Notice of Complaint; Chevron Products Company v. Enterprise TE Products Pipeline Company, LLC, 42061-42062 [2013-16804]
Download as PDF
Federal Register / Vol. 78, No. 135 / Monday, July 15, 2013 / Notices
Among NYISO, NYPA, and Marble
River to be effective 6/19/2013.
Filed Date: 7/8/13.
Accession Number: 20130708–5086.
Comments Due: 5 p.m. e.t. 7/29/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
Docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 8, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–16834 Filed 7–12–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
tkelley on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1895–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 07–04–2013 CFTC
Amendment Filing to be effective
9/2/2013.
Filed Date: 7/5/13.
Accession Number: 20130705–5000.
Comments Due: 5 p.m. e.t. 7/26/13.
Docket Numbers: ER13–1891–000.
Applicants: Twin Buttes Wind LLC,
Pacific Wind Development, LLC,
Colorado Green Holdings LLC.
Description: Feeder Line Ownership
Agreement to be effective 7/4/2013.
Filed Date: 7/3/13.
Accession Number: 20130703–5109.
Comments Due: 5 p.m. e.t. 7/24/13.
Docket Numbers: ER13–1892–000.
Applicants: Pacific Wind
Development, LLC.
Description: Feeder Line Ownership
Agreement to be effective 7/4/2013.
Filed Date: 7/3/13.
VerDate Mar<15>2010
17:55 Jul 12, 2013
Jkt 229001
Accession Number: 20130703–5112.
Comments Due: 5 p.m. e.t. 7/24/13.
Docket Numbers: ER13–1893–000.
Applicants: Twin Buttes Wind LLC.
Description: Feeder Line Ownership
Agreement to be effective 7/4/2013.
Filed Date: 7/3/13.
Accession Number: 20130703–5113.
Comments Due: 5 p.m. e.t. 7/24/13.
Docket Numbers: ER13–1894–000.
Applicants: Southern California
Edison Company.
Description: Amended Serv Agmt
with San Gorgonio Farms for DeversMirage Project to be effective 6/1/2013.
Filed Date: 7/3/13.
Accession Number: 20130703–5125.
Comments Due: 5 p.m. e.t. 7/24/13.
Docket Numbers: ER13–1895–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 07–03–2013 CFTC Filing
to be effective 9/2/2013.
Filed Date: 7/3/13.
Accession Number: 20130703–5143.
Comments Due: 5 p.m. e.t. 7/24/13.
Docket Numbers: ER13–1896–000.
Applicants: AEP Generation
Resources Inc.
Description: Application of AEP
Generation Resources Inc. for MarketBased Rate Authority to be effective
1/1/2014.
Filed Date: 7/5/13.
Accession Number: 20130705–5033.
Comments Due: 5 p.m. e.t. 7/26/13.
Docket Numbers: ER13–1897–000.
Applicants: SWG Arapahoe, LLC.
Description: Notice of Succession to
be effective 7/6/2013.
Filed Date: 7/5/13.
Accession Number: 20130705–5038.
Comments Due: 5 p.m. e.t. 7/26/13.
Docket Numbers: ER13–1898–000.
Applicants: ITC Midwest LLC.
Description: Filing of Joint Use Pole
Agreement with Grundy County to be
effective 9/4/2013.
Filed Date: 7/5/13.
Accession Number: 20130705–5042.
Comments Due: 5 p.m. e.t. 7/26/13.
Docket Numbers: ER13–1899–000.
Applicants: Southern California
Edison Company.
Description: IFA and Distribution
Service Agreement with Dillon Wind to
be effective 6/1/2013.
Filed Date: 7/5/13.
Accession Number: 20130705–5065.
Comments Due: 5 p.m. e.t. 7/26/13.
Docket Numbers: ER13–1900–000.
Applicants: Southern California
Edison Company.
Description: IFA and Distribution
Service Agreement with Wildflower
Energy to be effective 6/1/2013.
Filed Date: 7/5/13.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
42061
Accession Number: 20130705–5075.
Comments Due: 5 p.m. e.t. 7/26/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
Docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 8, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–16833 Filed 7–12–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR13–26–000]
Notice of Complaint; Chevron
Products Company v. Enterprise TE
Products Pipeline Company, LLC
Take notice that on July 3, 2013,
pursuant to sections 13(1), 15(1) and
16(1) of the Interstate Commerce Act
(ICA), 49 USC app. 8, 13(1), 15(1), and
16(1), Rule 206 of the Rules of Practice
and Procedure of the Federal Energy
Regulatory Commission (Commission),
18 CFR 385.206, and Rules 343.1(a) and
343.2(c) of the Commission’s Procedural
Rules Applicable to Oil Pipeline
Proceedings, 18 CFR 343.1(a) and
343.2(c), Chevron Products Company
(Complainant) filed a formal complaint
against Enterprise TE Products Pipeline
Company, LLC (Respondent)
challenging the lawfulness of the
Respondent’s FERC Tariff No. 55.28.0.
