Notice of Commission Staff Attendance, 36770-36771 [2013-14545]
Download as PDF
36770
Federal Register / Vol. 78, No. 118 / Wednesday, June 19, 2013 / Notices
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on July 12, 2013.
Dated: June 12, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–14543 Filed 6–18–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–488–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
ANR Pipeline Company; Notice of
Request Under Blanket Authorization
Take that on May 31, 2013, ANR
Pipeline Company (ANR), 717 Texas
Street, Houston, Texas 77002–2761,
filed in Docket No. CP13–488–000, a
Prior Notice request pursuant to
Sections 157.205, and 157.216 (b) of the
Commission’s Regulations under the
Natural Gas Act, and ANR’s blanket
certificate issued in Docket No. CP82–
480, for authorization to abandon four
wells in the Lincoln-Freeman Storage
Field in Clare County, Michigan.
VerDate Mar<15>2010
17:13 Jun 18, 2013
Jkt 229001
Specifically, ANR proposes to abandon
the Buccanning 51, Callihan 52, and
Frackelton 56 injection/withdrawal
wells, the Lincoln 106 observation well,
and related laterals and appurtenances
in order to remediate mechanical
integrity concerns at the wells, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to Linda
Farquhar, Manager, Project
Determinations & Regulatory
Administration, ANR Pipeline
Company, 717 Texas Street, Houston,
Texas, 77002–2761, at (832) 320–5685
or fax (832) 320–5705 or
linda_farquhar@transcanada.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with he Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Commission) and ill not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 5 copies of the
protest or intervention to the Federal
Energy regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Dated: June 12, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–14544 Filed 6–18–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following stakeholder meeting related to
the transmission planning activities of
PJM Interconnection, L.L.C.;
Midcontinent Independent System
Operator; New York Independent
System Operator, Inc.; and the
Southeastern Regional Transmission
Planning regions.
Transmission Owner Order No. 1000
Interregional Cost Allocation Proposal
Conference Call
June 17, 2013, 3:00 p.m.–5:00 p.m.,
Local Time
The above-referenced meeting will be
held over conference call.
The above-referenced meeting is open
to stakeholders.
Further information may be found at
https://www.pjm.com/committees-andgroups/committees/toa-ac.aspx.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. EL10–52, Central
Transmission, LLC v. PJM
Interconnection, L.L.C.
Docket No. EL12–69, Primary Power
LLC v. PJM Interconnection, L.L.C.
Docket No. ER08–1281, New York
Independent System Operator, Inc.
Docket No. ER10–253 and EL10–14,
Primary Power, L.L.C.
E:\FR\FM\19JNN1.SGM
19JNN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 118 / Wednesday, June 19, 2013 / Notices
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1178, PJM
Interconnection, L.L.C.
Docket No. ER13–102, New York
Independent System Operator, Inc.
Docket No. ER13–104, Florida Power &
Light Company
Docket No. ER13–1052, PJM
Interconnection, L.L.C. and the
Midwest Independent Transmission
System Operator, Inc.
Docket No. ER13–1054, PJM
Interconnection, L.L.C. and the
Midwest Independent Transmission
System Operator, Inc.
Docket No. ER13–107, South Carolina
Electric & Gas Company
Docket No. ER13–1221, Mississippi
Power Company
Docket No. ER13–193, ISO New England
Inc.
Docket No. ER13–195, Indicated PJM
Transmission Owners
Docket No. ER13–196, ISO New England
Inc.
Docket No. ER13–198, PJM
Interconnection, L.L.C
Docket No. ER13–397, PJM
Interconnection, L.L.C.
Docket No. ER13–673, PJM
Interconnection, L.L.C
Docket No. ER13–703, PJM
Interconnection, L.L.C.
Docket No. ER13–80, Tampa Electric
Company
Docket No. ER13–83, Duke Energy
Carolinas LLC and Carolina Power &
Light Company
Docket No. ER13–84, Cleco Power LLC
Docket No. ER13–86, Florida Power
Corporation
Docket No. ER13–88, Alcoa Power
Generating, Inc.
