Notice of Availability of the Final Environmental Impact Statement/Environmental Impact Report for the Casa Diablo IV Geothermal Development Project, Mono County, CA, 40497-40498 [2013-16128]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 129 / Friday, July 5, 2013 / Notices
Land Management Price Field Office,
125 South 600 West, Price, Utah 84501;
or by email at mmackiew@blm.gov. You
may contact Mr. Mackiewicz to have
your name added to our mailing list.
Persons who use a
telecommunications device for the deaf
(TDD) may call the Federal Information
Relay Service (FIRS) at 1–800–877–8339
to contact the above individual during
normal business hours. The FIRS is
available 24 hours a day, 7 days a week,
to leave a message or question with the
above individual. You will receive a
reply during normal business hours.
SUPPLEMENTARY INFORMATION: The BLM
has prepared a Draft Supplemental EIS
to correct the deficiencies in the Ruby
Pipeline Final EIS identified by the
Ninth U.S. Circuit Court of Appeals.
The Draft Supplemental EIS includes
supplemental information about the
original and present condition of the
sagebrush steppe habitat and analyzes
the cumulative impacts of the Ruby
Pipeline Project based on the
supplemental information. The Draft
Supplemental EIS will serve as the
foundation for the BLM’s decision on
whether to reissue the right-of-way
(ROW) granted to Ruby for the project
and, if so, to determine what terms and
conditions would be required.
The Federal Energy Regulatory
Commission (FERC) is responsible for
authorizing construction and operation
of interstate natural gas pipelines.
Accordingly, the FERC served as the
lead agency for Ruby Pipeline LLC’s
(Ruby) application for the Ruby Pipeline
Project. The FERC used the Final EIS it
prepared (January 28, 2010) to issue its
Certificate for the Ruby Pipeline Project
on April 5, 2010. The Certificate
authorized Ruby to construct an
approximately 678-mile long, 42-inch
diameter interstate natural gas pipeline
that crosses 368 miles of Federal land
beginning near Opal, Wyoming,
extending through northern Utah and
northern Nevada, and terminating near
Malin, Oregon.
The BLM has primary responsibility
for issuing right-of-way ROW grants and
temporary use permits for natural gas
pipelines across most Federal lands
pursuant to Section 28 of the Mineral
Leasing Act of 1920, as amended (30
U.S.C. 185 et seq.). Ruby applied to the
BLM for a ROW grant for the Ruby
Pipeline Project on December 3, 2007.
The Federal lands crossed or used as
access for the project include lands
managed by the BLM; Bureau of
Reclamation (Reclamation); the United
States Fish and Wildlife Service
(USFWS) Sheldon National Wildlife
Refuge; and the United States
VerDate Mar<15>2010
17:06 Jul 03, 2013
Jkt 229001
Department of Agriculture, Forest
Service (USFS), specifically the
Fremont-Winema National Forests, the
Uinta-Wasatch-Cache National Forest,
and the Modoc National Forest. Based
on the Final EIS issued by the FERC, the
BLM issued a Ruby Pipeline Project
Record of Decision (ROD) and ROW
grant for the use of lands under the
administration of the BLM,
Reclamation, USFWS, and the USFS on
July 12, 2010.
The project has been constructed and
is currently in operation. However, the
BLM Ruby Pipeline Project ROD and
ROW grant were appealed to the Ninth
U.S. Circuit Court of Appeals in 2011,
and, on October 22, 2012, the court
found that the Ruby Pipeline Final EIS
does not provide sufficient quantified or
detailed data about the cumulative loss
of sagebrush steppe vegetation and
habitat. Consistent with an April 29,
2013, order staying an earlier opinion
vacating the BLM’s original ROD, the
Ninth Circuit directed the BLM to
prepare a revised ROD by November 21,
2013, that addresses the identified
deficiencies in the NEPA analysis. The
Supplemental EIS is part of the process
of responding to that order.
To the extent applicable, the BLM
will use the NEPA commenting process
to satisfy the public involvement
process for Section 106 of the National
Historic Preservation Act as provided
for in 36 CFR 800.2(d)(3) and Secretarial
Order 3317. Native American tribal
consultations will be conducted in
accordance with policy, and tribal
concerns will be given due
consideration, including impacts on
Indian trust assets.
