Notice of Availability of Environmental Assessment, 41056-41057 [2013-16322]
Download as PDF
41056
Federal Register / Vol. 78, No. 131 / Tuesday, July 9, 2013 / Notices
Accession Number: 20130614–5170.
Comments Due: 5 p.m. ET 7/11/13.
Docket Numbers: ER13–1858–000.
Applicants: California Independent
System Operator Corporation.
Description: 2013–06–
28_CDWR_PLA_9 to be effective 7/1/
2013.
Filed Date: 6/28/13.
Accession Number: 20130628–5232.
Comments Due: 5 p.m. ET 7/19/13.
Docket Numbers: ER13–1859–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Ministerial Clean-Up
Filing re PJM OATT Att DD 5.10 due to
Overlapping Filings to be effective 7/1/
2013.
Filed Date: 6/28/13.
Accession Number: 20130628–5233.
Comments Due: 5 p.m. ET 7/19/13.
Docket Numbers: ER13–1860–000.
Applicants: Nevada Power Company.
Description: Rate Scehdule No. 137
Transmission Service Agreement—
Cargill Power Markets to be effective 1/
1/2016.
Filed Date: 6/28/13.
Accession Number: 20130628–5234.
Comments Due: 5 p.m. ET 7/19/13.
Docket Numbers: ER13–1861–000.
Applicants: Salinas River
Cogeneration Company.
Description: Triennial Market Power
Analysis for the Southwest Region to be
effective 6/29/2013.
Filed Date: 6/28/13.
Accession Number: 20130628–5244.
Comments Due: 5 p.m. ET 8/27/13.
Docket Numbers: ER13–1862–000.
Applicants: Southwest Power Pool,
Inc.
Description: 1166R18 Oklahoma
Municipal Power Authority NITSA and
NOA to be effective 6/1/2013.
Filed Date: 6/28/13.
Accession Number: 20130628–5248.
Comments Due: 5 p.m. ET 7/19/13.
Docket Numbers: ER13–1863–000.
Applicants: Entergy Arkansas, Inc.
Description: LEPA 2nd Rev. NITSA to
be effective 6/1/2013.
Filed Date: 6/28/13.
Accession Number: 20130628–5250.
Comments Due: 5 p.m. ET 7/19/13.
Docket Numbers: ER13–1864–000.
Applicants: Southwest Power Pool,
Inc.
Description: JOA Market-to-Market
Compliance from Docket No. ER12–
1179 to be effective 12/31/9998.
Filed Date: 6/28/13.
Accession Number: 20130628–5265.
Comments Due: 5 p.m. ET 7/19/13.
Docket Numbers: ER13–1865–000.
Applicants: Tesoro Refining &
Marketing Company LLC.
Description: Wholesale MBR Tariff
Filing to be effective 7/30/2013.
Filed Date: 6/28/13.
Accession Number: 20130628–5273.
Comments Due: 5 p.m. ET 7/19/13.
Docket Numbers: ER13–1866–000.
Applicants: San Diego Gas & Electric
Company.
Description: SDGE TO Appendix X
Formula Modification to be effective 7/
1/2013.
Filed Date: 6/28/13.
Accession Number: 20130628–5276.
Comments Due: 5 p.m. ET 7/19/13.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF13–532–000.
Applicants: Verizon Corporate
Services Group Inc.
Description: Form 556 of Verizon
Corporate Services Group Inc.
Filed Date: 6/27/13.
Accession Number: 20130627–5059.
Comments Due: None Applicable.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 1, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–16446 Filed 7–8–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Availability of Environmental
Assessment
mstockstill on DSK4VPTVN1PROD with NOTICES
BOST5 Hydroelectric LLC .............................................................................................................................................
BOST4 Hydroelectric LLC .............................................................................................................................................
BOST3 Hydroelectric LLC .............................................................................................................................................
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission or FERC)
regulations, 18 Code of Federal
Regulations (CFR). Part 380 (Order No.
486, 52 Federal Register 47897), the
Office of Energy Projects has reviewed
the applications for original licenses for
the Red River Lock and Dam No. 5
Hydroelectric Project (FERC Project No.
