Download as PDF 37456 Federal Register / Vol. 78, No. 120 / Friday, June 21, 2013 / Rules and Regulations Notice of temporary deviation from regulations. ACTION: The Commander, First Coast Guard District, has issued a temporary deviation from the regulations governing the operation of the Metropolitan District Commission (Craigie) Bridge across the Charles River, mile 1.0, at Boston, Massachusetts. Under this temporary deviation the bridge may remain in the closed position for two hours on July 4, 2013, to facilitate the Fourth of July Concert and Fireworks. This deviation is necessary to facilitate public safety during a public event. DATES: This deviation is effective from 10 p.m. on July 4, 2013 through 12 a.m. on July 5, 2013. ADDRESSES: The docket for this deviation, [USCG–2013–0464] is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12–140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call John McDonald, Project Officer, First Coast Guard District, at (617) 223–8364. If you have questions on viewing the docket, call Barbara Hairston, Program Manager, Docket Operations, telephone (202) 366–9826. SUPPLEMENTARY INFORMATION: On June 14th, a temporary deviation from the drawbridge regulation was published in the Federal Register (78 FR 35756) under the same name and docket number. This temporary deviation modifies the times listed on the previously published deviation in which the deviation will be in effect. The Metropolitan District Commission (Craigie) Bridge, across the Charles River, mile 1.0, at Boston, Massachusetts, has a vertical clearance in the closed position of 13.5 feet at normal pool elevation above the Charles River Dam. The existing drawbridge operation regulations are listed at 33 CFR § 117.591(e). The waterway is predominantly a recreational waterway supporting various size vessels. The owner of the bridge, Massachusetts Department of Transportation, requested a temporary deviation to facilitate public safety TKELLEY on DSK3SPTVN1PROD with RULES SUMMARY: VerDate Mar<15>2010 16:03 Jun 20, 2013 Jkt 229001 during a public event, the 2013 Fourth of July Concert and Fireworks. Under this temporary deviation, in effect from 10 p.m. on July 4, 2013 through 12 a.m. on July 5, 2013, the Metropolitan District Commission (Craigie) Bridge, mile 1.0, across the Charles River at Boston, Massachusetts, may remain in the closed position. Vessels that can pass under the bridge without a bridge opening may do so at all times. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: June 11, 2013. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. 2013–14788 Filed 6–20–13; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [USCG–2013–0426] Drawbridge Operation Regulations; Reynolds Channel, Nassau, NY Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Long Beach Bridge, mile 4.7, across Reynolds Channel at Nassau, New York. Under this temporary deviation, the bridge may remain in the closed position for two and a half hours to facilitate a public event, the Town of Hempstead Annual Fireworks Display. DATES: This deviation is effective between 9:30 p.m. and 12 a.m. on June 29, 2013 and June 30, 2013. ADDRESSES: The docket for this deviation, [USCG–2013–0426] is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12–140, on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., SUMMARY: PO 00000 Frm 00020 Fmt 4700 Sfmt 4700 Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Ms. Judy LeungYee, Project Officer, First Coast Guard District, judy.k.leung-yee@uscg.mil, or (212) 668–7165. If you have questions on viewing the docket, call Barbara Hairston, Program Manager, Docket Operations, telephone 202–366–9826. SUPPLEMENTARY INFORMATION: The Long Beach Bridge has a vertical clearance of 20 feet at mean high water, and 24 feet at mean low water in the closed position. The existing drawbridge operating regulations are found at 33 CFR 117.799(g). The bridge owner, the County of Nassau Department of Public Works, requested a bridge closure to facilitate a public event, the Town of Hempstead Annual Salute to Veterans Fireworks Display. Under this temporary deviation, the Long Beach Bridge may remain in the closed position between 9:30 p.m. on June 29, 2013 and 12 a.m. on June 30, 2013, with a rain date of June 30, 2013 and July 1, 2013. Reynolds Creek has commercial and recreational vessel traffic. No objections were received from the waterway users. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated deviation period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: June 11, 2013. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. 2013–14789 Filed 6–20–13; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG–2012–0375] Safety Zone; Milwaukee Harbor, Milwaukee, WI Coast Guard, DHS. Notice of enforcement of regulation. AGENCY: ACTION: The Coast Guard will enforce the safety zone for annual fireworks events in the Captain of the Port, Lake Michigan zone at specified times from June 15, 2013, until September 7, 2013. SUMMARY: E:\FR\FM\21JNR1.SGM 21JNR1

Agencies

[Federal Register Volume 78, Number 120 (Friday, June 21, 2013)]
[Rules and Regulations]
[Page 37456]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-14789]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[USCG-2013-0426]


Drawbridge Operation Regulations; Reynolds Channel, Nassau, NY

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, First Coast Guard District, has issued a 
temporary deviation from the regulation governing the operation of the 
Long Beach Bridge, mile 4.7, across Reynolds Channel at Nassau, New 
York. Under this temporary deviation, the bridge may remain in the 
closed position for two and a half hours to facilitate a public event, 
the Town of Hempstead Annual Fireworks Display.

DATES: This deviation is effective between 9:30 p.m. and 12 a.m. on 
June 29, 2013 and June 30, 2013.

ADDRESSES: The docket for this deviation, [USCG-2013-0426] is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation. You may also visit the Docket 
Management Facility in Room W12-140, on the ground floor of the 
Department of Transportation West Building, 1200 New Jersey Avenue SE., 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Ms. Judy Leung-Yee, Project Officer, 
First Coast Guard District, judy.k.leung-yee@uscg.mil, or (212) 668-
7165. If you have questions on viewing the docket, call Barbara 
Hairston, Program Manager, Docket Operations, telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: The Long Beach Bridge has a vertical 
clearance of 20 feet at mean high water, and 24 feet at mean low water 
in the closed position. The existing drawbridge operating regulations 
are found at 33 CFR 117.799(g).
    The bridge owner, the County of Nassau Department of Public Works, 
requested a bridge closure to facilitate a public event, the Town of 
Hempstead Annual Salute to Veterans Fireworks Display.
    Under this temporary deviation, the Long Beach Bridge may remain in 
the closed position between 9:30 p.m. on June 29, 2013 and 12 a.m. on 
June 30, 2013, with a rain date of June 30, 2013 and July 1, 2013.
    Reynolds Creek has commercial and recreational vessel traffic. No 
objections were received from the waterway users.
    In accordance with 33 CFR 117.35(e), the bridge must return to its 
regular operating schedule immediately at the end of the designated 
deviation period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: June 11, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.