Please note that public comments and
information submitted including names,
street addresses, and email addresses of
persons who submit comments will be
available for public review and
disclosure at the above address during
regular business hours (8 a.m. to 4 p.m.),
Monday through Friday, except
holidays.
Copies of the Ruby Pipeline Project
Draft Supplemental EIS are available at
the following BLM offices:
• Kemmerer Field Office, 312 Hwy
189 North, Kemmerer, Wyoming
• Salt Lake Field Office, 2370 South
2300 West, Salt Lake City, Utah
• Elko District Office, 3900 East Idaho
Street, Elko, Nevada
• Winnemucca District Office, 5100
East Winnemucca Boulevard,
Winnemucca, Nevada
• Lakeview District Office, 1301 S. G
Street, Lakeview, Oregon
• Klamath Falls Resource Area Office,
2795 Anderson Avenue, Suite 25,
Klamath Falls, Oregon
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
40497
• Surprise Field Office, 602 Cressler
Street, Cedarville, California
• Additional locations where hard
copies of the Draft Supplemental EIS
can be viewed can be found on the
project Web site or by contacting the
project manager.
Before including your address, phone
number, email address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Authority: 40 CFR 1502.9, 43 CFR 2880.
Amy Lueders,
Nevada State Director.
[FR Doc. 2013–16129 Filed 7–3–13; 8:45 am]
BILLING CODE 4310–HC–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLCAC07000 L913100000 EI0000
LXSIGEOT0000]
Notice of Availability of the Final
Environmental Impact Statement/
Environmental Impact Report for the
Casa Diablo IV Geothermal
Development Project, Mono County,
CA
Bureau of Land Management,
Interior.
ACTION: Notice of Availability.
AGENCY:
In accordance with the
National Environmental Policy Act of
1969, as amended (NEPA); the Federal
Land Policy and Management Act of
1976, as amended; and the California
Environmental Quality Act of 1970
(CEQA), the Bureau of Land
Management (BLM), the United States
Forest Service (USFS), and the Great
Basin Unified Air Pollution Control
District (GBUAPCD), a California State
agency, have prepared a Final
Environmental Impact Statement (EIS)/
Environmental Impact Report (EIR) for
the proposed Casa Diablo IV Geothermal
Development Project near the town of
Mammoth Lakes in Mono County,
California, and by this notice are
announcing its availability.
DATES: The BLM will not issue a final
decision on the proposal for a minimum
of 30 days after the date that the
Environmental Protection Agency
publishes its notice of availability in the
Federal Register.
SUMMARY:
E:\FR\FM\05JYN1.SGM
05JYN1
40498
Federal Register / Vol. 78, No. 129 / Friday, July 5, 2013 / Notices
You may request an
electronic copy of the Casa Diablo IV
Geothermal Development Project Final
EIS/EIR by any of the following
methods:
• Mail: BLM Bishop Field Office, 351
Pacu Lane, Suite 100, Bishop, CA
93514; Attn: Casa Diablo IV Geothermal
Development Project Final EIS/EIR, c/o
Collin Reinhardt, Project Manager.
• Email: cabipubcom@blm.gov;
Subject: Casa Diablo IV Geothermal
Development Project Final EIS/EIR.
• Fax: 760–872–5050; Attn: Collin
Reinhardt.
Interested persons may also review
the Final EIS/EIR on the Internet at
https://www.blm.gov/ca/st/en/fo/
bishop.html.
Copies of the Final EIS/EIR are also
available for public inspection at the
BLM Bishop Field Office at the above
address and at the Mono County Library
at 400 Sierra Park Road, Mammoth
Lakes, California.
FOR FURTHER INFORMATION CONTACT:
Collin Reinhardt, Project Manager,
telephone 760–872–5024; address 351
Pacu Lane, Suite 100, Bishop, CA
93514; email creinhardt@blm.gov.
Persons who use a telecommunications
device for the deaf (TDD) may call the
Federal Information Relay Service
(FIRS) at 1–800–877–8339 to contact the
above individual during normal
business hours. The FIRS is available 24
hours a day, 7 days a week, to leave a
message or question with the above
individual. You will receive a reply
during normal business hours.
