Notice of Availability of Environmental Assessment, 41056-41057 [2013-16322]

Download as PDF 41056 Federal Register / Vol. 78, No. 131 / Tuesday, July 9, 2013 / Notices Accession Number: 20130614–5170. Comments Due: 5 p.m. ET 7/11/13. Docket Numbers: ER13–1858–000. Applicants: California Independent System Operator Corporation. Description: 2013–06– 28_CDWR_PLA_9 to be effective 7/1/ 2013. Filed Date: 6/28/13. Accession Number: 20130628–5232. Comments Due: 5 p.m. ET 7/19/13. Docket Numbers: ER13–1859–000. Applicants: PJM Interconnection, L.L.C. Description: Ministerial Clean-Up Filing re PJM OATT Att DD 5.10 due to Overlapping Filings to be effective 7/1/ 2013. Filed Date: 6/28/13. Accession Number: 20130628–5233. Comments Due: 5 p.m. ET 7/19/13. Docket Numbers: ER13–1860–000. Applicants: Nevada Power Company. Description: Rate Scehdule No. 137 Transmission Service Agreement— Cargill Power Markets to be effective 1/ 1/2016. Filed Date: 6/28/13. Accession Number: 20130628–5234. Comments Due: 5 p.m. ET 7/19/13. Docket Numbers: ER13–1861–000. Applicants: Salinas River Cogeneration Company. Description: Triennial Market Power Analysis for the Southwest Region to be effective 6/29/2013. Filed Date: 6/28/13. Accession Number: 20130628–5244. Comments Due: 5 p.m. ET 8/27/13. Docket Numbers: ER13–1862–000. Applicants: Southwest Power Pool, Inc. Description: 1166R18 Oklahoma Municipal Power Authority NITSA and NOA to be effective 6/1/2013. Filed Date: 6/28/13. Accession Number: 20130628–5248. Comments Due: 5 p.m. ET 7/19/13. Docket Numbers: ER13–1863–000. Applicants: Entergy Arkansas, Inc. Description: LEPA 2nd Rev. NITSA to be effective 6/1/2013. Filed Date: 6/28/13. Accession Number: 20130628–5250. Comments Due: 5 p.m. ET 7/19/13. Docket Numbers: ER13–1864–000. Applicants: Southwest Power Pool, Inc. Description: JOA Market-to-Market Compliance from Docket No. ER12– 1179 to be effective 12/31/9998. Filed Date: 6/28/13. Accession Number: 20130628–5265. Comments Due: 5 p.m. ET 7/19/13. Docket Numbers: ER13–1865–000. Applicants: Tesoro Refining & Marketing Company LLC. Description: Wholesale MBR Tariff Filing to be effective 7/30/2013. Filed Date: 6/28/13. Accession Number: 20130628–5273. Comments Due: 5 p.m. ET 7/19/13. Docket Numbers: ER13–1866–000. Applicants: San Diego Gas & Electric Company. Description: SDGE TO Appendix X Formula Modification to be effective 7/ 1/2013. Filed Date: 6/28/13. Accession Number: 20130628–5276. Comments Due: 5 p.m. ET 7/19/13. Take notice that the Commission received the following qualifying facility filings: Docket Numbers: QF13–532–000. Applicants: Verizon Corporate Services Group Inc. Description: Form 556 of Verizon Corporate Services Group Inc. Filed Date: 6/27/13. Accession Number: 20130627–5059. Comments Due: None Applicable. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 1, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–16446 Filed 7–8–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Availability of Environmental Assessment mstockstill on DSK4VPTVN1PROD with NOTICES BOST5 Hydroelectric LLC ............................................................................................................................................. BOST4 Hydroelectric LLC ............................................................................................................................................. BOST3 Hydroelectric LLC ............................................................................................................................................. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission (Commission or FERC) regulations, 18 Code of Federal Regulations (CFR). Part 380 (Order No. 486, 52 Federal Register 47897), the Office of Energy Projects has reviewed the applications for original licenses for the Red River Lock and Dam No. 5 Hydroelectric Project (FERC Project No. 12758–004), Red River Lock and Dam No. 4 Hydroelectric Project (FERC Project No. 12757–004), and Red River Lock and Dam No. 3 Hydroelectric Project (FERC Project No. 12756–003). The proposed projects would be located on the Red River in Louisiana. The Lock and Dam No. 5 Project would be located VerDate Mar<15>2010 17:44 Jul 08, 2013 Jkt 229001 in Bossier Parish, near the Town of Ninock, Louisiana, at the U.S. Army Corps of Engineers’ (Corps) Lock and Dam No. 5 at river mile (RM) 200 and would occupy 69.9 acres of federal lands managed by the Corps. The Lock and Dam No. 4 Project would be located in Red River Parish, near the Town of Coushatta, Louisiana, at the Corps’ Lock and Dam No. 4 at RM 168.5 and would occupy 135.1 acres of federal lands managed by the Corps. The Lock and Dam No. 3 Project would be located in Natchitoches Parish, near the Town of Colfax, Louisiana, at the Corps’ Lock and Dam No. 3 at RM 116.5 and would occupy 60.2 acres of federal lands managed by the Corps. