Sunshine Act Meeting, 42560 [2013-17124]

Download as PDF 42560 Federal Register / Vol. 78, No. 136 / Tuesday, July 16, 2013 / Notices exclusions—were intended to apply to every NRC action that substantially changes the expectations of current and future applicants. The exceptions to the general principle are applicable whenever an applicant references a 10 CFR part 52 license (e.g., an early site permit) and/or NRC regulatory approval (e.g., a design certification rule) with specified issue finality provisions. The NRC staff does not, at this time, intend to impose the positions represented in the draft SRP in a manner that is inconsistent with any issue finality provisions. If, in the future, the staff seeks to impose a position in the draft SRP in a manner that does not provide issue finality as described in the applicable issue finality provision, then the staff must address the criteria for avoiding issue finality as described in the applicable issue finality provision. Dated at Rockville, Maryland, this 27th day of June 2013. For the Nuclear Regulatory Commission. Joseph Colaccino, Chief, Policy Branch, Division of Advanced Reactors and Rulemaking, Office of New Reactors. [FR Doc. 2013–16985 Filed 7–15–13; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [NRC–2013–0001] Sunshine Act Meeting AGENCY HOLDING THE MEETINGS: Nuclear Regulatory Commission. DATES: Weeks of July 15, 22, 29, August 5, 12, 19, 2013. PLACE: Commissioners’ Conference Room, 11555 Rockville Pike, Rockville, Maryland. STATUS: Public and Closed. Week of July 15, 2013 There are no meetings scheduled for the week of July 15, 2013. Week of July 22, 2013—Tentative There are no meetings scheduled for the week of July 22, 2013. emcdonald on DSK67QTVN1PROD with NOTICES Week of July 29, 2013—Tentative Week of August 19, 2013—Tentative There are no meetings scheduled for the week of August 19, 2013. * * * * * *The schedule for Commission meetings is subject to change on short notice. To verify the status of meetings, call (recording)—301–415–1292. Contact person for more information: Rochelle Bavol, 301–415–1651. * * * * * I Korea Hydro and Nuclear Power, Co., Ltd. (KHNP) submitted a letter of intent to the U.S. Nuclear Regulatory Commission (NRC) for a design certification (DC) application in 2013. In June 2009, the Commission published a rulemaking in the Federal Register (FR) (74 FR 28112) requiring applicants for a variety of licensing activities, including nuclear power plant designers, to perform a designspecific assessment of the effects of the impact of a large, commercial aircraft and to incorporate design features and functional capabilities into the nuclear power plant design to provide additional inherent protection with reduced use of operator actions. A discussion of the specific requirements for applicants for new nuclear power reactors can be found in Section V of the Federal Register notice. To assist designers in completing this assessment, the Commission has decided to provide the detailed aircraft impact characteristics that should be used as reasonable inputs for reactor vendors and architect and engineers who have the need to know and who meet the NRC’s requirements for the disclosure of such information to use in the required aircraft impact assessments. The NRC derived the characteristics from agency analyses performed on operating reactors to support, in part, the development of a broadly effective set of mitigation strategies to combat fires and explosions from a spectrum of hypothetical aircraft impacts. Although the detailed characteristics were not selected as a basis for designing new reactors, the staff is suggesting them as a starting point for aircraft impact assessments. On August 5, 2011, the NRC issued Regulatory Guide (RG) 1.217, ‘‘Guidance for the Assessment of Beyond-Design-Basis Aircraft Impacts,’’ (NRC’s Agencywide Documents Access and Management System (ADAMS) Accession No. ML092900004), which endorses the methodologies described in the industry guidance document, Nuclear Energy Institute (NEI) 07–13, Week of August 5, 2013—Tentative [FR Doc. 2013–17124 Filed 7–12–13; 4:15 pm] There are no meetings scheduled for the week of August 5, 2013. BILLING CODE 7590–01–P Week of August 12, 2013—Tentative There are no meetings scheduled for the week of August 12, 2013. Jkt 229001 In the Matter of Korea Hydro and Nuclear Power, Co., Ltd. and All Other Persons Who Seek or Obtain Access to Safeguards Information Described Herein; Order Imposing Protection Requirements for Access to Safeguards Information (Effective Immediately) By a vote of 5–0 on July 10, 2013, the Commission determined pursuant to U.S.C. 552b(e) and ’9.107(a) of the Commission’s rules that a Discussion of Management and Personnel Issues (Closed—Ex. 2 & 6) be held on July 11, 2013, with less than one week notice to the public. The meeting was held on July 11, 2013. * * * * * The NRC Commission Meeting Schedule can be found on the Internet at: https://www.nrc.gov/public-involve/ public-meetings/schedule.html. * * * * * The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in these public meetings, or need this meeting notice or the transcript or other information from the public meetings in another format (e.g. braille, large print), please notify Kimberly Meyer, NRC Disability Program Manager, at 301–287–0727, or by email at kimberly.meyerchambers@nrc.gov. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. * * * * * This notice is distributed electronically to subscribers. If you no longer wish to receive it, or would like to be added to the distribution, please contact the Office of the Secretary, Washington, DC 20555 (301–415–1969), or send an email to darlene.wright@nrc.gov. Dated: July 11, 2013. Rochelle C. Bavol, Policy Coordinator, Office of the Secretary. 18:49 Jul 15, 2013 [NRC–2013–0152] [EA–13–033; Project No. 0782] Additional Information There are no meetings scheduled for the week of July 29, 2013. VerDate Mar<15>2010 NUCLEAR REGULATORY COMMISSION PO 00000 Frm 00075 Fmt 4703 Sfmt 4703 E:\FR\FM\16JYN1.SGM 16JYN1

