Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions to Intervene, And Protests, 35015-35016 [2013-13812]

Download as PDF Federal Register / Vol. 78, No. 112 / Tuesday, June 11, 2013 / Notices Order No. Date issued FE Docket No. Authorization holder Description of action Nexen Energy Marketing Services U.S.A. Inc. APS-American Power Supply, LLC. Order granting blanket authority to import/export natural gas from/to Canada/Mexico. Order granting blanket authority to import natural gas from Canada and to import LNG from various international sources by vessel. Order granting blanket authority to import/export natural gas from/to Canada. Order granting blanket authority to import LNG from Canada by truck. Order granting blanket authority to import/export natural gas from/to Canada. Order granting blanket authority to import natural gas from Canada. Order granting blanket authority to import/export natural gas from/to Canada/Mexico. Order granting blanket authority to import LNG from various international sources by vessel. Order granting blanket authority to import/export natural gas from/to Canada. 3265 ............. 04/12/13 13–35–NG 3266 ............. 04/12/13 13–38–LNG 3267 ............. 04/12/13 13–39–NG 3268 ............. 04/12/13 13–40–LNG 3269 ............. 04/12/13 13–41–NG 3270 ............. 04/12/13 13–43–NG 3271 ............. 04/12/13 13–44–NG Cascade Natural Gas Corporation. Encana Marketing (USA) Inc. 3272 ............. 04/12/13 13–45–LNG Citigroup Energy Inc. ............. 3273 ............. 04/12/13 11–46–NG Centra Gas Manitoba Inc. ..... [FR Doc. 2013–13789 Filed 6–10–13; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2146–140] wreier-aviles on DSK5TPTVN1PROD with NOTICES Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions to Intervene, And Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-project use of project lands and waters. b. Project No: 2146–140. c. Date Filed: April 16, 2013. d. Applicant: Alabama Power Company. e. Name of Project: Coosa River Hydroelectric Project. f. Location: Coosa River near the city of Gadsden, in Etowah County, in northeastern Alabama. g. Filed Pursuant to: Federal Power Act, 16 U.S.C .791a–825r. h. Applicant Contact: Ms. Amy J. Stewart, PE, Team Leader, Alabama Power Company, 600 18th Street North, Birmingham, AL 35203–8180, (205) 257–1000. i. FERC Contact: Mary Karwoski, (202) 502–6543, or email: mary.karwoski@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: July 8, 2013. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ VerDate Mar<15>2010 15:13 Jun 10, 2013 Jkt 229001 CP Energy Marketing (US) Inc. Gaz Metro Solutions Transport. Mieco Inc. .............................. efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P–2146–140) on any comments or motions filed. k. Description of Application: Alabama Power Company requests Commission approval to grant River Country Campground a permit to use project lands and waters to construct two forty-foot fishing piers with no cleats and a pier with twelve boat slips accommodating up to fifty watercraft. The proposed boat slips are each 22 feet wide by 24 feet long and can accommodate up to four personal watercraft (including but not limited to jet-skis), plus two watercraft on the end. River Country Campground operates an existing RV Campground on the NeelyHenry Development in Gadsden, Alabama. The facility currently includes a single lane boat ramp, a courtesy dock accommodating up to six watercraft, three wooden docks with no cleats, riprap along the shoreline, and two water intake structures for irrigation. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the PO 00000 35015 Frm 00042 Fmt 4703 Sfmt 4703 ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field (P–2146) to access the document. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; E:\FR\FM\11JNN1.SGM 11JNN1 35016 Federal Register / Vol. 78, No. 112 / Tuesday, June 11, 2013 / Notices and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervener must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: June 4, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–13812 Filed 6–10–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14490–000] wreier-aviles on DSK5TPTVN1PROD with NOTICES FFP Project 118, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On February 1, 2013, FFP Project 118, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project located at the U.S. Army Corps of Engineers’ (Corps) Green River Lock & Dam #1, located on the Green River near the town of Henderson in Henderson County, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 650-foot-long, 320foot-wide intake channel with a 150foot-long retaining wall; (2) a 400-footlong crest dam extension connecting the existing dam to the new powerhouse; (3) a 160-foot-long, 120-foot-wide powerhouse containing two generating units with a total capacity of 5.6 megawatts; (4) a 220-foot-long, 160-footwide tailrace with a 75-foot-long retaining wall; (5) a 4.16/69 kilo-volt (kV) substation; (6) a 310-foot-long access road to the powerhouse and substation; (7) a 2.0-mile-long, 69kV transmission line. The proposed project would have an average annual generation of 27,000 megawatt-hours, and operate as directed by the Corps. VerDate Mar<15>2010 15:13 Jun 10, 2013 Jkt 229001 Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283–2822. FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202) 502– 8577. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14490) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: June 5, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–13807 Filed 6–10–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–2159–003. Applicants: Canadian Hills Wind, LLC. PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 Description: Notice of Non-Material Change in Status of Canadian Hills Wind, LLC. Filed Date: 6/3/13. Accession Number: 20130603–5167. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–535–003. Applicants: PJM Interconnection, L.L.C. Description: Compliance Filing to 5/2/ 2013 MOPR Order in ER13–535–000, 001 to be effective 2/5/2013. Filed Date: 6/3/13. Accession Number: 20130603–5162. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–692–004. Applicants: Midcontinent Independent System Operator, Inc. Description: 06–03–2013 OASIS Compliance Filing to be effective 6/4/ 2013. Filed Date: 6/4/13. Accession Number: 20130604–5000. Comments Due: 5 p.m. ET 6/25/13. Docket Numbers: ER13–983–000. Applicants: Arizona Public Service Company. Description: Refund Report for MPP Westwing Substation Interconnection Construction Agreement to be effective N/A. Filed Date: 6/3/13. Accession Number: 20130603–5147. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1346–000. Applicants: Mesa Wind Power Corporation. Description: Supplement to April 26, 2013 Mesa Wind Power Corporation tariff filing. Filed Date: 6/3/13. Accession Number: 20130603–5120. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1630–000. Applicants: California Independent System Operator Corporation, AES Huntington Beach, L.L.C. Description: Amendments to RMR Agreement to be effective 6/26/2013. Filed Date: 6/3/13. Accession Number: 20130603–5161. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1631–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Request for Waiver of certain tariff provisions of Midcontinent Independent System Operator, Inc. Filed Date: 6/4/13. Accession Number: 20130604–5039. Comments Due: 5 p.m. ET 6/25/13. Docket Numbers: ER13–1632–000. Applicants: Chandler Wind Partners, LLC. Description: Chandler Wind Partners, LLC submits First Revised MBR to be effective 6/5/2013. E:\FR\FM\11JNN1.SGM 11JNN1

