Notice of Complaint; Chevron Products Company v. Enterprise TE Products Pipeline Company, LLC, 42061-42062 [2013-16804]

Download as PDF Federal Register / Vol. 78, No. 135 / Monday, July 15, 2013 / Notices Among NYISO, NYPA, and Marble River to be effective 6/19/2013. Filed Date: 7/8/13. Accession Number: 20130708–5086. Comments Due: 5 p.m. e.t. 7/29/13. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the Docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 8, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–16834 Filed 7–12–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission tkelley on DSK3SPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER13–1895–001. Applicants: Midcontinent Independent System Operator, Inc. Description: 07–04–2013 CFTC Amendment Filing to be effective 9/2/2013. Filed Date: 7/5/13. Accession Number: 20130705–5000. Comments Due: 5 p.m. e.t. 7/26/13. Docket Numbers: ER13–1891–000. Applicants: Twin Buttes Wind LLC, Pacific Wind Development, LLC, Colorado Green Holdings LLC. Description: Feeder Line Ownership Agreement to be effective 7/4/2013. Filed Date: 7/3/13. Accession Number: 20130703–5109. Comments Due: 5 p.m. e.t. 7/24/13. Docket Numbers: ER13–1892–000. Applicants: Pacific Wind Development, LLC. Description: Feeder Line Ownership Agreement to be effective 7/4/2013. Filed Date: 7/3/13. VerDate Mar<15>2010 17:55 Jul 12, 2013 Jkt 229001 Accession Number: 20130703–5112. Comments Due: 5 p.m. e.t. 7/24/13. Docket Numbers: ER13–1893–000. Applicants: Twin Buttes Wind LLC. Description: Feeder Line Ownership Agreement to be effective 7/4/2013. Filed Date: 7/3/13. Accession Number: 20130703–5113. Comments Due: 5 p.m. e.t. 7/24/13. Docket Numbers: ER13–1894–000. Applicants: Southern California Edison Company. Description: Amended Serv Agmt with San Gorgonio Farms for DeversMirage Project to be effective 6/1/2013. Filed Date: 7/3/13. Accession Number: 20130703–5125. Comments Due: 5 p.m. e.t. 7/24/13. Docket Numbers: ER13–1895–000. Applicants: Midcontinent Independent System Operator, Inc. Description: 07–03–2013 CFTC Filing to be effective 9/2/2013. Filed Date: 7/3/13. Accession Number: 20130703–5143. Comments Due: 5 p.m. e.t. 7/24/13. Docket Numbers: ER13–1896–000. Applicants: AEP Generation Resources Inc. Description: Application of AEP Generation Resources Inc. for MarketBased Rate Authority to be effective 1/1/2014. Filed Date: 7/5/13. Accession Number: 20130705–5033. Comments Due: 5 p.m. e.t. 7/26/13. Docket Numbers: ER13–1897–000. Applicants: SWG Arapahoe, LLC. Description: Notice of Succession to be effective 7/6/2013. Filed Date: 7/5/13. Accession Number: 20130705–5038. Comments Due: 5 p.m. e.t. 7/26/13. Docket Numbers: ER13–1898–000. Applicants: ITC Midwest LLC. Description: Filing of Joint Use Pole Agreement with Grundy County to be effective 9/4/2013. Filed Date: 7/5/13. Accession Number: 20130705–5042. Comments Due: 5 p.m. e.t. 7/26/13. Docket Numbers: ER13–1899–000. Applicants: Southern California Edison Company. Description: IFA and Distribution Service Agreement with Dillon Wind to be effective 6/1/2013. Filed Date: 7/5/13. Accession Number: 20130705–5065. Comments Due: 5 p.m. e.t. 7/26/13. Docket Numbers: ER13–1900–000. Applicants: Southern California Edison Company. Description: IFA and Distribution Service Agreement with Wildflower Energy to be effective 6/1/2013. Filed Date: 7/5/13. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 42061 Accession Number: 20130705–5075. Comments Due: 5 p.m. e.t. 7/26/13. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the Docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 8, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–16833 Filed 7–12–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR13–26–000] Notice of Complaint; Chevron Products Company v. Enterprise TE Products Pipeline Company, LLC Take notice that on July 3, 2013, pursuant to sections 13(1), 15(1) and 16(1) of the Interstate Commerce Act (ICA), 49 USC app. 8, 13(1), 15(1), and 16(1), Rule 206 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (Commission), 18 CFR 385.206, and Rules 343.1(a) and 343.2(c) of the Commission’s Procedural Rules Applicable to Oil Pipeline Proceedings, 18 CFR 343.1(a) and 343.2(c), Chevron Products Company (Complainant) filed a formal complaint against Enterprise TE Products Pipeline Company, LLC (Respondent) challenging the lawfulness of the Respondent’s FERC Tariff No. 55.28.0. Specifically, the Complainant alleges that Tariff 55.28.0, in providing that Respondent will no longer accept nominations for the transportation of distillates, violates the Settlement Agreement signed by the Respondent in E:\FR\FM\15JYN1.SGM 15JYN1 42062 Federal Register / Vol. 78, No. 135 / Monday, July 15, 2013 / Notices Docket No. IS12–203–000 and approved by the Commission on May 31, 2013.1 The Complainant certifies that copies of the complaint were served on the persons listed as the Issuer and Compiler of the Respondent’s Tariff No. 55.28.0. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on July 15, 2013. Dated: July 5, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–16804 Filed 7–12–13; 8:45 am] tkelley on DSK3SPTVN1PROD with NOTICES BILLING CODE 6717–01–P 1 Enterprise TE Products Pipeline Company LLC, 143 FERC ¶ 61,197 (2013). VerDate Mar<15>2010 17:55 Jul 12, 2013 Jkt 229001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13–477–000] Columbia Gas Transmission, LLC; Notice of Intent to Prepare an Environmental Assessment and Request for Comments on Environmental Issues for the Proposed Smithfield III Expansion Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Smithfield III Expansion Project (Project) involving construction and operation of aboveground facilities by Columbia Gas Transmission, LLC (Columbia) in Greene and Washington Counties, Pennsylvania; and Monongalia, Wetzel, Gilmer, Roane, and Kanawha Counties, West Virginia. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Please note that the scoping period will close on August 7, 2013. Comments on the Project may be submitted in written form or electronically, as described in the Public Participation section of this notice. This notice is being sent to the Commission’s current environmental mailing for this Project. State and local government representatives are asked to notify their constituents of this proposed Project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the Commission approves the project, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. Columbia provided landowners with a fact sheet prepared by the FERC PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’. This fact sheet addresses a number of typically-asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC Web site (www.ferc.gov). Summary of the Proposed Project Columbia states that the Project would increase its transportation capacity by 444 MDth per day. The Project would consist of the following facilities: • New compressor station (Redd Farm Compressor Station) on Columbia’s existing Line 1570 in Washington County, PA. • Modifications at the Hero-Jollytown Valve Setting which would involve a new regulation setting; • Modifications to the Smithfield Compressor Station consisting of upgrades to the existing reciprocating engine/compressor building ventilation systems, existing gas coolers, and installation of new gas coolers; • Modifications to the Glenville Compressor Station by installing two gas-fired turbines, each rated at 7,800 horsepower (HP), and other auxiliary equipment; and • Modifications at the Pigeon Valve Setting by removing and replacing the crossover piping and valve to enable gas to flow south. The general location of the Project facilities is shown in Appendix 1.1 Land Requirements for Construction Construction of the proposed facilities would disturb about 17.6 acres of land including the temporary workspace areas for all aboveground facility sites. With the exception of the construction of the Redd Farm compressor Station, Columbia would utilize areas within the fenced boundaries of the existing facilities for materials staging and construction activities, or previously cleared land immediately adjacent to these facilities. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. E:\FR\FM\15JYN1.SGM 15JYN1

