FFP Project 55, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 35020 [2013-13806]

Download as PDF wreier-aviles on DSK5TPTVN1PROD with NOTICES 35020 Federal Register / Vol. 78, No. 112 / Tuesday, June 11, 2013 / Notices the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new forebay 160 feet wide by 160 feet long; (2) a new powerhouse 160 feet wide by 125 feet long; (3) a new tailrace 160 feet wide by 200 feet long; (4) new concrete retaining walls upstream of the dam spillway and downstream of the new powerhouse; (5) three horizontal bulb turbine-generators each rated at 5.5 megawatts; (6) a 50megavolt-ampere, 4.16-kilovolt (kV)/69kV three-phase step-up transformer; (7) a new substation 40 feet wide by 40 feet long; and (8) a new 69-kV transmission line approximately 2.3 miles long from the new substation to an existing substation. The estimated annual generation of the Allegheny #7 Project would be 89 gigawatt-hours. Applicant Contact: Mr. Daniel Lissner, FFP Project 132, LLC, 239 Causeway Street, Suite 300, Boston, MA 02114; phone: (978) 283–2822. FERC Contact: Woohee Choi; phone: (202) 502–6336. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ VerDate Mar<15>2010 18:43 Jun 10, 2013 Jkt 229001 link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14522) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: June 4, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–13809 Filed 6–10–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14488–000] FFP Project 55, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2013, FFP Project 55, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project located at the U.S. Army Corps of Engineers’ (Corps) Kentucky River Lock & Dam #2, located on the Kentucky River near the town of Gratz in Henry and Owen Counties, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 310-foot-long, 170foot-wide intake channel with a 100foot-long retaining wall; (2) a 150-footlong, 100-foot-wide powerhouse containing two generating units with a total capacity of 7.4 megawatts; (3) a 200-foot-long, 130-foot-wide tailrace with a 100-foot-long retaining wall; (4) a 4.16/34.5 kilo-volt (kV) substation; (5) a 2.0-mile-long, 34.5kV transmission line. The proposed project would have an average annual generation of 29,000 megawatt-hours, and operate as directed by the Corps. Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283–2822. FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202) 502– 8577. Deadline for filing comments, motions to intervene, competing applications PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14487) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: June 5, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–13806 Filed 6–10–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14487–000] FFP Project 56, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2013, FFP Project 56, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project located at the U.S. Army Corps of Engineers’ (Corps) Kentucky River Lock & Dam #3, located on the Kentucky River near the town of E:\FR\FM\11JNN1.SGM 11JNN1

Agencies

[Federal Register Volume 78, Number 112 (Tuesday, June 11, 2013)]
[Notices]
[Page 35020]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13806]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14488-000]


 FFP Project 55, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On February 1, 2013, FFP Project 55, LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of a hydropower project 
located at the U.S. Army Corps of Engineers' (Corps) Kentucky River 
Lock & Dam 2, located on the Kentucky River near the town of 
Gratz in Henry and Owen Counties, Kentucky. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following: (1) A 310-
foot-long, 170-foot-wide intake channel with a 100-foot-long retaining 
wall; (2) a 150-foot-long, 100-foot-wide powerhouse containing two 
generating units with a total capacity of 7.4 megawatts; (3) a 200-
foot-long, 130-foot-wide tailrace with a 100-foot-long retaining wall; 
(4) a 4.16/34.5 kilo-volt (kV) substation; (5) a 2.0-mile-long, 34.5kV 
transmission line. The proposed project would have an average annual 
generation of 29,000 megawatt-hours, and operate as directed by the 
Corps.
    Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power 
Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 
283-2822.
    FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202) 
502-8577.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and five copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14487) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: June 5, 2013.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2013-13806 Filed 6-10-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.