Northern Natural Gas Company; Southern Natural Gas Company, L.L.C.; Florida Gas Transmission Company, LLC; Notice of Application, 38309 [2013-15186]
Download as PDF
Federal Register / Vol. 78, No. 123 / Wednesday, June 26, 2013 / Notices
stone masonry dam with an
uncontrolled spillway and a 150-footlong non-overflow section; (2) a 2000foot-long canal, between 25 and 40 feet
wide; (3) a powerhouse separate from
the dam containing a 600-kW generating
unit; (4) a reservoir with a surface area
of 20 acres at normal pool elevation of
315 feet mean sea level and a gross
storage capacity of 100 acre-feet; and (5)
appurtenant facilities. The project
operates run-of-river and generates and
estimated average of 2,461,000 kW
hours a year.
Pursuant to section 16.20(c) of the
Commission’s regulations, an existing
licensee with a minor license not
subject to sections 14 and 15 of the
Federal Power Act must file an
application for a subsequent license at
least 24 months prior to the expiration
of the current license.2 PK Ventures has
not filed an application for a subsequent
license for the Bynum project.
Pursuant to section 16.24(b)(2) of the
Commission’s regulations, an existing
licensee that fails to file a license
application pursuant to section 16.20(b)
shall be deemed to have filed a notice
of intent indicating that it does not
intend to file an application for
subsequent license. Therefore, pursuant
to section 16.25 of the Commission’s
regulations, interested parties have 90
days from the date of this notice to file
a NOI to file an application for a
subsequent license. An application for
subsequent license or exemption for the
Bynum Project (No. 4093) must be filed
within 18 months of the date of filing
the NOI. The existing licensee is
prohibited from filing an application
either individually or in combination
with other entities.3
Questions concerning this notice
should be directed to Sean Murphy at
(202) 502–6145 or
sean.murphy@ferc.gov.
Dated: June 19, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–15184 Filed 6–25–13; 8:45 am]
mstockstill on DSK4VPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
2 18
3 18
CFR 16.20(c) (2012).
CFR 16.24(b)(2) (2012)
VerDate Mar<15>2010
20:26 Jun 25, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–491–000]
Northern Natural Gas Company;
Southern Natural Gas Company,
L.L.C.; Florida Gas Transmission
Company, LLC; Notice of Application
Take notice that on June 4, 2013,
Northern Natural Gas Company
(Northern), 1111 South 103rd Street,
Omaha, Nebraska 68124; on behalf of
itself, Southern Natural Gas Company,
L.L.C., and Florida Gas Transmission
Company, LLC, (collectively,
Applicants) filed an application: under
section 7(b) of the Natural Gas Act to
abandon in-place the Matagorda
Offshore Pipeline System, located on
shore and in federal and state waters
offshore Texas, all as more fully set
forth in the joint application which is
on file with the Commission and open
to public inspection. Applicants also
request Commission approval to
abandon the services provided with
respect to receipt points located on the
facilities proposed for abandonment.
This filing may also be viewed on the
Commission’s Web site at https://
wnn.ferc.gov using the ‘‘eLibrary’’ link,
select ‘‘Docket #’’ and follow the
instructions (call 202–502–8222 or for
TTY, 202–502–8659).
Any questions regarding the joint
application should be directed to:
Michael T. Loeffler, Senior Director,
Certificates and External Affairs for
Northern, 1111 South 103rd Street,
Omaha, Nebraska 68124 by phone (402)
398–7103.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
an original and 7 copies of filings made
with the Commission and must mail a
copy to the applicant and to every other
party in the proceeding. Only parties to
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
38309
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426. This filing
is accessible on-line at https://
www.ferc.gov, using the ‘‘eLibrary’’ link
and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
‘‘eSubscription’’ link on the Web site
that enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 10, 2013.
Dated: June 19, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–15186 Filed 6–25–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER13–1700–000]
KASS Commodities; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding, of KASS
Commodities’ application for marketbased rate authority, with an
accompanying rate schedule, noting that
E:\FR\FM\26JNN1.SGM
26JNN1
Agencies
[Federal Register Volume 78, Number 123 (Wednesday, June 26, 2013)]
[Notices]
[Page 38309]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-15186]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP13-491-000]
Northern Natural Gas Company; Southern Natural Gas Company,
L.L.C.; Florida Gas Transmission Company, LLC; Notice of Application
Take notice that on June 4, 2013, Northern Natural Gas Company
(Northern), 1111 South 103rd Street, Omaha, Nebraska 68124; on behalf
of itself, Southern Natural Gas Company, L.L.C., and Florida Gas
Transmission Company, LLC, (collectively, Applicants) filed an
application: under section 7(b) of the Natural Gas Act to abandon in-
place the Matagorda Offshore Pipeline System, located on shore and in
federal and state waters offshore Texas, all as more fully set forth in
the joint application which is on file with the Commission and open to
public inspection. Applicants also request Commission approval to
abandon the services provided with respect to receipt points located on
the facilities proposed for abandonment. This filing may also be viewed
on the Commission's Web site at https://wnn.ferc.gov using the
``eLibrary'' link, select ``Docket '' and follow the
instructions (call 202-502-8222 or for TTY, 202-502-8659).
Any questions regarding the joint application should be directed
to: Michael T. Loeffler, Senior Director, Certificates and External
Affairs for Northern, 1111 South 103rd Street, Omaha, Nebraska 68124 by
phone (402) 398-7103.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit an original and 7 copies of filings made with the Commission and
must mail a copy to the applicant and to every other party in the
proceeding. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 7 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE., Washington,
DC 20426. This filing is accessible on-line at https://www.ferc.gov,
using the ``eLibrary'' link and is available for review in the
Commission's Public Reference Room in Washington, DC. There is an
``eSubscription'' link on the Web site that enables subscribers to
receive email notification when a document is added to a subscribed
docket(s). For assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on July 10, 2013.
Dated: June 19, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-15186 Filed 6-25-13; 8:45 am]
BILLING CODE 6717-01-P