SUPPLEMENTARY INFORMATION: The Final
EIS/EIR analyzes the potential impacts
of authorizing the proposed Casa Diablo
IV Geothermal Development Project
near the town of Mammoth Lakes in
Mono County, California. In accordance
with the Geothermal Steam Act of 1970,
as amended (30 U.S.C. 1001 et seq.), the
BLM Bishop Field Office is the lead
Federal agency responsible for
permitting the proposed project and for
completing the required environmental
analysis under NEPA. The USFS Inyo
National Forest is a cooperating Federal
agency. The GBUAPCD is the lead State
agency responsible for permitting the
proposed project and for completing the
required environmental analysis under
CEQA.
The purpose and need for action is to
respond to an application to construct
and operate the Casa Diablo IV project
on Federal geothermal leases
administered by the BLM Bishop Field
Office. The project would be located on
Inyo National Forest lands and adjacent
private lands within portions of Federal
geothermal leases CACA–11667, CACA–
tkelley on DSK3SPTVN1PROD with NOTICES
ADDRESSES:
VerDate Mar<15>2010
17:06 Jul 03, 2013
Jkt 229001
14407, CACA–14408, and CACA–11672.
The project would be located adjacent to
three currently operating geothermal
plants.
The 33 megawatt binary geothermal
power plant would be the fourth
geothermal plant in the vicinity. It
would include up to 16 wells for
production and injection, drilled 1,600
to 2,500 feet deep. Pipelines would be
constructed to transport geothermal
fluid from production wells to the
power plant and the return of fluids
from the power plant to injection wells.
A 650-foot-long transmission line would
connect the new power plant to the
Southern California Edison substation at
Substation Road. The power plant,
access roads, well pads, pipelines, and
transmission line would occupy
approximately 80 acres. Of the 16
proposed production/injection well
locations, 14 were previously analyzed
and approved by the BLM as
exploration wells in EA–170–02–15
(2001) and EA–170–05–04 (2005). Three
of these exploration wells have already
been drilled as of the time of the
publication of this notice.
Three action alternatives and a no
action alternative are analyzed in the
Final EIS/EIR. Alternative 1 is the
applicant’s proposed action as outlined
above; Alternative 2 considers an
alternative location for the proposed
power plant; and Alternative 3 (the
BLM’s preferred alternative) considers
alternative pipeline alignments in Basalt
Canyon and slightly alters the location
of one proposed well. The GBUAPCD
has identified Alternative 3 as the
‘‘environmentally superior alternative’’
pursuant to CEQA (14 C.C.R.
15126.6(e)(2)).
Alternative 4, the No Action
Alternative, would not construct the
CD–IV Project. The three existing
geothermal power plants, the pipeline
from Basalt Canyon, and two existing
production wells would continue
operating in accordance with their
respective permits. Under the No Action
Alternative, geothermal exploration in
Basalt Canyon and Upper Basalt Canyon
previously approved would be expected
to continue. Previous analyses resulted
in the approval of up to ten small
diameter (slim hole) and six geothermal
exploratory (large diameter) geothermal
wells, some of which have been already
drilled. Under the No Action
Alternative, while no activities related
to the Proposed Action would occur,
nine additional small diameter and two
large diameter exploratory wells could
be drilled as previously authorized.
The Final EIS/EIR describes and
analyzes the project’s site-specific
impacts on the following resources: Air,
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
biological, climate change, cultural and
paleontological, geothermal and
groundwater, geologic, soil, mineral,
grazing, wild horses and burros, land
use, noise and vibration, population and
housing, public safety, hazardous
materials, fire, recreation,
socioeconomics and environmental
justice, traffic, utilities and public
service, visual, and surface water.
In addition to scoping activities, a
Notice of Availability of the Draft EIS/
EIR was published in the Federal
Register on November 16, 2012 (77 FR
68813), announcing a 60-day comment
period ending January 15, 2013. In
response to requests, the NEPA
comment period was extended to
January 30, 2013 and the CEQA
comment period was extended to
February 20, 2013. Additionally, two
public meetings were held on December
5 and 6, 2012, in Mammoth Lakes and
Lake Crowley, California, respectively.
One oral comment and 28 comment
letters were received. Comments on the
Draft EIS/EIR primarily pertained to the
NEPA and CEQA processes, project
alternatives, and impacts to various
resources and uses. The agencies also
received statements in support of the
proposal.
