Constitution Pipeline Company, LLC; Notice of Application, 39721-39722 [2013-15859]
Download as PDF
Federal Register / Vol. 78, No. 127 / Tuesday, July 2, 2013 / Notices
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and seven copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: July 17, 2013
Dated: June 26, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–15861 Filed 7–1–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP13–499–000; PF12–9–000]
Constitution Pipeline Company, LLC;
Notice of Application
tkelley on DSK3SPTVN1PROD with NOTICES
Take notice that on June 13, 2013,
Constitution Pipeline Company, LLC
(Constitution), having its principal place
of business at 2800 Post Oak Boulevard,
Houston, Texas 77056–6106, filed an
application in Docket No. CP13–499–
000 pursuant to Section 7(c) of the
Natural Gas Act (NGA) and Part 157 of
the Commission’s Regulations, for a
certificate of public convenience and
necessity to construct and operate
approximately 122 miles of 30-inch
diameter pipeline and related facilities.
The proposed project extends from
Susquehanna County, Pennsylvania,
through Broome, Chenango, Delaware,
and Schoharie Counties, New York.1
Constitution further requests that the
Commission grant Constitution a
blanket certificate authorizing
Constitution to construct, operate, and
abandon certain facilities under Part
157, Subpart F, of the Commission’s
regulations and a blanket certificate
authorizing Constitution to provide
transportation services on an open
access and self-implementing basis
under Part 284, Subpart G, of the
Commission’s regulations, all as more
fully set forth in the application, which
1 Iroquois Gas Transmission System, LP, has filed,
in Docket No. CP13–502–000, a concurrent
application requesting authorization to construct,
install, own, operate, and maintain certain new
compression facilities to be located in Wright, New
York, and to modify certain existing facilities at that
same location, and to lease the incremental capacity
associated with these new and modified facilities to
Constitution as part of this proposed project.
VerDate Mar<15>2010
16:48 Jul 01, 2013
Jkt 229001
is on file with the Commission and open
to public inspection. This filing may
also be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to
William H. Hammons, Staff Regulatory
Analyst, Rates and Regulatory,
Constitution Pipeline Company, LLC,
P.O. Box 1396, Houston, Texas 77251,
or by calling (713) 215–2130 (telephone)
or (713) 215–3483 (fax)
william.h.hammons@williams.com.
On April 16, 2012, the Commission
staff granted Constitution’s request to
use the pre-filing process and assigned
Docket No. PF12–9–000 to staff
activities involving the project. Now, as
of the filing of this application on June
13, 2013, the NEPA Pre-Filing Process
for this project has ended. From this
time forward, this proceeding will be
conducted in Docket No. CP13–499–
000, as noted in the caption of this
Notice.
Pursuant to section 157.9 of the
Commission’s regulations, 18 CFR
157.9, within 90 days of this Notice, the
Commission’s staff will either complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission’s staff issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to reach a final
decision on a request for federal
authorization within 90 days of the date
of issuance of the Commission staff’s
EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
39721
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link.
Comment Date: July 17, 2013.
E:\FR\FM\02JYN1.SGM
02JYN1
39722
Federal Register / Vol. 78, No. 127 / Tuesday, July 2, 2013 / Notices
Dated: June 26, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–15859 Filed 7–1–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
tkelley on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–4380–003;
ER12–2677–001; ER10–2431–004;
ER11–2363–003; ER10–2434–004;
ER10–2467–004; ER11–3731–005;
ER10–2488–008; ER12–1931–004;
ER10–2504–005; ER12–610–005;
ER13–338–003; ER12–2037–003;
ER12–2314–002; ER10–2436–004;
ER11–4381–003.
Applicants: Bellevue Solar, LLC,
Catalina Solar, LLC, Chanarambie Power
Partners, LLC, Chestnut Flats Wind,
LLC, Fenton Power Partners I, LLC,
Hoosier Wind Project, LLC, LWP Lessee,
LLC, Oasis Power Partners, LLC, Pacific
Wind Lessee, LLC, Shiloh Wind Project
2, LLC, Shiloh III Lessee, LLC, Shiloh IV
Lessee, LLC, Spearville 3, LLC,
Spinning Spur Wind LLC,
Wapsipinicon Wind Project, LLC,
Yamhill Solar, LLC.
Description: Notice of Change in
Status of the EDF–RE MBR Companies.
Filed Date: 6/21/13.
Accession Number: 20130621–5149.
Comments Due: 5 p.m. ET 7/12/13.
Docket Numbers: ER12–1653–004.
Applicants: New York Independent
System Operator, Inc.
Description: NYISO compliance errata
to order 755.frequency regulation 1/22/
13 filing to be effective 6/26/2013.
Filed Date: 6/21/13.
Accession Number: 20130621–5081.
Comments Due: 5 p.m. ET 7/12/13.
Docket Numbers: ER13–1180–001.
Applicants: PacifiCorp.
Description: PacifiCorp Energy
Carbon Decom Construction Agrmnt
Compliance Filing to be effective 3/29/
2013.
Filed Date: 6/21/13.
Accession Number: 20130621–5102.
Comments Due: 5 p.m. ET 7/12/13.
Docket Numbers: ER13–1402–001.
Applicants: Arizona Public Service
Company.
Description: Modify Effective Date of
Requested Rate Treatment and
Cancellation of RS 38 to be effective 12/
31/9998.
Filed Date: 6/21/13.
VerDate Mar<15>2010
17:51 Jul 01, 2013
Jkt 229001
Accession Number: 20130621–5101.