Agencies

[Federal Register Volume 78, Number 136 (Tuesday, July 16, 2013)]
[Notices]
[Page 42560]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-17124]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2013-0001]


Sunshine Act Meeting

AGENCY HOLDING THE MEETINGS: Nuclear Regulatory Commission.

DATES: Weeks of July 15, 22, 29, August 5, 12, 19, 2013.

PLACE: Commissioners' Conference Room, 11555 Rockville Pike, Rockville, 
Maryland.

STATUS: Public and Closed.

Week of July 15, 2013

    There are no meetings scheduled for the week of July 15, 2013.

Week of July 22, 2013--Tentative

    There are no meetings scheduled for the week of July 22, 2013.

Week of July 29, 2013--Tentative

    There are no meetings scheduled for the week of July 29, 2013.

Week of August 5, 2013--Tentative

    There are no meetings scheduled for the week of August 5, 2013.

Week of August 12, 2013--Tentative

    There are no meetings scheduled for the week of August 12, 2013.

Week of August 19, 2013--Tentative

    There are no meetings scheduled for the week of August 19, 2013.
* * * * *
    *The schedule for Commission meetings is subject to change on short 
notice. To verify the status of meetings, call (recording)--301-415-
1292. Contact person for more information: Rochelle Bavol, 301-415-
1651.
* * * * *

Additional Information

    By a vote of 5-0 on July 10, 2013, the Commission determined 
pursuant to U.S.C. 552b(e) and '9.107(a) of the Commission's rules that 
a Discussion of Management and Personnel Issues (Closed--Ex. 2 & 6) be 
held on July 11, 2013, with less than one week notice to the public. 
The meeting was held on July 11, 2013.
* * * * *
    The NRC Commission Meeting Schedule can be found on the Internet 
at: https://www.nrc.gov/public-involve/public-meetings/schedule.html.
* * * * *
    The NRC provides reasonable accommodation to individuals with 
disabilities where appropriate. If you need a reasonable accommodation 
to participate in these public meetings, or need this meeting notice or 
the transcript or other information from the public meetings in another 
format (e.g. braille, large print), please notify Kimberly Meyer, NRC 
Disability Program Manager, at 301-287-0727, or by email at 
kimberly.meyer-chambers@nrc.gov. Determinations on requests for 
reasonable accommodation will be made on a case-by-case basis.
* * * * *
    This notice is distributed electronically to subscribers. If you no 
longer wish to receive it, or would like to be added to the 
distribution, please contact the Office of the Secretary, Washington, 
DC 20555 (301-415-1969), or send an email to darlene.wright@nrc.gov.

    Dated: July 11, 2013.
Rochelle C. Bavol,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2013-17124 Filed 7-12-13; 4:15 pm]
BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.