Notice of Effectiveness of Exempt Wholesale Generator Status, 35622 [2013-14059]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
35622
Federal Register / Vol. 78, No. 114 / Thursday, June 13, 2013 / Notices
Company, on behalf of The Connecticut
Light and Power Company, Notice of
Cancellation of Original Service
Agreement No. LGIA–ISONE/NU–06–
02.
Filed Date: 6/5/13.
Accession Number: 20130605–5060.
Comments Due: 5 p.m. ET 6/26/13.
Docket Numbers: ER13–1637–000.
Applicants: PacifiCorp.
Description: OATT Revised
Attachment C (6/5/13) to be effective
6/6/2013.
Filed Date: 6/5/13.
Accession Number: 20130605–5067.
Comments Due: 5 p.m. ET 6/26/13.
Docket Numbers: ER13–1638–000.
Applicants: Public Service Company
of Colorado.
Description: 2013–06–05_TSGTComanche Telecom 344 to be effective
8/5/2013.
Filed Date: 6/5/13.
Accession Number: 20130605–5084.
Comments Due: 5 p.m. ET 6/26/13.
Docket Numbers: ER13–1639–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Original Service
Agreement No. 3569—Queue Position
X2–012 to be effective 5/6/2013.
Filed Date: 6/5/13.
Accession Number: 20130605–5099.
Comments Due: 5 p.m. ET 6/26/13.
Docket Numbers: ER13–741–002.
Applicants: ISO New England Inc.,
Bangor Hydro Electric Company.
Description: Oakfield LGIA
Supplemental Compliance Filing to be
effective N/A.
Filed Date: 6/5/13.
Accession Number: 20130605–5045.
Comments Due: 5 p.m. ET 6/26/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Mar<15>2010
16:58 Jun 12, 2013
Jkt 229001
Dated: June 5, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on July 8,
2013.
[FR Doc. 2013–14008 Filed 6–12–13; 8:45 am]
This notice is being sent to the
BILLING CODE 6717–01–P
Commission’s current environmental
mailing list for this project. State and
local government representatives should
DEPARTMENT OF ENERGY
notify their constituents of this
Federal Energy Regulatory
proposed project and encourage them to
Commission
comment on their areas of concern.
Northwest provided landowners
[ Docket Nos. EG13–17–000 et al.]
adjacent to the proposed meter station
Notice of Effectiveness of Exempt
with a fact sheet prepared by the FERC
Wholesale Generator Status
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
Docket Nos.
To Know.’’ This fact sheet addresses a
number of typically-asked questions,
CPV Shore, LLC ................... EG13–17–000
including how to participate in the
Goldwaite Wind Energy LLC
EG13–18–000
Patua Project LLC ................ EG13–19–000 Commission’s proceedings. It is also
Alta Wind X, LLC .................. EG13–21–000 available for viewing on the FERC Web
Alta Wind XI, LLC ................. EG13–22–000 site (www.ferc.gov).
Take notice that during the month of
May 2013, the status of the abovecaptioned entities as Exempt Wholesale
Generators Companies became effective
by operation of the Commission’s
regulations, 18 CFR 366.7(a).
Dated: June 7, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–14059 Filed 6–12–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–160–000]
Northwest Pipeline GP; Notice of Intent
To Prepare an Environmental
Assessment for the Proposed Blue
Water LNG Meter Station and Request
for Comments on Environmental
Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Blue Water Liquefied Natural Gas
(LNG) Meter Project involving
construction and operation of facilities
by Northwest Pipeline GP (Northwest)
in Benton County, Washington. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Summary of the Proposed Project
Northwest proposes to construct and
operate a new LNG meter station and
associated piping within the yard of its
existing Plymouth Peak Shaving Plant
(Plant). The Plant is located on about 72
acres on the north side of the Columbia
River in Benton County, Washington,
about 19 miles south of the city of
Kennewick. The Plant consists of two
LNG storage tanks with a capacity of 1.2
billion cubic feet each, two liquefaction
trains capable of liquefying 12 million
standard cubic feet per day of natural
gas, vaporization facilities capable of
vaporizing 305,300 dekatherms of
natural gas per day (Dth/d), and a boiloff gas compression system.1
The proposed Blue Water LNG Meter
could supply up to 216,000 gallons of
LNG per day (or 17,705 Dth/d) to
Transfuels LLC (Transfuels). Transfuels
proposes to construct and operate a nonjurisdictional LNG trunk loading facility
on 20 acres of current agricultural land
directly north of the fenced boundary
for Northwest’s Plant. The jurisdictional
facilities proposed by Northwest would
include:
• A new 360-foot-long pipeline,
supported on a pipe rack, to convey
LNG from the existing transfer pipeline
between the storage tanks, through the
new meter runs, and then to the custody
transfer point at the plant boundary
fence;
• Three new 32-foot-long meter runs
and a one-inch-diameter receipt meter
and three-inch-diameter piping to
handle boil-off-gas coming back from
the custody transfer point, all covered
by a 20-foot by 24-foot shelter;
1 These facilities were authorized by the FERC in
Docket Nos. CP74–46–000 and CP76–106–000.
E:\FR\FM\13JNN1.SGM
13JNN1
Agencies
[Federal Register Volume 78, Number 114 (Thursday, June 13, 2013)]
[Notices]
[Page 35622]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-14059]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ Docket Nos. EG13-17-000 et al.]
Notice of Effectiveness of Exempt Wholesale Generator Status
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
CPV Shore, LLC.......................................... EG13-17-000
Goldwaite Wind Energy LLC............................... EG13-18-000
Patua Project LLC....................................... EG13-19-000
Alta Wind X, LLC........................................ EG13-21-000
Alta Wind XI, LLC....................................... EG13-22-000
------------------------------------------------------------------------
Take notice that during the month of May 2013, the status of the
above-captioned entities as Exempt Wholesale Generators Companies
became effective by operation of the Commission's regulations, 18 CFR
366.7(a).
Dated: June 7, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-14059 Filed 6-12-13; 8:45 am]
BILLING CODE 6717-01-P