letter filed July 5, 2013, The Bank of New York Mellon Trust Co., N.A. (Owner Trustee) and EIF Haypress, Inc. informed the Commission that the exemption from licensing for the Lower Haypress Creek Hydroelectric Project, FERC No. 6028, originally issued August 6, 1982,1 has been transferred to EIF Haypress, Inc. The project is located on the Haypress Creek in Sierra County, California. The transfer of an exemption does not require Commission approval. 2. EIF Haypress, LLC, c/o Northbrook Hydro, LLC, 14550 N Frank Lloyd Wright Blvd., Suite 210, Scottsdale, AZ 85260, is now the exemptee of the Lower Haypress Creek Hydroelectric Project, FERC No. 6028. Dated: July 16, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–17584 Filed 7–22–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6061–008] The Bank of New York Mellon Trust Co., N.A., (Owner Trustee), EIF Haypress, LLC; Notice of Transfer of Exemption 1. By letter filed July 5, 2013, The Bank of New Mellon Trust Co., N.A. (Owner Trustee) and EIF Haypress, LLC informed the Commission that the exemption from licensing for the Haypress Creek Hydroelectric Project, FERC No. 6061, originally issued August 12, 1982,1 has been transferred to EIF Haypress, Inc. The project is located on the Haypress Creek in Sierra County, California. The transfer of an exemption does not require Commission approval. 1 20 FERC ¶ 62,225, Order Granting Exemption from Licensing of a Small Hydroelectric Project of 5 MW or Less and Denying Competing Applications for Preliminary Permit. 1 20 FERC ¶ 62,260, Order Granting Exemption from Licensing of a Small Hydroelectric Project of 5 MW and Denying Application for Preliminary Permits. E:\FR\FM\23JYN1.SGM 23JYN1 44108 Federal Register / Vol. 78, No. 141 / Tuesday, July 23, 2013 / Notices 2. EIF Haypress, LLC, c/o Northbrook Hydro, LLC, 14550 N Frank Lloyd Wright Blvd., Suite 210, Scottsdale, AZ 85260, is now the exemptee of the Haypress Creek Hydroelectric Project, FERC No. 6061. Dated: July 16, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–17586 Filed 7–22–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. ER13–1903–000] Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 17, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. MET New York Trading LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization [FR Doc. 2013–17609 Filed 7–22–13; 8:45 am] BILLING CODE 6717–01–P ehiers on DSK2VPTVN1PROD with NOTICES July 17, 2013. This is a supplemental notice in the above-referenced proceeding, of MET New York Trading LLC’s application for market-based rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability is August 6, 2013. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the VerDate Mar<15>2010 15:40 Jul 22, 2013 Jkt 229001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13–1904–000] MET West Trading LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 17, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–17610 Filed 7–22–13; 8:45 am] BILLING CODE 6717–01–P July 17, 2013. This is a supplemental notice in the above-referenced proceeding, of MET West Trading LLC’s application for market-based rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability is August 6, 2013. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13–1988–000] Eligo Energy NY, LLC; Supplemental Notice that Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization July 17, 2013. This is a supplemental notice in the above-referenced proceeding, of Eligo Energy NY, LLC’s application for market-based rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to E:\FR\FM\23JYN1.SGM 23JYN1

Agencies

[Federal Register Volume 78, Number 141 (Tuesday, July 23, 2013)]
[Notices]
[Pages 44107-44108]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-17586]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 6061-008]


 The Bank of New York Mellon Trust Co., N.A., (Owner Trustee), 
EIF Haypress, LLC; Notice of Transfer of Exemption

    1. By letter filed July 5, 2013, The Bank of New Mellon Trust Co., 
N.A. (Owner Trustee) and EIF Haypress, LLC informed the Commission that 
the exemption from licensing for the Haypress Creek Hydroelectric 
Project, FERC No. 6061, originally issued August 12, 1982,\1\ has been 
transferred to EIF Haypress, Inc. The project is located on the 
Haypress Creek in Sierra County, California. The transfer of an 
exemption does not require Commission approval.
---------------------------------------------------------------------------

    \1\ 20 FERC ] 62,260, Order Granting Exemption from Licensing of 
a Small Hydroelectric Project of 5 MW and Denying Application for 
Preliminary Permits.

---------------------------------------------------------------------------

[[Page 44108]]

    2. EIF Haypress, LLC, c/o Northbrook Hydro, LLC, 14550 N Frank 
Lloyd Wright Blvd., Suite 210, Scottsdale, AZ 85260, is now the 
---------------------------------------------------------------------------
exemptee of the Haypress Creek Hydroelectric Project, FERC No. 6061.

    Dated: July 16, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-17586 Filed 7-22-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.