All comments were addressed in the
Final EIS/EIR, some of which resulted
in corrections and clarifying text that
did not significantly change the
alternatives or analysis. Similarly,
consultation pursuant to Section 106 of
the National Historic Preservation Act
and Section 7 of the Federal Endangered
Species Act has resulted in revisions to
the project as reflected in the Final EIS/
EIS that further avoid impacts to
cultural and biological resources.
Authority: 40 CFR 1506.6, 40 CFR 1506.10.
Thomas Pogacnik,
Deputy State Director.
[FR Doc. 2013–16128 Filed 7–3–13; 8:45 am]
BILLING CODE 4310–40–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLOR936000.L14300000.ET0000 FUND:
13XL1109AF; HAG–13–0143; OR–47417]
Public Land Order No. 7817; Extension
of Public Land Order No. 6986; Oregon
Bureau of Land Management,
Interior.
ACTION: Public land order.
AGENCY:
This order extends the
duration of the withdrawal created by
Public Land Order No. 6986, which was
issued effective July 1, 1993, for an
SUMMARY:
E:\FR\FM\05JYN1.SGM
05JYN1
Agencies
[Federal Register Volume 78, Number 129 (Friday, July 5, 2013)]
[Notices]
[Pages 40497-40498]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-16128]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLCAC07000 L913100000 EI0000 LXSIGEOT0000]
Notice of Availability of the Final Environmental Impact
Statement/Environmental Impact Report for the Casa Diablo IV Geothermal
Development Project, Mono County, CA
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of Availability.
-----------------------------------------------------------------------
SUMMARY: In accordance with the National Environmental Policy Act of
1969, as amended (NEPA); the Federal Land Policy and Management Act of
1976, as amended; and the California Environmental Quality Act of 1970
(CEQA), the Bureau of Land Management (BLM), the United States Forest
Service (USFS), and the Great Basin Unified Air Pollution Control
District (GBUAPCD), a California State agency, have prepared a Final
Environmental Impact Statement (EIS)/Environmental Impact Report (EIR)
for the proposed Casa Diablo IV Geothermal Development Project near the
town of Mammoth Lakes in Mono County, California, and by this notice
are announcing its availability.
DATES: The BLM will not issue a final decision on the proposal for a
minimum of 30 days after the date that the Environmental Protection
Agency publishes its notice of availability in the Federal Register.
[[Page 40498]]
ADDRESSES: You may request an electronic copy of the Casa Diablo IV
Geothermal Development Project Final EIS/EIR by any of the following
methods:
Mail: BLM Bishop Field Office, 351 Pacu Lane, Suite 100,
Bishop, CA 93514; Attn: Casa Diablo IV Geothermal Development Project
Final EIS/EIR, c/o Collin Reinhardt, Project Manager.
Email: cabipubcom@blm.gov; Subject: Casa Diablo IV
Geothermal Development Project Final EIS/EIR.
Fax: 760-872-5050; Attn: Collin Reinhardt.
Interested persons may also review the Final EIS/EIR on the
Internet at https://www.blm.gov/ca/st/en/fo/bishop.html.
Copies of the Final EIS/EIR are also available for public
inspection at the BLM Bishop Field Office at the above address and at
the Mono County Library at 400 Sierra Park Road, Mammoth Lakes,
California.
FOR FURTHER INFORMATION CONTACT: Collin Reinhardt, Project Manager,
telephone 760-872-5024; address 351 Pacu Lane, Suite 100, Bishop, CA
93514; email creinhardt@blm.gov. Persons who use a telecommunications
device for the deaf (TDD) may call the Federal Information Relay
Service (FIRS) at 1-800-877-8339 to contact the above individual during
normal business hours. The FIRS is available 24 hours a day, 7 days a
week, to leave a message or question with the above individual. You
will receive a reply during normal business hours.
SUPPLEMENTARY INFORMATION: The Final EIS/EIR analyzes the potential
impacts of authorizing the proposed Casa Diablo IV Geothermal
Development Project near the town of Mammoth Lakes in Mono County,
California. In accordance with the Geothermal Steam Act of 1970, as
amended (30 U.S.C. 1001 et seq.), the BLM Bishop Field Office is the
lead Federal agency responsible for permitting the proposed project and
for completing the required environmental analysis under NEPA. The USFS
Inyo National Forest is a cooperating Federal agency. The GBUAPCD is
the lead State agency responsible for permitting the proposed project
and for completing the required environmental analysis under CEQA.
