FFP Project 131, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications, 44109-44110 [2013-17585]

Download as PDF Federal Register / Vol. 78, No. 141 / Tuesday, July 23, 2013 / Notices intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability is August 6, 2013. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 17, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–17611 Filed 7–22–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission ehiers on DSK2VPTVN1PROD with NOTICES [Docket No. ER13–1896–000] AEP Generation Resources Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of AEP Generation Resources Inc.’s application for market-based rate authority, with an accompanying rate schedule, noting that VerDate Mar<15>2010 15:40 Jul 22, 2013 Jkt 229001 such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability is August 6, 2013. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 17, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–17608 Filed 7–22–13; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 44109 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14525–000] FFP Project 131, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On May 20, 2013, FFP Project 131, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project to be located at the US Army Corps of Engineers’ (Corps) Felsenthal Lock & Dam on the Ouachita River near the town of Felsenthal in Union County, Arkansas. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 300-foot-long, 150foot-wide intake channel; (2) a 100-footlong, 150-foot-wide powerhouse containing two generating units with a total capacity of 5 megawatts; (3) a 500foot-long, 150-foot-wide tailrace; (4) a 4.16/69 kilo-Volt (kV) substation; and (5) a 1.0-mile-long, 69kV transmission line. The proposed project would have an average annual generation of 18,000 megawatt-hours, and operate as directed by the Corps. Applicant Contact: Mr. Daniel Lissner, Free Flow Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283–2822 FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202) 502– 8577. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// E:\FR\FM\23JYN1.SGM 23JYN1 44110 Federal Register / Vol. 78, No. 141 / Tuesday, July 23, 2013 / Notices www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14525) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: July 16, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–17585 Filed 7–22–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14510–000] ehiers on DSK2VPTVN1PROD with NOTICES FFP Project 124, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 2, 2013, FFP Project 124, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project to be located at the US Army Corps of Engineers’ (Corps) Red River Lock & Dam #1 on the Red River near the town of Marksville in Catahoula Parish, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 575-foot-long, 270foot-wide forebay with a 200-foot-long retaining wall; (2) a 200-foot-long, 270foot-wide powerhouse containing four generating units with a total capacity of VerDate Mar<15>2010 15:40 Jul 22, 2013 Jkt 229001 36.8 megawatts; (3) a 500-foot-long, 270foot-wide tailrace with a 200-foot-long retaining wall; (4) a 4.16/69 kilo-Volt (kV) substation; and (5) a 0.4-mile-long, 69kV transmission line. The proposed project would have an average annual generation of 163,200 megawatt-hours, and operate as directed by the Corps. Applicant Contact: Mr. Daniel Lissner, Free Flow Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283–2822. FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202) 502– 8577. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14510) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: July 16, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–17591 Filed 7–22–13; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14523–000] FFP Project 130, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On May 20, 2013, FFP Project 130, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project to be located at the US Army Corps of Engineers’ (Corps) Jonesville Lock & Dam on the Black River near the town of Jonesville in Catahoula Parish, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 400-foot-long, 110foot-wide intake channel; (2) a 90-footlong, 110-foot-wide powerhouse containing three generating units with a total capacity of 6 megawatts; (3) a 400foot-long, 110-foot-wide tailrace; (4) a 4.16/69 kilo-Volt (kV) substation; and (5) a 10-mile-long, 69kV transmission line. The proposed project would have an average annual generation of 47,000 megawatt-hours, and operate as directed by the Corps. Applicant Contact: Mr. Daniel Lissner, Free Flow Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283–2822 FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202) 502– 8577. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// E:\FR\FM\23JYN1.SGM 23JYN1

Agencies

[Federal Register Volume 78, Number 141 (Tuesday, July 23, 2013)]
[Notices]
[Pages 44109-44110]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-17585]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14525-000]


 FFP Project 131, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions to Intervene, and 
Competing Applications

    On May 20, 2013, FFP Project 131, LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of a hydropower project to be 
located at the US Army Corps of Engineers' (Corps) Felsenthal Lock & 
Dam on the Ouachita River near the town of Felsenthal in Union County, 
Arkansas. The sole purpose of a preliminary permit, if issued, is to 
grant the permit holder priority to file a license application during 
the permit term. A preliminary permit does not authorize the permit 
holder to perform any land-disturbing activities or otherwise enter 
upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) A 300-
foot-long, 150-foot-wide intake channel; (2) a 100-foot-long, 150-foot-
wide powerhouse containing two generating units with a total capacity 
of 5 megawatts; (3) a 500-foot-long, 150-foot-wide tailrace; (4) a 
4.16/69 kilo-Volt (kV) substation; and (5) a 1.0-mile-long, 69kV 
transmission line. The proposed project would have an average annual 
generation of 18,000 megawatt-hours, and operate as directed by the 
Corps.
    Applicant Contact: Mr. Daniel Lissner, Free Flow Power Corporation, 
239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283-2822
    FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202) 
502-8577.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://

[[Page 44110]]

www.ferc.gov/docs-filing/ecomment.asp. You must include your name and 
contact information at the end of your comments. For assistance, please 
contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free 
at 1-866-208-3676, or for TTY, (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and five copies to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14525) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: July 16, 2013.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2013-17585 Filed 7-22-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.