GB Energy Park, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 35018-35019 [2013-13802]
Download as PDF
35018
Federal Register / Vol. 78, No. 112 / Tuesday, June 11, 2013 / Notices
Dated: June 4, 2013.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 14332–000–NH]
[Docket No. PR13–50–000]
Historic Harrisville, Inc.; Notice of
Availability of Environmental
Assessment
Dow Intrastate Gas Company; Notice
of Petition for Rate Approval
[FR Doc. 2013–13810 Filed 6–10–13; 8:45 am]
BILLING CODE 6717–01–P
wreier-aviles on DSK5TPTVN1PROD with NOTICES
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR Part
380 (Order No. 486, 52 FR 47879), the
Office of Energy Projects has reviewed
the application for exemption from
licensing for the Cheshire Mills
Hydroelectric Project, to be located on
Nubanusit Brook, in the town of
Harrisville, Cheshire County, New
Hampshire, and has prepared an
Environmental Assessment (EA). In the
EA, Commission staff analyzes the
potential environmental effects of the
project and concludes that issuing an
exemption for the project, with
appropriate environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. You may also register
online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified
via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, contact
Brandon Cherry at (202) 502–8328 or
brandon.cherry@ferc.gov.
Dated: June 4, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13808 Filed 6–10–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
18:43 Jun 10, 2013
Jkt 229001
Take notice that on May 31, 2013,
Dow Intrastate Gas Company filed a
petition for rate approval pursuant to
Section 284.123(b)(2) of the
Commission’s regulations for approval
of a new rate applicable to interruptible
transportation service and to revise its
Statement of Operating Conditions, as
more fully detailed in the petition.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on Friday, June 14, 2013.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13642–002]
GB Energy Park, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On May 1, 2013, GB Energy Park, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Gordon Butte
Pumped Storage Project (project) to be
located near Martinsdale, Meagher
County, Montana. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following:
Upper Reservoir
(1) A new 50-foot-high, 9,000-footlong earthen and roller compacted
concrete embankment; (2) a new 3,000foot-long, 1,000-foot-wide, 50- to 75foot-deep upper reservoir, with a surface
area of 50 acres and a storage capacity
of 4,050 acre-feet at a normal maximum
surface elevation of 6,020 feet; (3) a new
25-foot-diameter, 4,000-foot-long
concrete- and steel-lined horizontal
tunnel conveying flows to the
powerhouse; and (4) a new powerhouse
adjacent to the lower reservoir
containing four 100-megawatt (MW)
turbine generator units having a total
installed capacity of 400 MW.
Lower Reservoir
(1) A new 50-foot-high, 10,000-footlong earthen and roller compacted
concrete embankment; (2) a new 5,000foot-long, 1,000-foot-wide, 50- to 75foot-deep lower reservoir with a surface
area of 80 acres and a storage capacity
of 4,050 acre-feet at a normal maximum
surface elevation of 4,990 feet; (3)
option of three flow lines: (a) An
existing canal carrying flows diverted
from Cottonwood Creek by an existing
E:\FR\FM\11JNN1.SGM
11JNN1
wreier-aviles on DSK5TPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 112 / Tuesday, June 11, 2013 / Notices
diversion structure to the project; (b) a
new pipeline to convey flows to the
project from Martinsdale reservoir; or (c)
a private reservoir; (4) a new substation;
(5) option of two transmission lines: (a)
A new 5.7-mile-long, 500-kilovolt (kV)
transmission line interconnecting with
an existing 500-kV line, or (b) a new 1.1mile-long, 100-kV transmission line
interconnecting to an existing 100-kV
line; (6) new 20-foot-wide gravel access
roads along the outside and top of both
reservoirs’ embankments; and (7)
appurtenant facilities.
The proposed project would have an
average annual generation of 1,300
gigawatt-hours.
Applicant Contact: Mr. Carl
Borgquist, GB Energy Park, LLC, P.O.
Box 309, Bozeman, MT 59771; phone:
(406) 585–3006.