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 Project No. 12758–004 Project No. 12757–004 Project No. 12756–003 Staff prepared a multi-project environmental assessment (EA), which analyzes the potential environmental effects of licensing the three projects, and concludes that licensing the projects, with appropriate environmental protection measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits, in the docket number field to access the document. For assistance, contact FERC Online E:\FR\FM\09JYN1.SGM 09JYN1 Federal Register / Vol. 78, No. 131 / Tuesday, July 9, 2013 / Notices Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the issuance date of this notice. Comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please affix ‘‘Red River Lock and Dam No. 5 Hydroelectric Project No. 12758– 004, Red River Lock and Dam Hydroelectric Project No. 4 No. 12757– 004, and/or Red River Lock and Dam No. 3 Hydroelectric Project No. 12756– 003’’ as appropriate to all comments. For further information, contact Jeanne Edwards at (202) 502–6181, or by email at jeanne.edwards@ferc.gov. Dated: June 28, 2013. Kimberly D. Bose, Secretary. amendment of license for the Twin Falls Hydroelectric Project (FERC Project No. 11831) and has prepared an environmental assessment (EA) in cooperation with the U.S. Army Corps of Engineers. The project is located on the Menominee River near Iron Mountain, in Iron and Dickinson counties, Michigan, and Florence County, Wisconsin. The EA contains the Commission staff’s analysis of the potential environmental effects of decommissioning an existing powerhouse, constructing a new powerhouse and spillway, and making structural improvements to the dam, and concludes that authorizing the amendment, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, 202–502–8659. For further information, contact Steven Sachs by telephone at 202–502– 8666 or by email at Steven.Sachs@ferc.gov. Dated: June 28, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–16321 Filed 7–8–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY [FR Doc. 2013–16322 Filed 7–8–13; 8:45 am] BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [Project No. 2305–036] Federal Energy Regulatory Commission Sabine River Authority of Texas and Sabine River Authority, State of Louisiana; Public Meetings Soliciting Comments on the Draft Environmental Impact Statement for the Toledo Bend Hydroelectric Project mstockstill on DSK4VPTVN1PROD with NOTICES [Project No. 11831–095] Notice of Availability of Environmental Assessment; Wisconsin Electric Power Company In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 Code of Federal Regulations Part 380, Commission staff has reviewed the application for VerDate Mar<15>2010 17:44 Jul 08, 2013 Jkt 229001 On May 17, 2013, the Commission issued a Draft Environmental Impact Statement (draft EIS) for the Toledo Bend Hydroelectric Project No 2105– 036 (Toledo Bend Project). The draft EIS documents the views of governmental agencies, non-governmental organizations, affected Indian tribes, the PO 00000 Frm 00033 Fmt 4703 Sfmt 9990 41057 public, the license applicants, and Commission staff. All written comments must be filed by August 5, 2013, and should reference Project No. 2105–036. More information on filing comments can be found in the letter at the front of the draft EIS or on the Commission’s Web site at https://www.ferc.gov/docsfiling/efiling.asp. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. In addition to or in lieu of sending written comments, you are invited to attend public meetings that will be held to receive comments on the draft EIS. The daytime meeting will focus on resource agency, Indian tribes, and nongovernmental organization comments, while the evening meeting is primarily for receiving input from the public. All interested individuals and entities are invited to attend one or both of the public meetings. The time and location of the meetings are as follows: DATE: Tuesday, July 30, 2013 TIME: 10:30 a.m. PLACE: Orange Public Library ADDRESS: 220 North Fifth Street, Orange, Texas 77630, (409) 883–1086 DATE: Wednesday, July 31, 2013 TIME: 7 p.m. PLACE: Cypress Bend Conference Center ADDRESS: 2000 Cypress Bend Parkway, Many, Louisiana, 71449, (877) 519– 1500 At this meeting, resource agency personnel and other interested persons will have the opportunity to provide oral and written comments and recommendations regarding the draft EIS. The meeting will be recorded by a court reporter, and all statements (verbal and written) will become part of the Commission’s public record for the project. This meeting is posted on the Commission’s calendar located at https://www.ferc.gov/EventCalendar/ EventsList.aspx along with other related information. For further information, contact Alan Mitchnick at (202) 502–6074 or at alan.mitchnick@ferc.gov. Dated: July 1, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–16319 Filed 7–8–13; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\09JYN1.SGM 09JYN1