Comments Due: 5 p.m. ET 7/12/13.
Docket Numbers: ER13–1571–001.
Applicants: Southwest Power Pool,
Inc.
Description: 2551 Substitute Original
Kansas Municipal Energy Agency
NITSA NOA to be effective 5/1/2013.
Filed Date: 6/21/13.
Accession Number: 20130621–5130.
Comments Due: 5 p.m. ET 7/12/13.
Docket Numbers: ER13–1747–000.
Applicants: eBay Inc.
Description: eBay Inc. MBR
Application and Initial MBR Tariff to be
effective 8/26/2013.
Filed Date: 6/21/13.
Accession Number: 20130621–5118.
Comments Due: 5 p.m. ET 7/12/13.
Docket Numbers: ER13–1748–000.
Applicants: Southwest Power Pool,
Inc.
Description: Order No. 755
Compliance to be effective 3/1/2015.
Filed Date: 6/21/13.
Accession Number: 20130621–5131.
Comments Due: 5 p.m. ET 7/12/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 24, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–15798 Filed 7–1–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP13–212–000.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Applicants: Boardwalk Storage
Company, LLC.
Description: Operational Purchases
and Sales Report 2012.
Filed Date: 6/13/13.
Accession Number: 20130613–5033.
Comments Due: 5 p.m. ET 6/25/13.
Docket Numbers: RP13–977–000.
Applicants: Bobcat Gas Storage.
Description: Non-conforming
Agreement and Updates to be effective
7/15/2013.
Filed Date: 6/14/13.
Accession Number: 20130614–5088.
Comments Due: 5 p.m. ET 6/26/13.
Docket Numbers: RP13–978–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 06/14/13 Negotiated
Rates—Cargill Incorporated (RTS) 3085–
13 & 14 to be effective 6/15/2013.
Filed Date: 6/14/13.
Accession Number: 20130614–5109.
Comments Due: 5 p.m. ET 6/26/13.
Docket Numbers: RP13–979–000.
Applicants: Rockies Express Pipeline
LLC.
Description: Neg Rate NC 2013–06–14
Encana to be effective 6/15/2013.
Filed Date: 6/14/13.
Accession Number: 20130614–5110.
Comments Due: 5 p.m. ET 6/26/13.
Docket Numbers: RP13–980–000.
Applicants: Northern Natural Gas
Company.
Description: 20130614 Macquarie
Energy Non-Conforming to be effective
7/1/2013.
Filed Date: 6/14/13.
Accession Number: 20130614–5149.
Comments Due: 5 p.m. ET 6/26/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 17, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–15801 Filed 7–1–13; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\02JYN1.SGM
02JYN1
Agencies
[Federal Register Volume 78, Number 127 (Tuesday, July 2, 2013)]
[Notices]
[Pages 39721-39722]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-15859]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP13-499-000; PF12-9-000]
Constitution Pipeline Company, LLC; Notice of Application
Take notice that on June 13, 2013, Constitution Pipeline Company,
LLC (Constitution), having its principal place of business at 2800 Post
Oak Boulevard, Houston, Texas 77056-6106, filed an application in
Docket No. CP13-499-000 pursuant to Section 7(c) of the Natural Gas Act
(NGA) and Part 157 of the Commission's Regulations, for a certificate
of public convenience and necessity to construct and operate
approximately 122 miles of 30-inch diameter pipeline and related
facilities. The proposed project extends from Susquehanna County,
Pennsylvania, through Broome, Chenango, Delaware, and Schoharie
Counties, New York.\1\ Constitution further requests that the
Commission grant Constitution a blanket certificate authorizing
Constitution to construct, operate, and abandon certain facilities
under Part 157, Subpart F, of the Commission's regulations and a
blanket certificate authorizing Constitution to provide transportation
services on an open access and self-implementing basis under Part 284,
Subpart G, of the Commission's regulations, all as more fully set forth
in the application, which is on file with the Commission and open to
public inspection. This filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
---------------------------------------------------------------------------
\1\ Iroquois Gas Transmission System, LP, has filed, in Docket
No. CP13-502-000, a concurrent application requesting authorization
to construct, install, own, operate, and maintain certain new
compression facilities to be located in Wright, New York, and to
modify certain existing facilities at that same location, and to
lease the incremental capacity associated with these new and
modified facilities to Constitution as part of this proposed
project.
---------------------------------------------------------------------------
Any questions regarding this application should be directed to
William H. Hammons, Staff Regulatory Analyst, Rates and Regulatory,
Constitution Pipeline Company, LLC, P.O. Box 1396, Houston, Texas
77251, or by calling (713) 215-2130 (telephone) or (713) 215-3483 (fax)
william.h.hammons@williams.com.
On April 16, 2012, the Commission staff granted Constitution's
request to use the pre-filing process and assigned Docket No. PF12-9-
000 to staff activities involving the project. Now, as of the filing of
this application on June 13, 2013, the NEPA Pre-Filing Process for this
project has ended. From this time forward, this proceeding will be
conducted in Docket No. CP13-499-000, as noted in the caption of this
Notice.
Pursuant to section 157.9 of the Commission's regulations, 18 CFR
157.9, within 90 days of this Notice, the Commission's staff will
either complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission's staff issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to reach a final decision on a request
for federal authorization within 90 days of the date of issuance of the
Commission staff's EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 14 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenters will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link.
Comment Date: July 17, 2013.
[[Page 39722]]
Dated: June 26, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-15859 Filed 7-1-13; 8:45 am]
BILLING CODE 6717-01-P