Drawbridge Operation Regulation; Elizabeth River, Eastern Branch, Norfolk, VA, 34892 [2013-13759]
Download as PDF
34892
Federal Register / Vol. 78, No. 112 / Tuesday, June 11, 2013 / Rules and Regulations
TABLE TO § 165.T01–1057—Continued
• Location: In the vicinity of Two Bush Island, Stonington, Maine in approximate position: 44°08′57″ N, 068°39′54″ W (NAD 83).
Ellis Short Sand Park Trustee Fireworks .................................................
Dated: May 24, 2013.
B.S. Gilda,
Captain, U.S. Coast Guard, Acting Captain
of the Port Sector Northern New England.
[FR Doc. 2013–13757 Filed 6–10–13; 8:45 a.m.]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0394]
Drawbridge Operation Regulation;
Elizabeth River, Eastern Branch,
Norfolk, VA
Coast Guard, DHS.
ACTION: Notice of deviation from
drawbridge regulations.
AGENCY:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the draw of the
Norfolk Southern #5 Railroad Bridge,
across the Elizabeth River Eastern
Branch, mile 1.1, Norfolk, VA. This
deviation is necessary to facilitate
thermite welding on rail joints on the
Norfolk Southern #5 Railroad
drawbridge. This temporary deviation
allows the drawbridge to remain in the
closed to navigation position.
DATES: This deviation is effective from
11 a.m. on July 8, 2013 to 1 p.m. July
16, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0394] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
wreier-aviles on DSK5TPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
15:08 Jun 10, 2013
Jkt 229001
•
•
•
•
•
Event Type: Fireworks Display.
Sponsor: William. Burnham.
Date: July 5, 2013.
Time: 8:30 p.m. to 11:30 p.m.
Location: In the vicinity of York Beach, Maine in approximate position: 43°10′27″ N, 070°36′25″ W (NAD 83).
deviation, call or email Mr. Jim
Rousseau, Bridge Administration
Branch Fifth District, Coast Guard;
telephone (757) 398–6557, email James.
L.Rousseau2@uscg.mil. If you have
questions on reviewing the docket, call
Barbara Hairston, Program Manager,
Docket Operations, 202–366–9826.
SUPPLEMENTARY INFORMATION: The
Norfolk Southern Corporation, who
owns and operates this drawbridge, has
requested a temporary deviation from
the current operating regulations set out
in 33 CFR 117.5 to facilitate thermite
welding on the rails.
Under the regular operating schedule,
the Norfolk Southern #5 Railroad
Bridge, mile 1.1, in Norfolk, VA, the
draw must open promptly and fully for
the passage of vessels when a request or
signal to open is given. The draw
normally is open and only closes for
train crossings or periodic maintenance.
The Norfolk Southern #5 Railroad
Bridge, at mile 1.1, across the Elizabeth
River (Eastern Branch) in Norfolk, VA,
has a vertical clearance in the closed
position to vessels of 6 feet above mean
high water.
Under this temporary deviation, the
drawbridge will be maintained in the
closed to navigation position from 11
a.m. to 1 p.m. on July 8, 9, 10, 15 and
16, 2013 the bridge will operate under
normal operating schedule at all other
times. The bridge normally operates in
the open position with several vessels
transiting a week and only closes when
trains transit. Emergency openings
cannot be provided. There are no
alternate routes for vessels transiting
this section of the Elizabeth River
Eastern Branch but vessels may pass
before 11 a.m. and after 1 p.m.
The Elizabeth River Eastern Branch is
used by a variety of vessels including
military, tugs, commercial, and
recreational vessels. The Coast Guard
has carefully coordinated the
restrictions with these waterway users.
The Coast Guard will also inform
additional waterway users through our
Local and Broadcast Notice to Mariners
of the closure periods for the bridge so
that vessels can arrange their transits to
minimize any impacts caused by the
PO 00000
Frm 00026
Fmt 4700
Sfmt 4700
temporary deviation. Mariners able to
pass under the bridge in the closed
position may do so at any time and are
advised to proceed with caution.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: May 30, 2013.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2013–13759 Filed 6–10–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0411]
Drawbridge Operation Regulation;
Middle River, Near Stockton, CA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
SUMMARY: The Coast Guard has issued a
temporary deviation from the operating
regulation that governs the Bacon Island
Drawbridge across Middle River, mile
8.6, near Stockton, CA. The deviation is
to allow San Joaquin County Public
Works Department to perform structural
maintenance work to the bridge. This
deviation allows the bridge to remain in
the closed-to-navigation position during
the repairs.
DATES: This deviation is effective from
12:01 a.m. on September 30, 2013 to
11:59 p.m. on October 31, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0411], is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
E:\FR\FM\11JNR1.SGM
11JNR1
Agencies
[Federal Register Volume 78, Number 112 (Tuesday, June 11, 2013)]
[Rules and Regulations]
[Page 34892]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13759]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-0394]
Drawbridge Operation Regulation; Elizabeth River, Eastern Branch,
Norfolk, VA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the draw of the Norfolk Southern
5 Railroad Bridge, across the Elizabeth River Eastern Branch,
mile 1.1, Norfolk, VA. This deviation is necessary to facilitate
thermite welding on rail joints on the Norfolk Southern 5
Railroad drawbridge. This temporary deviation allows the drawbridge to
remain in the closed to navigation position.
DATES: This deviation is effective from 11 a.m. on July 8, 2013 to 1
p.m. July 16, 2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0394] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Jim Rousseau, Bridge
Administration Branch Fifth District, Coast Guard; telephone (757) 398-
6557, email James.L.Rousseau2@uscg.mil. If you have questions on
reviewing the docket, call Barbara Hairston, Program Manager, Docket
Operations, 202-366-9826.
SUPPLEMENTARY INFORMATION: The Norfolk Southern Corporation, who owns
and operates this drawbridge, has requested a temporary deviation from
the current operating regulations set out in 33 CFR 117.5 to facilitate
thermite welding on the rails.
Under the regular operating schedule, the Norfolk Southern
5 Railroad Bridge, mile 1.1, in Norfolk, VA, the draw must
open promptly and fully for the passage of vessels when a request or
signal to open is given. The draw normally is open and only closes for
train crossings or periodic maintenance. The Norfolk Southern
5 Railroad Bridge, at mile 1.1, across the Elizabeth River
(Eastern Branch) in Norfolk, VA, has a vertical clearance in the closed
position to vessels of 6 feet above mean high water.
Under this temporary deviation, the drawbridge will be maintained
in the closed to navigation position from 11 a.m. to 1 p.m. on July 8,
9, 10, 15 and 16, 2013 the bridge will operate under normal operating
schedule at all other times. The bridge normally operates in the open
position with several vessels transiting a week and only closes when
trains transit. Emergency openings cannot be provided. There are no
alternate routes for vessels transiting this section of the Elizabeth
River Eastern Branch but vessels may pass before 11 a.m. and after 1
p.m.
The Elizabeth River Eastern Branch is used by a variety of vessels
including military, tugs, commercial, and recreational vessels. The
Coast Guard has carefully coordinated the restrictions with these
waterway users. The Coast Guard will also inform additional waterway
users through our Local and Broadcast Notice to Mariners of the closure
periods for the bridge so that vessels can arrange their transits to
minimize any impacts caused by the temporary deviation. Mariners able
to pass under the bridge in the closed position may do so at any time
and are advised to proceed with caution.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period.
This deviation from the operating regulations is authorized under
33 CFR 117.35.
Dated: May 30, 2013.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2013-13759 Filed 6-10-13; 8:45 am]
BILLING CODE 9110-04-P