Harmonization of Airworthiness Standards-Gust and Maneuver Load Requirements, 37722 [C1-2013-12445]
Download as PDF
37722
Federal Register / Vol. 78, No. 121 / Monday, June 24, 2013 / Proposed Rules
and licensees, and applicants for
standard design certifications, and
standard design approvals to use the
Code Cases listed in these three DGs as
alternatives to requirements in those
Editions and Addenda of the ASME
BPV and OM Codes which the NRC has
incorporated by reference into 10 CFR
50.55a.
mstockstill on DSK4VPTVN1PROD with PROPOSALS
III. Description of Draft Regulatory
Guides
Code Cases provide ASME approved
voluntary alternatives to the BPV and
OM Codes. The DGs are incorporated by
reference in 10 CFR 50.55a. The NRCapproved Code Cases provide an
acceptable voluntary alternative to the
mandatory ASME Code provisions, but
all of the provisions of a Code Case must
be used, with any identified limitations
or modifications, if implemented by an
applicant or licensee. The NRC
approves Code Cases in the three DGs
described below regarding the
construction, in-service inspection, and
in-service testing of nuclear power plant
components.
The DG entitled, ‘‘Design, Fabrication
and Materials Code Case Acceptability,
ASME Section III,’’ is temporarily
identified by its task number, DG–1230
(ADAMS Accession No. ML102590003).
The DG–1230 is proposed Revision 36
of Regulatory Guide 1.84. Revision 35 of
Regulatory Guide 1.84 was published in
October 2010 (ADAMS Accession No.
ML101800532).
The DG entitled, ‘‘Inservice
Inspection Code Case Acceptability,
ASME Section XI, Division1,’’ is
temporarily identified by its task
number, DG–1231 (ADAMS Accession
No. ML102590004). The DG–1231 is
proposed Revision 17 of Regulatory
Guide 1.147. Revision 16 of Regulatory
Guide 1.147 was published in October
2010 (ADAMS Accession No.
ML101800536).
The DG entitled, ‘‘Operation and
Maintenance code Case, Acceptability,
ASME OM Code,’’ is temporarily
identified by its task number, DG–1232
(ADAMS Accession No. ML102600001).
The DG–1232 is proposed Revision 1 of
Regulatory Guide 1.192. Revision 0 of
Regulatory Guide 1.192 was published
in June 2003 (ADAMS Accession No.
ML030730430).
The DG–1230 lists the new and
revised ASME BPV Section III, ‘‘Rules
for Construction of Nuclear Power Plant
Components,’’ Code Cases that the NRC
has approved for use. The DG–1231 lists
the new and revised ASME BPV Section
XI, ‘‘Rules for Inservice Inspection of
Nuclear Power Plant Components,’’
VerDate Mar<15>2010
18:40 Jun 21, 2013
Jkt 229001
Code Cases that the NRC has approved
for use. The new and revised OM Code
Cases that the NRC has approved for use
are listed in DG–1232, ‘‘Operation and
Maintenance Code Case Acceptability,
ASME OM Code.’’ For these regulatory
guide revisions, the NRC reviewed the
Code Cases listed in Supplements 1
through 10 to the 2007 Edition of the
ASME BPV Code and the 2002 through
2006 Addenda of OM Code.
IV. Regulatory Analysis
applicant’s and/or licensees’ voluntary
application of an approved Code Case
does not constitute backfitting,
inasmuch as there is no imposition of a
new requirement or new position.
Similarly, voluntary application of an
approved Code Case by a 10 CFR Part
52 applicant or licensee does not
represent NRC imposition of a
requirement or action which is
inconsistent with any issue finality
provision in 10 CFR Part 52. Therefore,
the NRC concludes that these DGs, if
finalized, do not constitute backfitting
as defined in 10 CFR 50.109 and are not
otherwise inconsistent with the issue
finality provisions in 10 CFR Part 52.
The regulatory analysis for the
underlying proposed rule also addresses
these three DGs. Therefore, the NRC did
not prepare a separate regulatory
analysis for these DGs. The NRC is
proposing to incorporate by reference
these DGs into 10 CFR 50.55a, ‘‘Codes
and standards’’ in of the aforementioned
proposed rulemaking published
elsewhere in the Proposed Rules section
of today’s Federal Register.