FERC Contact: Dianne Rodman;
phone: (202) 502–6077.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13642) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
VerDate Mar<15>2010
18:43 Jun 10, 2013
Jkt 229001
Dated: June 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13802 Filed 6–10–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14485–000; Project No. 14485–
000]
FFP Project 58, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 1, 2013, FFP Project 58,
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
hydropower project at the Kentucky
River Lock and Dam #6 located on the
Kentucky River near the town of Salvisa
in Mercer and Woodford Counties,
Kentucky. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A 465-foot-long, 34foot-high timber crib dam; (2) a reservoir
with a surface area of 940 acres and a
storage capacity of 16,310 acre-feet; (3)
a 300-foot-long, 160-foot-wide intake
channel with a 70-foot-long retaining
wall; (4) a 140-foot-long, 70-foot-wide
powerhouse containing two generating
units with a total capacity of 6.0
megawatts; (5) a 180-foot-long, 130-footwide tailrace with a 70-foot-long
retaining wall; (6) a 4.16/34.5 kilo-Volt
(kV) substation; (7) a 4.3-mile-long, 34.5
kV transmission line. The project would
have an average annual generation of
23,700 megawatt-hours.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power
Corporation, 239 Causeway Street, Suite
300, Boston, MA 02114. (978) 283–2822.
FERC Contact: Chris Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
35019
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14485) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: June 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13803 Filed 6–10–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14522–000]
FFP Project 132, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On May 20, 2013, FFP Project 132,
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Allegheny Lock and Dam #7
Hydroelectric Project (Allegheny #7
Project or project) to be located at the
U.S. Army Corps of Engineers’ (Corps)
Allegheny Lock and Dam #7 on the
Allegheny River in Armstrong County,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
E:\FR\FM\11JNN1.SGM
11JNN1
Agencies
[Federal Register Volume 78, Number 112 (Tuesday, June 11, 2013)]
[Notices]
[Pages 35018-35019]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13802]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13642-002]
GB Energy Park, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On May 1, 2013, GB Energy Park, LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Gordon Butte Pumped
Storage Project (project) to be located near Martinsdale, Meagher
County, Montana. The sole purpose of a preliminary permit, if issued,
is to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of the following:
Upper Reservoir
(1) A new 50-foot-high, 9,000-foot-long earthen and roller
compacted concrete embankment; (2) a new 3,000-foot-long, 1,000-foot-
wide, 50- to 75-foot-deep upper reservoir, with a surface area of 50
acres and a storage capacity of 4,050 acre-feet at a normal maximum
surface elevation of 6,020 feet; (3) a new 25-foot-diameter, 4,000-
foot-long concrete- and steel-lined horizontal tunnel conveying flows
to the powerhouse; and (4) a new powerhouse adjacent to the lower
reservoir containing four 100-megawatt (MW) turbine generator units
having a total installed capacity of 400 MW.
Lower Reservoir
(1) A new 50-foot-high, 10,000-foot-long earthen and roller
compacted concrete embankment; (2) a new 5,000-foot-long, 1,000-foot-
wide, 50- to 75-foot-deep lower reservoir with a surface area of 80
acres and a storage capacity of 4,050 acre-feet at a normal maximum
surface elevation of 4,990 feet; (3) option of three flow lines: (a) An
existing canal carrying flows diverted from Cottonwood Creek by an
existing
[[Page 35019]]
diversion structure to the project; (b) a new pipeline to convey flows
to the project from Martinsdale reservoir; or (c) a private reservoir;
(4) a new substation; (5) option of two transmission lines: (a) A new
5.7-mile-long, 500-kilovolt (kV) transmission line interconnecting with
an existing 500-kV line, or (b) a new 1.1-mile-long, 100-kV
transmission line interconnecting to an existing 100-kV line; (6) new
20-foot-wide gravel access roads along the outside and top of both
reservoirs' embankments; and (7) appurtenant facilities.
The proposed project would have an average annual generation of
1,300 gigawatt-hours.
Applicant Contact: Mr. Carl Borgquist, GB Energy Park, LLC, P.O.
Box 309, Bozeman, MT 59771; phone: (406) 585-3006.
FERC Contact: Dianne Rodman; phone: (202) 502-6077.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and five copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13642) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: June 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-13802 Filed 6-10-13; 8:45 am]
BILLING CODE 6717-01-P