Notice of Effectiveness of Exempt Wholesale Generator Status, 35622 [2013-14059]

Download as PDF tkelley on DSK3SPTVN1PROD with NOTICES 35622 Federal Register / Vol. 78, No. 114 / Thursday, June 13, 2013 / Notices Company, on behalf of The Connecticut Light and Power Company, Notice of Cancellation of Original Service Agreement No. LGIA–ISONE/NU–06– 02. Filed Date: 6/5/13. Accession Number: 20130605–5060. Comments Due: 5 p.m. ET 6/26/13. Docket Numbers: ER13–1637–000. Applicants: PacifiCorp. Description: OATT Revised Attachment C (6/5/13) to be effective 6/6/2013. Filed Date: 6/5/13. Accession Number: 20130605–5067. Comments Due: 5 p.m. ET 6/26/13. Docket Numbers: ER13–1638–000. Applicants: Public Service Company of Colorado. Description: 2013–06–05_TSGTComanche Telecom 344 to be effective 8/5/2013. Filed Date: 6/5/13. Accession Number: 20130605–5084. Comments Due: 5 p.m. ET 6/26/13. Docket Numbers: ER13–1639–000. Applicants: PJM Interconnection, L.L.C. Description: Original Service Agreement No. 3569—Queue Position X2–012 to be effective 5/6/2013. Filed Date: 6/5/13. Accession Number: 20130605–5099. Comments Due: 5 p.m. ET 6/26/13. Docket Numbers: ER13–741–002. Applicants: ISO New England Inc., Bangor Hydro Electric Company. Description: Oakfield LGIA Supplemental Compliance Filing to be effective N/A. Filed Date: 6/5/13. Accession Number: 20130605–5045. Comments Due: 5 p.m. ET 6/26/13. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. VerDate Mar<15>2010 16:58 Jun 12, 2013 Jkt 229001 Dated: June 5, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. staff determine what issues they need to evaluate in the EA. Please note that the scoping period will close on July 8, 2013. [FR Doc. 2013–14008 Filed 6–12–13; 8:45 am] This notice is being sent to the BILLING CODE 6717–01–P Commission’s current environmental mailing list for this project. State and local government representatives should DEPARTMENT OF ENERGY notify their constituents of this Federal Energy Regulatory proposed project and encourage them to Commission comment on their areas of concern. Northwest provided landowners [ Docket Nos. EG13–17–000 et al.] adjacent to the proposed meter station Notice of Effectiveness of Exempt with a fact sheet prepared by the FERC Wholesale Generator Status entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need Docket Nos. To Know.’’ This fact sheet addresses a number of typically-asked questions, CPV Shore, LLC ................... EG13–17–000 including how to participate in the Goldwaite Wind Energy LLC EG13–18–000 Patua Project LLC ................ EG13–19–000 Commission’s proceedings. It is also Alta Wind X, LLC .................. EG13–21–000 available for viewing on the FERC Web Alta Wind XI, LLC ................. EG13–22–000 site (www.ferc.gov). Take notice that during the month of May 2013, the status of the abovecaptioned entities as Exempt Wholesale Generators Companies became effective by operation of the Commission’s regulations, 18 CFR 366.7(a). Dated: June 7, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–14059 Filed 6–12–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13–160–000] Northwest Pipeline GP; Notice of Intent To Prepare an Environmental Assessment for the Proposed Blue Water LNG Meter Station and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Blue Water Liquefied Natural Gas (LNG) Meter Project involving construction and operation of facilities by Northwest Pipeline GP (Northwest) in Benton County, Washington. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help the Commission PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 Summary of the Proposed Project Northwest proposes to construct and operate a new LNG meter station and associated piping within the yard of its existing Plymouth Peak Shaving Plant (Plant). The Plant is located on about 72 acres on the north side of the Columbia River in Benton County, Washington, about 19 miles south of the city of Kennewick. The Plant consists of two LNG storage tanks with a capacity of 1.2 billion cubic feet each, two liquefaction trains capable of liquefying 12 million standard cubic feet per day of natural gas, vaporization facilities capable of vaporizing 305,300 dekatherms of natural gas per day (Dth/d), and a boiloff gas compression system.1 The proposed Blue Water LNG Meter could supply up to 216,000 gallons of LNG per day (or 17,705 Dth/d) to Transfuels LLC (Transfuels). Transfuels proposes to construct and operate a nonjurisdictional LNG trunk loading facility on 20 acres of current agricultural land directly north of the fenced boundary for Northwest’s Plant. The jurisdictional facilities proposed by Northwest would include: • A new 360-foot-long pipeline, supported on a pipe rack, to convey LNG from the existing transfer pipeline between the storage tanks, through the new meter runs, and then to the custody transfer point at the plant boundary fence; • Three new 32-foot-long meter runs and a one-inch-diameter receipt meter and three-inch-diameter piping to handle boil-off-gas coming back from the custody transfer point, all covered by a 20-foot by 24-foot shelter; 1 These facilities were authorized by the FERC in Docket Nos. CP74–46–000 and CP76–106–000. E:\FR\FM\13JNN1.SGM 13JNN1

Agencies

[Federal Register Volume 78, Number 114 (Thursday, June 13, 2013)]
[Notices]
[Page 35622]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-14059]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[ Docket Nos. EG13-17-000 et al.]


Notice of Effectiveness of Exempt Wholesale Generator Status

 
------------------------------------------------------------------------
                                                            Docket Nos.
------------------------------------------------------------------------
CPV Shore, LLC..........................................     EG13-17-000
Goldwaite Wind Energy LLC...............................     EG13-18-000
Patua Project LLC.......................................     EG13-19-000
Alta Wind X, LLC........................................     EG13-21-000
Alta Wind XI, LLC.......................................     EG13-22-000
------------------------------------------------------------------------

    Take notice that during the month of May 2013, the status of the 
above-captioned entities as Exempt Wholesale Generators Companies 
became effective by operation of the Commission's regulations, 18 CFR 
366.7(a).

    Dated: June 7, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-14059 Filed 6-12-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.