Agencies

[Federal Register Volume 78, Number 112 (Tuesday, June 11, 2013)]
[Notices]
[Pages 35015-35016]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13812]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2146-140]


Alabama Power Company; Notice of Application Accepted for Filing, 
Soliciting Comments, Motions to Intervene, And Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Non-project use of project lands and waters.
    b. Project No: 2146-140.
    c. Date Filed: April 16, 2013.
    d. Applicant: Alabama Power Company.
    e. Name of Project: Coosa River Hydroelectric Project.
    f. Location: Coosa River near the city of Gadsden, in Etowah 
County, in northeastern Alabama.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C .791a-825r.
    h. Applicant Contact: Ms. Amy J. Stewart, PE, Team Leader, Alabama 
Power Company, 600 18th Street North, Birmingham, AL 35203-8180, (205) 
257-1000.
    i. FERC Contact: Mary Karwoski, (202) 502-6543, or email: 
mary.karwoski@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: July 8, 2013.
    All documents may be filed electronically via the Internet. See, 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be 
filed electronically, documents may be paper-filed. To paper-file, an 
original and seven copies should be mailed to: Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426. Commenters can submit brief comments up to 6,000 characters, 
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and 
contact information at the end of your comments. Please include the 
project number (P-2146-140) on any comments or motions filed.
    k. Description of Application: Alabama Power Company requests 
Commission approval to grant River Country Campground a permit to use 
project lands and waters to construct two forty-foot fishing piers with 
no cleats and a pier with twelve boat slips accommodating up to fifty 
watercraft. The proposed boat slips are each 22 feet wide by 24 feet 
long and can accommodate up to four personal watercraft (including but 
not limited to jet-skis), plus two watercraft on the end. River Country 
Campground operates an existing RV Campground on the Neely-Henry 
Development in Gadsden, Alabama. The facility currently includes a 
single lane boat ramp, a courtesy dock accommodating up to six 
watercraft, three wooden docks with no cleats, rip-rap along the 
shoreline, and two water intake structures for irrigation.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field (P-2146) to access the document. You 
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the 
address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening;

[[Page 35016]]

and (4) otherwise comply with the requirements of 18 CFR 385.2001 
through 385.2005. All comments, motions to intervene, or protests must 
set forth their evidentiary basis. Any filing made by an intervener 
must be accompanied by proof of service on all persons listed in the 
service list prepared by the Commission in this proceeding, in 
accordance with 18 CFR 385.2010.

    Dated: June 4, 2013.
Kimberly D. Bose,
Secretary.