Docket No. ER13–887, PJM
Interconnection, L.L.C.
Docket No. ER13–897, Louisville Gas
and Electric Company and Kentucky
Utilities Company
Docket No. ER13–90, Public Service
Electric and Gas Company and PJM
Interconnection, L.L.C.
Docket No. ER13–908, Alabama Power
Company et al.
Docket No. ER13–913, Ohio Valley
Electric Corporation
Docket No. ER13–95, Entergy Arkansas,
Inc.
For Further Information Contact:
Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6604 or jonathan.fernandez@ferc.gov.
Dated: June 12, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–14545 Filed 6–18–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:13 Jun 18, 2013
Jkt 229001
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2012–0654; FRL–9531–8]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; NSPS for Automobile and
Light Duty Truck Surface Coating
Operations (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: In compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.), this document announces
that an Information Collection Request
(ICR) has been forwarded to the Office
of Management and Budget (OMB) for
review and approval. This is a request
to renew an existing approved
collection. The ICR which is abstracted
below describes the nature of the
collection and the estimated burden and
cost.
DATES: Additional comments may be
submitted on or before July 19, 2013.
ADDRESSES: Submit your comments,
referencing docket ID number EPA–HQ–
OECA–2012–0654, to: (1) EPA online,
using www.regulations.gov (our
preferred method), or by email to:
docket.oeca@epa.gov, or by mail to: EPA
Docket Center (EPA/DC), Environmental
Protection Agency, Enforcement and
Compliance Docket and Information
Center, mail code 28221T, 1200
Pennsylvania Avenue NW., Washington,
DC 20460; and (2) OMB at: Office of
Information and Regulatory Affairs,
Office of Management and Budget
(OMB), Attention: Desk Officer for EPA,
725 17th Street NW., Washington, DC
20503.
FOR FURTHER INFORMATION CONTACT:
Learia Williams, Monitoring,
Assistance, and Media Programs
Division, Office of Compliance, Mail
Code 2227A, Environmental Protection
Agency, 1200 Pennsylvania Avenue
NW., Washington, DC 20460; telephone
number: (202) 564–4113; fax number:
(202) 564–0050; email address:
williams.learia@epa.gov.
EPA has
submitted the following ICR to OMB for
review and approval according to the
procedures prescribed in 5 CFR 1320.12.
On October 17, 2012 (77 FR 63813), EPA
sought comments on this ICR pursuant
to 5 CFR 1320.8(d). EPA received no
comments. Any additional comments on
this ICR should be submitted to both
EPA and OMB within 30 days of this
notice.
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
36771
EPA has established a public docket
for this ICR under docket ID number
EPA–HQ–OECA–2012–0654, which is
available for either public viewing
online at https://www.regulations.gov, or
in person viewing at the Enforcement
and Compliance Docket in the EPA
Docket Center (EPA/DC), EPA West,
Room 3334, 1301 Constitution Avenue
NW., Washington, DC. The EPA Docket
Center Public Reading Room is open
from 8:30 a.m. to 4:30 p.m., Monday
through Friday, excluding legal
holidays. The telephone number for the
Reading Room is (202) 566–1744, and
the telephone number for the
Enforcement and Compliance Docket is
(202) 566–1752.
Use EPA’s electronic docket and
comment system at https://
www.regulations.gov to either submit or
view public comments, access the index
listing of the contents of the docket, and
to access those documents in the docket
that are available electronically. Once in
the system, select ‘‘docket search,’’ then
key in the docket ID number identified
above. Please note that EPA’s policy is
that public comments, whether
submitted electronically or in paper,
will be made available for public
viewing at https://www.regulations.gov
as EPA receives them and without
change, unless the comment contains
copyrighted material, Confidentiality of
Business Information (CBI), or other
information whose public disclosure is
restricted by statute. For further
information about the electronic docket,
go to www.regulations.gov.
Title: NSPS for Automobile and Light
Duty Truck Surface Coating Operations
(Renewal)
ICR Numbers: EPA ICR Number
1064.17, OMB Control Number 2060–
0034
ICR Status: This ICR is scheduled to
expire on June 30, 2013. Under OMB
regulations, the Agency may continue to
either conduct or sponsor the collection
of information while this submission is
pending at OMB.
