FFP Project 119, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 35021 [2013-13801]
Download as PDF
wreier-aviles on DSK5TPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 112 / Tuesday, June 11, 2013 / Notices
Monterey in Henry and Owen Counties,
Kentucky. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A 310-foot-long, 140foot-wide intake channel with a 125foot-long retaining wall; (2) a 150-footlong, 100-foot-wide powerhouse
containing two generating units with a
total capacity of 7.1 megawatts; (3) a
260-foot-long, 130-foot-wide tailrace
with a 125-foot-long retaining wall; (4)
a 4.16/34.5 kilo-volt (kV) substation; (5)
a 5.5-mile-long, 34.5kV transmission
line. The proposed project would have
an average annual generation of 28,100
megawatt-hours, and operate as directed
by the Corps.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power
Corporation, 239 Causeway Street, Suite
300, Boston, MA 02114. (978) 283–2822.
FERC Contact: Christiane Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
VerDate Mar<15>2010
15:13 Jun 10, 2013
Jkt 229001
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14487) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: June 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13805 Filed 6–10–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14489–000]
FFP Project 119, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 1, 2013, FFP Project 119,
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
hydropower project located at the U.S.
Army Corps of Engineers’ (Corps) Green
River Lock & Dam #2, located on the
Green River near the town of Calhoun
in McLean County, Kentucky. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A 380-foot-long, 170foot-wide intake channel; (2) a 200-footlong crest dam extension connecting the
existing dam to the new powerhouse; (3)
a 160-foot-long, 100-foot-wide
powerhouse containing two generating
units with a total capacity of 8.9
megawatts; (4) a 240-foot-long, 180-footwide tailrace; (5) a 4.16/69 kilo-volt (kV)
substation; (6) a 550-foot-long access
road to the powerhouse and substation;
(7) a 0.8-mile-long, 69kV transmission
line. The proposed project would have
an average annual generation of 42,800
megawatt-hours, and operate as directed
by the Corps.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power
Corporation, 239 Causeway Street, Suite
300, Boston, MA 02114. (978) 283–2822.
FERC Contact: Christiane Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
35021
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14489) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: June 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13801 Filed 6–10–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14486–000]
FFP Project 57, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 1, 2013, FFP Project 57,
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
hydropower project located at the U.S.
Army Corps of Engineers’ (Corps)
E:\FR\FM\11JNN1.SGM
11JNN1
Agencies
[Federal Register Volume 78, Number 112 (Tuesday, June 11, 2013)]
[Notices]
[Page 35021]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13801]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14489-000]
FFP Project 119, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On February 1, 2013, FFP Project 119, LLC filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of a hydropower project
located at the U.S. Army Corps of Engineers' (Corps) Green River Lock &
Dam 2, located on the Green River near the town of Calhoun in
McLean County, Kentucky. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of the following: (1) A 380-
foot-long, 170-foot-wide intake channel; (2) a 200-foot-long crest dam
extension connecting the existing dam to the new powerhouse; (3) a 160-
foot-long, 100-foot-wide powerhouse containing two generating units
with a total capacity of 8.9 megawatts; (4) a 240-foot-long, 180-foot-
wide tailrace; (5) a 4.16/69 kilo-volt (kV) substation; (6) a 550-foot-
long access road to the powerhouse and substation; (7) a 0.8-mile-long,
69kV transmission line. The proposed project would have an average
annual generation of 42,800 megawatt-hours, and operate as directed by
the Corps.
Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power
Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114. (978)
283-2822.
FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202)
502-8577.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and five copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14489) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: June 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-13801 Filed 6-10-13; 8:45 am]
BILLING CODE 6717-01-P