Agencies

[Federal Register Volume 78, Number 135 (Monday, July 15, 2013)]
[Notices]
[Pages 42061-42062]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-16804]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. OR13-26-000]


Notice of Complaint; Chevron Products Company v. Enterprise TE 
Products Pipeline Company, LLC

    Take notice that on July 3, 2013, pursuant to sections 13(1), 15(1) 
and 16(1) of the Interstate Commerce Act (ICA), 49 USC app. 8, 13(1), 
15(1), and 16(1), Rule 206 of the Rules of Practice and Procedure of 
the Federal Energy Regulatory Commission (Commission), 18 CFR 385.206, 
and Rules 343.1(a) and 343.2(c) of the Commission's Procedural Rules 
Applicable to Oil Pipeline Proceedings, 18 CFR 343.1(a) and 343.2(c), 
Chevron Products Company (Complainant) filed a formal complaint against 
Enterprise TE Products Pipeline Company, LLC (Respondent) challenging 
the lawfulness of the Respondent's FERC Tariff No. 55.28.0. 
Specifically, the Complainant alleges that Tariff 55.28.0, in providing 
that Respondent will no longer accept nominations for the 
transportation of distillates, violates the Settlement Agreement signed 
by the Respondent in

[[Page 42062]]

Docket No. IS12-203-000 and approved by the Commission on May 31, 
2013.\1\
---------------------------------------------------------------------------

    \1\ Enterprise TE Products Pipeline Company LLC, 143 FERC ] 
61,197 (2013).
---------------------------------------------------------------------------

    The Complainant certifies that copies of the complaint were served 
on the persons listed as the Issuer and Compiler of the Respondent's 
Tariff No. 55.28.0.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on July 15, 2013.

    Dated: July 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-16804 Filed 7-12-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.