The purpose and need for action is to respond to an application to
construct and operate the Casa Diablo IV project on Federal geothermal
leases administered by the BLM Bishop Field Office. The project would
be located on Inyo National Forest lands and adjacent private lands
within portions of Federal geothermal leases CACA-11667, CACA-14407,
CACA-14408, and CACA-11672. The project would be located adjacent to
three currently operating geothermal plants.
The 33 megawatt binary geothermal power plant would be the fourth
geothermal plant in the vicinity. It would include up to 16 wells for
production and injection, drilled 1,600 to 2,500 feet deep. Pipelines
would be constructed to transport geothermal fluid from production
wells to the power plant and the return of fluids from the power plant
to injection wells. A 650-foot-long transmission line would connect the
new power plant to the Southern California Edison substation at
Substation Road. The power plant, access roads, well pads, pipelines,
and transmission line would occupy approximately 80 acres. Of the 16
proposed production/injection well locations, 14 were previously
analyzed and approved by the BLM as exploration wells in EA-170-02-15
(2001) and EA-170-05-04 (2005). Three of these exploration wells have
already been drilled as of the time of the publication of this notice.
Three action alternatives and a no action alternative are analyzed
in the Final EIS/EIR. Alternative 1 is the applicant's proposed action
as outlined above; Alternative 2 considers an alternative location for
the proposed power plant; and Alternative 3 (the BLM's preferred
alternative) considers alternative pipeline alignments in Basalt Canyon
and slightly alters the location of one proposed well. The GBUAPCD has
identified Alternative 3 as the ``environmentally superior
alternative'' pursuant to CEQA (14 C.C.R. 15126.6(e)(2)).
Alternative 4, the No Action Alternative, would not construct the
CD-IV Project. The three existing geothermal power plants, the pipeline
from Basalt Canyon, and two existing production wells would continue
operating in accordance with their respective permits. Under the No
Action Alternative, geothermal exploration in Basalt Canyon and Upper
Basalt Canyon previously approved would be expected to continue.
Previous analyses resulted in the approval of up to ten small diameter
(slim hole) and six geothermal exploratory (large diameter) geothermal
wells, some of which have been already drilled. Under the No Action
Alternative, while no activities related to the Proposed Action would
occur, nine additional small diameter and two large diameter
exploratory wells could be drilled as previously authorized.
The Final EIS/EIR describes and analyzes the project's site-
specific impacts on the following resources: Air, biological, climate
change, cultural and paleontological, geothermal and groundwater,
geologic, soil, mineral, grazing, wild horses and burros, land use,
noise and vibration, population and housing, public safety, hazardous
materials, fire, recreation, socioeconomics and environmental justice,
traffic, utilities and public service, visual, and surface water.
In addition to scoping activities, a Notice of Availability of the
Draft EIS/EIR was published in the Federal Register on November 16,
2012 (77 FR 68813), announcing a 60-day comment period ending January
15, 2013. In response to requests, the NEPA comment period was extended
to January 30, 2013 and the CEQA comment period was extended to
February 20, 2013. Additionally, two public meetings were held on
December 5 and 6, 2012, in Mammoth Lakes and Lake Crowley, California,
respectively.
One oral comment and 28 comment letters were received. Comments on
the Draft EIS/EIR primarily pertained to the NEPA and CEQA processes,
project alternatives, and impacts to various resources and uses. The
agencies also received statements in support of the proposal.
All comments were addressed in the Final EIS/EIR, some of which
resulted in corrections and clarifying text that did not significantly
change the alternatives or analysis. Similarly, consultation pursuant
to Section 106 of the National Historic Preservation Act and Section 7
of the Federal Endangered Species Act has resulted in revisions to the
project as reflected in the Final EIS/EIS that further avoid impacts to
cultural and biological resources.
Authority: 40 CFR 1506.6, 40 CFR 1506.10.
Thomas Pogacnik,
Deputy State Director.
[FR Doc. 2013-16128 Filed 7-3-13; 8:45 am]
BILLING CODE 4310-40-P