Agencies

[Federal Register Volume 78, Number 131 (Tuesday, July 9, 2013)]
[Notices]
[Pages 41056-41057]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-16322]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Availability of Environmental Assessment

BOST5 Hydroelectric LLC..........  Project No. 12758-004
BOST4 Hydroelectric LLC..........  Project No. 12757-004
BOST3 Hydroelectric LLC..........  Project No. 12756-003
 

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission (Commission or FERC) 
regulations, 18 Code of Federal Regulations (CFR). Part 380 (Order No. 
486, 52 Federal Register 47897), the Office of Energy Projects has 
reviewed the applications for original licenses for the Red River Lock 
and Dam No. 5 Hydroelectric Project (FERC Project No. 12758-004), Red 
River Lock and Dam No. 4 Hydroelectric Project (FERC Project No. 12757-
004), and Red River Lock and Dam No. 3 Hydroelectric Project (FERC 
Project No. 12756-003). The proposed projects would be located on the 
Red River in Louisiana. The Lock and Dam No. 5 Project would be located 
in Bossier Parish, near the Town of Ninock, Louisiana, at the U.S. Army 
Corps of Engineers' (Corps) Lock and Dam No. 5 at river mile (RM) 200 
and would occupy 69.9 acres of federal lands managed by the Corps. The 
Lock and Dam No. 4 Project would be located in Red River Parish, near 
the Town of Coushatta, Louisiana, at the Corps' Lock and Dam No. 4 at 
RM 168.5 and would occupy 135.1 acres of federal lands managed by the 
Corps. The Lock and Dam No. 3 Project would be located in Natchitoches 
Parish, near the Town of Colfax, Louisiana, at the Corps' Lock and Dam 
No. 3 at RM 116.5 and would occupy 60.2 acres of federal lands managed 
by the Corps.
    Staff prepared a multi-project environmental assessment (EA), which 
analyzes the potential environmental effects of licensing the three 
projects, and concludes that licensing the projects, with appropriate 
environmental protection measures, would not constitute a major federal 
action that would significantly affect the quality of the human 
environment.
    A copy of the EA is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits, in the docket number field to 
access the document. For assistance, contact FERC Online

[[Page 41057]]

Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, 
or for TTY, (202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Any comments should be filed within 30 days from the issuance date 
of this notice. Comments may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support.
    Although the Commission strongly encourages electronic filing, 
documents may also be paper-filed. To paper-file, mail an original and 
five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE., Washington, DC 20426. Please affix 
``Red River Lock and Dam No. 5 Hydroelectric Project No. 12758-004, Red 
River Lock and Dam Hydroelectric Project No. 4 No. 12757-004, and/or 
Red River Lock and Dam No. 3 Hydroelectric Project No. 12756-003'' as 
appropriate to all comments.
    For further information, contact Jeanne Edwards at (202) 502-6181, 
or by email at jeanne.edwards@ferc.gov.

    Dated: June 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-16322 Filed 7-8-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.