12758–004), Red River Lock and Dam
No. 4 Hydroelectric Project (FERC
Project No. 12757–004), and Red River
Lock and Dam No. 3 Hydroelectric
Project (FERC Project No. 12756–003).
The proposed projects would be located
on the Red River in Louisiana. The Lock
and Dam No. 5 Project would be located
VerDate Mar<15>2010
17:44 Jul 08, 2013
Jkt 229001
in Bossier Parish, near the Town of
Ninock, Louisiana, at the U.S. Army
Corps of Engineers’ (Corps) Lock and
Dam No. 5 at river mile (RM) 200 and
would occupy 69.9 acres of federal
lands managed by the Corps. The Lock
and Dam No. 4 Project would be located
in Red River Parish, near the Town of
Coushatta, Louisiana, at the Corps’ Lock
and Dam No. 4 at RM 168.5 and would
occupy 135.1 acres of federal lands
managed by the Corps. The Lock and
Dam No. 3 Project would be located in
Natchitoches Parish, near the Town of
Colfax, Louisiana, at the Corps’ Lock
and Dam No. 3 at RM 116.5 and would
occupy 60.2 acres of federal lands
managed by the Corps.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Project No. 12758–004
Project No. 12757–004
Project No. 12756–003
Staff prepared a multi-project
environmental assessment (EA), which
analyzes the potential environmental
effects of licensing the three projects,
and concludes that licensing the
projects, with appropriate
environmental protection measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
E:\FR\FM\09JYN1.SGM
09JYN1
Federal Register / Vol. 78, No. 131 / Tuesday, July 9, 2013 / Notices
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the issuance date of this
notice. Comments may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and five copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please affix ‘‘Red River Lock and Dam
No. 5 Hydroelectric Project No. 12758–
004, Red River Lock and Dam
Hydroelectric Project No. 4 No. 12757–
004, and/or Red River Lock and Dam
No. 3 Hydroelectric Project No. 12756–
003’’ as appropriate to all comments.
For further information, contact
Jeanne Edwards at (202) 502–6181, or by
email at jeanne.edwards@ferc.gov.
Dated: June 28, 2013.
Kimberly D. Bose,
Secretary.
amendment of license for the Twin Falls
Hydroelectric Project (FERC Project No.
11831) and has prepared an
environmental assessment (EA) in
cooperation with the U.S. Army Corps
of Engineers. The project is located on
the Menominee River near Iron
Mountain, in Iron and Dickinson
counties, Michigan, and Florence
County, Wisconsin.
The EA contains the Commission
staff’s analysis of the potential
environmental effects of
decommissioning an existing
powerhouse, constructing a new
powerhouse and spillway, and making
structural improvements to the dam,
and concludes that authorizing the
amendment, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
202–502–8659.
For further information, contact
Steven Sachs by telephone at 202–502–
8666 or by email at
Steven.Sachs@ferc.gov.
Dated: June 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–16321 Filed 7–8–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[FR Doc. 2013–16322 Filed 7–8–13; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Project No. 2305–036]
Federal Energy Regulatory
Commission
Sabine River Authority of Texas and
Sabine River Authority, State of
Louisiana; Public Meetings Soliciting
Comments on the Draft Environmental
Impact Statement for the Toledo Bend
Hydroelectric Project
mstockstill on DSK4VPTVN1PROD with NOTICES
[Project No. 11831–095]
Notice of Availability of Environmental
Assessment; Wisconsin Electric Power
Company
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 Code of Federal
Regulations Part 380, Commission staff
has reviewed the application for
VerDate Mar<15>2010
17:44 Jul 08, 2013
Jkt 229001
On May 17, 2013, the Commission
issued a Draft Environmental Impact
Statement (draft EIS) for the Toledo
Bend Hydroelectric Project No 2105–
036 (Toledo Bend Project). The draft EIS
documents the views of governmental
agencies, non-governmental
organizations, affected Indian tribes, the
PO 00000
Frm 00033
Fmt 4703
Sfmt 9990
41057
public, the license applicants, and
Commission staff. All written comments
must be filed by August 5, 2013, and
should reference Project No. 2105–036.
More information on filing comments
can be found in the letter at the front of
the draft EIS or on the Commission’s
Web site at https://www.ferc.gov/docsfiling/efiling.asp. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed.
