FFP Project 118, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications, 35016 [2013-13807]
Download as PDF
35016
Federal Register / Vol. 78, No. 112 / Tuesday, June 11, 2013 / Notices
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervener must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: June 4, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13812 Filed 6–10–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14490–000]
wreier-aviles on DSK5TPTVN1PROD with NOTICES
FFP Project 118, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions to Intervene, and
Competing Applications
On February 1, 2013, FFP Project 118,
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
hydropower project located at the U.S.
Army Corps of Engineers’ (Corps) Green
River Lock & Dam #1, located on the
Green River near the town of Henderson
in Henderson County, Kentucky. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A 650-foot-long, 320foot-wide intake channel with a 150foot-long retaining wall; (2) a 400-footlong crest dam extension connecting the
existing dam to the new powerhouse; (3)
a 160-foot-long, 120-foot-wide
powerhouse containing two generating
units with a total capacity of 5.6
megawatts; (4) a 220-foot-long, 160-footwide tailrace with a 75-foot-long
retaining wall; (5) a 4.16/69 kilo-volt
(kV) substation; (6) a 310-foot-long
access road to the powerhouse and
substation; (7) a 2.0-mile-long, 69kV
transmission line. The proposed project
would have an average annual
generation of 27,000 megawatt-hours,
and operate as directed by the Corps.
VerDate Mar<15>2010
15:13 Jun 10, 2013
Jkt 229001
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power
Corporation, 239 Causeway Street, Suite
300, Boston, MA 02114. (978) 283–2822.
FERC Contact: Christiane Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14490) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: June 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13807 Filed 6–10–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–2159–003.
Applicants: Canadian Hills Wind,
LLC.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Description: Notice of Non-Material
Change in Status of Canadian Hills
Wind, LLC.
Filed Date: 6/3/13.
Accession Number: 20130603–5167.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–535–003.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance Filing to 5/2/
2013 MOPR Order in ER13–535–000,
001 to be effective 2/5/2013.
Filed Date: 6/3/13.
Accession Number: 20130603–5162.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–692–004.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 06–03–2013 OASIS
Compliance Filing to be effective 6/4/
2013.
Filed Date: 6/4/13.
Accession Number: 20130604–5000.
Comments Due: 5 p.m. ET 6/25/13.
Docket Numbers: ER13–983–000.
Applicants: Arizona Public Service
Company.
Description: Refund Report for MPP
Westwing Substation Interconnection
Construction Agreement to be effective
N/A.
Filed Date: 6/3/13.
Accession Number: 20130603–5147.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1346–000.
Applicants: Mesa Wind Power
Corporation.
Description: Supplement to April 26,
2013 Mesa Wind Power Corporation
tariff filing.
Filed Date: 6/3/13.
Accession Number: 20130603–5120.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1630–000.
Applicants: California Independent
System Operator Corporation, AES
Huntington Beach, L.L.C.
Description: Amendments to RMR
Agreement to be effective 6/26/2013.
Filed Date: 6/3/13.
Accession Number: 20130603–5161.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1631–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Request for Waiver of
certain tariff provisions of Midcontinent
Independent System Operator, Inc.
Filed Date: 6/4/13.
Accession Number: 20130604–5039.
Comments Due: 5 p.m. ET 6/25/13.
Docket Numbers: ER13–1632–000.
Applicants: Chandler Wind Partners,
LLC.
Description: Chandler Wind Partners,
LLC submits First Revised MBR to be
effective 6/5/2013.
E:\FR\FM\11JNN1.SGM
11JNN1
Agencies
[Federal Register Volume 78, Number 112 (Tuesday, June 11, 2013)]
[Notices]
[Page 35016]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13807]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14490-000]
FFP Project 118, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions to Intervene, and
Competing Applications
On February 1, 2013, FFP Project 118, LLC filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of a hydropower project
located at the U.S. Army Corps of Engineers' (Corps) Green River Lock &
Dam 1, located on the Green River near the town of Henderson
in Henderson County, Kentucky. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land-disturbing
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
The proposed project would consist of the following: (1) A 650-
foot-long, 320-foot-wide intake channel with a 150-foot-long retaining
wall; (2) a 400-foot-long crest dam extension connecting the existing
dam to the new powerhouse; (3) a 160-foot-long, 120-foot-wide
powerhouse containing two generating units with a total capacity of 5.6
megawatts; (4) a 220-foot-long, 160-foot-wide tailrace with a 75-foot-
long retaining wall; (5) a 4.16/69 kilo-volt (kV) substation; (6) a
310-foot-long access road to the powerhouse and substation; (7) a 2.0-
mile-long, 69kV transmission line. The proposed project would have an
average annual generation of 27,000 megawatt-hours, and operate as
directed by the Corps.
Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power
Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114. (978)
283-2822.
FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202)
502-8577.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and five copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14490) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: June 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-13807 Filed 6-10-13; 8:45 am]