Dated at Rockville, Maryland, this 29th day
of May, 2013.
V. Backfitting and Issue Finality
[FR Doc. 2013–15021 Filed 6–21–13; 8:45 am]
These regulatory guides would
approve for use (at the option of nuclear
power plant applicants and licensees)
the ASME Code Cases listed in the
applicable regulatory guide. In some
cases, the NRC’s approval is
conditioned on meeting certain
requirements or prerequisites
(‘‘conditions’’). The NRC is proposing to
incorporate by reference these DGs, with
conditions, into 10 CFR 50.55a, Codes
and standards, in the aforementioned
proposed rulemaking published
elsewhere in the Proposed Rules section
of today’s Federal Register.
These DGs, if finalized, do not
constitute backfitting as defined in 10
CFR 50.109 (the Backfit Rule) and are
not otherwise inconsistent with the
issue finality provisions in 10 CFR Part
52, ‘‘Licenses, Certifications and
Approvals for Nuclear Power Plants.’’
The backfitting and issue finality
considerations for these regulatory
guides are addressed in the Federal
Register notice for the underlying
proposed rule, and introduces no new
backfitting or issue finality matters not
already addressed in that Federal
Register notice. Therefore, the NRC’s
consideration of backfitting and issue
finality matters for the underlying
proposed rule also serves as the NRC’s
consideration of the same backfitting
and issue finality matters for the
issuance of these DGs.
In addition, these DGs identify NRCapproved ASME Code Cases which
applicants and licensees may
voluntarily utilize as way of meeting the
NRC requirements in 10 CFR 50.55a. An
PO 00000
Frm 00002
Fmt 4702
Sfmt 4702
For the Nuclear Regulatory Commission.
Thomas H. Boyce,
Chief, Regulatory Guide Development Branch,
Division of Engineering, Office of Nuclear
Regulatory Research.
BILLING CODE 7590–01–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 25
[Docket No.: FAA–2013–0142; Notice No.
25–139]
RIN 2120–AK12
Harmonization of Airworthiness
Standards—Gust and Maneuver Load
Requirements
Correction
In proposed rule document 2013–
12445 appearing on pages 31851–31860
in the issue of Tuesday, May 28, 2013,
make the following corrections:
§ 25.341
[Corrected]
1. On page 31858, in § 25.341, in the
second column, in the twelfth line from
the bottom, ‘‘Uσρεϕ’’ should read
‘‘Uσρεφ’’.
2. On the same page, in the same
section, in the same column, in the
same line, ‘‘Us’’ should read ‘‘Uσ’’.
3. On the same page, in the same
section, in the same column, in the
tenth and third lines from the bottom,
‘‘Us’’ should read ‘‘Uσ’’.
[FR Doc. C1–2013–12445 Filed 6–21–13; 8:45 am]
BILLING CODE 1505–01–D
E:\FR\FM\24JNP1.SGM
24JNP1
Agencies
[Federal Register Volume 78, Number 121 (Monday, June 24, 2013)]
[Proposed Rules]
[Page 37722]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: C1-2013-12445]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 25
[Docket No.: FAA-2013-0142; Notice No. 25-139]
RIN 2120-AK12
Harmonization of Airworthiness Standards--Gust and Maneuver Load
Requirements
Correction
In proposed rule document 2013-12445 appearing on pages 31851-31860
in the issue of Tuesday, May 28, 2013, make the following corrections:
Sec. 25.341 [Corrected]
1. On page 31858, in Sec. 25.341, in the second column, in the
twelfth line from the bottom, ``U[sigma][rho][egr][phiv]'' should read
``U[sigma]ref''.
2. On the same page, in the same section, in the same column, in
the same line, ``U[sigma]'' should read ``U[sigma]''.
3. On the same page, in the same section, in the same column, in
the tenth and third lines from the bottom, ``U[sigma]'' should read
``U[sigma]''.
[FR Doc. C1-2013-12445 Filed 6-21-13; 8:45 am]
BILLING CODE 1505-01-D