In addition to or in lieu of sending
written comments, you are invited to
attend public meetings that will be held
to receive comments on the draft EIS.
The daytime meeting will focus on
resource agency, Indian tribes, and nongovernmental organization comments,
while the evening meeting is primarily
for receiving input from the public. All
interested individuals and entities are
invited to attend one or both of the
public meetings. The time and location
of the meetings are as follows:
DATE: Tuesday, July 30, 2013
TIME: 10:30 a.m.
PLACE: Orange Public Library
ADDRESS: 220 North Fifth Street,
Orange, Texas 77630, (409) 883–1086
DATE: Wednesday, July 31, 2013
TIME: 7 p.m.
PLACE: Cypress Bend Conference
Center
ADDRESS: 2000 Cypress Bend Parkway,
Many, Louisiana, 71449, (877) 519–
1500
At this meeting, resource agency
personnel and other interested persons
will have the opportunity to provide
oral and written comments and
recommendations regarding the draft
EIS. The meeting will be recorded by a
court reporter, and all statements (verbal
and written) will become part of the
Commission’s public record for the
project. This meeting is posted on the
Commission’s calendar located at
https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
For further information, contact Alan
Mitchnick at (202) 502–6074 or at
alan.mitchnick@ferc.gov.
Dated: July 1, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–16319 Filed 7–8–13; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\09JYN1.SGM
09JYN1
Agencies
[Federal Register Volume 78, Number 131 (Tuesday, July 9, 2013)]
[Notices]
[Pages 41056-41057]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-16322]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Availability of Environmental Assessment
BOST5 Hydroelectric LLC.......... Project No. 12758-004
BOST4 Hydroelectric LLC.......... Project No. 12757-004
BOST3 Hydroelectric LLC.......... Project No. 12756-003
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission (Commission or FERC)
regulations, 18 Code of Federal Regulations (CFR). Part 380 (Order No.
486, 52 Federal Register 47897), the Office of Energy Projects has
reviewed the applications for original licenses for the Red River Lock
and Dam No. 5 Hydroelectric Project (FERC Project No. 12758-004), Red
River Lock and Dam No. 4 Hydroelectric Project (FERC Project No. 12757-
004), and Red River Lock and Dam No. 3 Hydroelectric Project (FERC
Project No. 12756-003). The proposed projects would be located on the
Red River in Louisiana. The Lock and Dam No. 5 Project would be located
in Bossier Parish, near the Town of Ninock, Louisiana, at the U.S. Army
Corps of Engineers' (Corps) Lock and Dam No. 5 at river mile (RM) 200
and would occupy 69.9 acres of federal lands managed by the Corps. The
Lock and Dam No. 4 Project would be located in Red River Parish, near
the Town of Coushatta, Louisiana, at the Corps' Lock and Dam No. 4 at
RM 168.5 and would occupy 135.1 acres of federal lands managed by the
Corps. The Lock and Dam No. 3 Project would be located in Natchitoches
Parish, near the Town of Colfax, Louisiana, at the Corps' Lock and Dam
No. 3 at RM 116.5 and would occupy 60.2 acres of federal lands managed
by the Corps.
Staff prepared a multi-project environmental assessment (EA), which
analyzes the potential environmental effects of licensing the three
projects, and concludes that licensing the projects, with appropriate
environmental protection measures, would not constitute a major federal
action that would significantly affect the quality of the human
environment.
A copy of the EA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits, in the docket number field to
access the document. For assistance, contact FERC Online
[[Page 41057]]
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676,
or for TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Any comments should be filed within 30 days from the issuance date
of this notice. Comments may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support.
Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426. Please affix
``Red River Lock and Dam No. 5 Hydroelectric Project No. 12758-004, Red
River Lock and Dam Hydroelectric Project No. 4 No. 12757-004, and/or
Red River Lock and Dam No. 3 Hydroelectric Project No. 12756-003'' as
appropriate to all comments.
For further information, contact Jeanne Edwards at (202) 502-6181,
or by email at jeanne.edwards@ferc.gov.
Dated: June 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-16322 Filed 7-8-13; 8:45 am]
BILLING CODE 6717-01-P