Abstract: The affected entities are
subject to the General Provisions of the
NSPS at 40 CFR part 60, subpart A, and
any changes, or additions to the
Provisions specified at 40 CFR part 60,
subpart MM. Owners or operators of the
affected facilities must submit an initial
notification report, performance tests,
and periodic reports and results.
Owners or operators are also required to
maintain records of the occurrence and
duration of any startup, shutdown, or
malfunction in the operation of an
affected facility, or any period during
which the monitoring system is
inoperative. Reports are required
semiannually at a minimum.
E:\FR\FM\19JNN1.SGM
19JNN1
Agencies
[Federal Register Volume 78, Number 118 (Wednesday, June 19, 2013)]
[Notices]
[Pages 36770-36771]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-14545]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission's staff may attend the following
stakeholder meeting related to the transmission planning activities of
PJM Interconnection, L.L.C.; Midcontinent Independent System Operator;
New York Independent System Operator, Inc.; and the Southeastern
Regional Transmission Planning regions.
Transmission Owner Order No. 1000 Interregional Cost Allocation
Proposal Conference Call
June 17, 2013, 3:00 p.m.-5:00 p.m., Local Time
The above-referenced meeting will be held over conference call.
The above-referenced meeting is open to stakeholders.
Further information may be found at https://www.pjm.com/committees-and-groups/committees/toa-ac.aspx.
The discussions at the meeting described above may address matters
at issue in the following proceedings:
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. EL10-52, Central Transmission, LLC v. PJM Interconnection,
L.L.C.
Docket No. EL12-69, Primary Power LLC v. PJM Interconnection, L.L.C.
Docket No. ER08-1281, New York Independent System Operator, Inc.
Docket No. ER10-253 and EL10-14, Primary Power, L.L.C.
[[Page 36771]]
Docket No. ER11-1844, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-1178, PJM Interconnection, L.L.C.
Docket No. ER13-102, New York Independent System Operator, Inc.
Docket No. ER13-104, Florida Power & Light Company
Docket No. ER13-1052, PJM Interconnection, L.L.C. and the Midwest
Independent Transmission System Operator, Inc.
Docket No. ER13-1054, PJM Interconnection, L.L.C. and the Midwest
Independent Transmission System Operator, Inc.
Docket No. ER13-107, South Carolina Electric & Gas Company
Docket No. ER13-1221, Mississippi Power Company
Docket No. ER13-193, ISO New England Inc.
Docket No. ER13-195, Indicated PJM Transmission Owners
Docket No. ER13-196, ISO New England Inc.
Docket No. ER13-198, PJM Interconnection, L.L.C
Docket No. ER13-397, PJM Interconnection, L.L.C.
Docket No. ER13-673, PJM Interconnection, L.L.C
Docket No. ER13-703, PJM Interconnection, L.L.C.
Docket No. ER13-80, Tampa Electric Company
Docket No. ER13-83, Duke Energy Carolinas LLC and Carolina Power &
Light Company
Docket No. ER13-84, Cleco Power LLC
Docket No. ER13-86, Florida Power Corporation
Docket No. ER13-88, Alcoa Power Generating, Inc.
Docket No. ER13-887, PJM Interconnection, L.L.C.
Docket No. ER13-897, Louisville Gas and Electric Company and Kentucky
Utilities Company
Docket No. ER13-90, Public Service Electric and Gas Company and PJM
Interconnection, L.L.C.
Docket No. ER13-908, Alabama Power Company et al.
Docket No. ER13-913, Ohio Valley Electric Corporation
Docket No. ER13-95, Entergy Arkansas, Inc.
For Further Information Contact: Jonathan Fernandez, Office of
Energy Market Regulation, Federal Energy Regulatory Commission at (202)
502-6604 or jonathan.fernandez@ferc.gov.
Dated: June 12, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-14545 Filed 6-18-13; 8:45 am]
BILLING CODE 6717-01-P