Specifically, the Complainant alleges
that Tariff 55.28.0, in providing that
Respondent will no longer accept
nominations for the transportation of
distillates, violates the Settlement
Agreement signed by the Respondent in
E:\FR\FM\15JYN1.SGM
15JYN1
42062
Federal Register / Vol. 78, No. 135 / Monday, July 15, 2013 / Notices
Docket No. IS12–203–000 and approved
by the Commission on May 31, 2013.1
The Complainant certifies that copies
of the complaint were served on the
persons listed as the Issuer and
Compiler of the Respondent’s Tariff No.
55.28.0.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 15, 2013.
Dated: July 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–16804 Filed 7–12–13; 8:45 am]
tkelley on DSK3SPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
1 Enterprise TE Products Pipeline Company LLC,
143 FERC ¶ 61,197 (2013).
VerDate Mar<15>2010
17:55 Jul 12, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–477–000]
Columbia Gas Transmission, LLC;
Notice of Intent to Prepare an
Environmental Assessment and
Request for Comments on
Environmental Issues for the Proposed
Smithfield III Expansion Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Smithfield III Expansion Project
(Project) involving construction and
operation of aboveground facilities by
Columbia Gas Transmission, LLC
(Columbia) in Greene and Washington
Counties, Pennsylvania; and
Monongalia, Wetzel, Gilmer, Roane, and
Kanawha Counties, West Virginia. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on August 7,
2013.
Comments on the Project may be
submitted in written form or
electronically, as described in the Public
Participation section of this notice. This
notice is being sent to the Commission’s
current environmental mailing for this
Project. State and local government
representatives are asked to notify their
constituents of this proposed Project
and encourage them to comment on
their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
Columbia provided landowners with
a fact sheet prepared by the FERC
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’. This fact sheet addresses a
number of typically-asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC Web
site (www.ferc.gov).
Summary of the Proposed Project
Columbia states that the Project
would increase its transportation
capacity by 444 MDth per day.
The Project would consist of the
following facilities:
• New compressor station (Redd
Farm Compressor Station) on
Columbia’s existing Line 1570 in
Washington County, PA.
• Modifications at the Hero-Jollytown
Valve Setting which would involve a
new regulation setting;
• Modifications to the Smithfield
Compressor Station consisting of
upgrades to the existing reciprocating
engine/compressor building ventilation
systems, existing gas coolers, and
installation of new gas coolers;
• Modifications to the Glenville
Compressor Station by installing two
gas-fired turbines, each rated at 7,800
horsepower (HP), and other auxiliary
equipment; and
• Modifications at the Pigeon Valve
Setting by removing and replacing the
crossover piping and valve to enable gas
to flow south.
The general location of the Project
facilities is shown in Appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 17.6 acres of land
including the temporary workspace
areas for all aboveground facility sites.
With the exception of the construction
of the Redd Farm compressor Station,
Columbia would utilize areas within the
fenced boundaries of the existing
facilities for materials staging and
construction activities, or previously
cleared land immediately adjacent to
these facilities.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
E:\FR\FM\15JYN1.SGM
15JYN1
Agencies
[Federal Register Volume 78, Number 135 (Monday, July 15, 2013)]
[Notices]
[Pages 42061-42062]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-16804]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR13-26-000]
Notice of Complaint; Chevron Products Company v. Enterprise TE
Products Pipeline Company, LLC
Take notice that on July 3, 2013, pursuant to sections 13(1), 15(1)
and 16(1) of the Interstate Commerce Act (ICA), 49 USC app. 8, 13(1),
15(1), and 16(1), Rule 206 of the Rules of Practice and Procedure of
the Federal Energy Regulatory Commission (Commission), 18 CFR 385.206,
and Rules 343.1(a) and 343.2(c) of the Commission's Procedural Rules
Applicable to Oil Pipeline Proceedings, 18 CFR 343.1(a) and 343.2(c),
Chevron Products Company (Complainant) filed a formal complaint against
Enterprise TE Products Pipeline Company, LLC (Respondent) challenging
the lawfulness of the Respondent's FERC Tariff No. 55.28.0.
Specifically, the Complainant alleges that Tariff 55.28.0, in providing
that Respondent will no longer accept nominations for the
transportation of distillates, violates the Settlement Agreement signed
by the Respondent in
[[Page 42062]]
Docket No. IS12-203-000 and approved by the Commission on May 31,
2013.\1\
---------------------------------------------------------------------------
\1\ Enterprise TE Products Pipeline Company LLC, 143 FERC ]
61,197 (2013).
---------------------------------------------------------------------------
The Complainant certifies that copies of the complaint were served
on the persons listed as the Issuer and Compiler of the Respondent's
Tariff No. 55.28.0.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. The Respondent's
answer and all interventions, or protests must be filed on or before
the comment date. The Respondent's answer, motions to intervene, and
protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on July 15, 2013.
Dated: July 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-16804 Filed 7-12-13; 8:45 am]
BILLING CODE 6717-01-P