Drawbridge Operation Regulation; Elizabeth River, Eastern Branch, Norfolk, VA, 34892 [2013-13759]

Download as PDF 34892 Federal Register / Vol. 78, No. 112 / Tuesday, June 11, 2013 / Rules and Regulations TABLE TO § 165.T01–1057—Continued • Location: In the vicinity of Two Bush Island, Stonington, Maine in approximate position: 44°08′57″ N, 068°39′54″ W (NAD 83). Ellis Short Sand Park Trustee Fireworks ................................................. Dated: May 24, 2013. B.S. Gilda, Captain, U.S. Coast Guard, Acting Captain of the Port Sector Northern New England. [FR Doc. 2013–13757 Filed 6–10–13; 8:45 a.m.] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2013–0394] Drawbridge Operation Regulation; Elizabeth River, Eastern Branch, Norfolk, VA Coast Guard, DHS. ACTION: Notice of deviation from drawbridge regulations. AGENCY: The Coast Guard has issued a temporary deviation from the operating schedule that governs the draw of the Norfolk Southern #5 Railroad Bridge, across the Elizabeth River Eastern Branch, mile 1.1, Norfolk, VA. This deviation is necessary to facilitate thermite welding on rail joints on the Norfolk Southern #5 Railroad drawbridge. This temporary deviation allows the drawbridge to remain in the closed to navigation position. DATES: This deviation is effective from 11 a.m. on July 8, 2013 to 1 p.m. July 16, 2013. ADDRESSES: The docket for this deviation, [USCG–2013–0394] is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12–140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary wreier-aviles on DSK5TPTVN1PROD with RULES SUMMARY: VerDate Mar<15>2010 15:08 Jun 10, 2013 Jkt 229001 • • • • • Event Type: Fireworks Display. Sponsor: William. Burnham. Date: July 5, 2013. Time: 8:30 p.m. to 11:30 p.m. Location: In the vicinity of York Beach, Maine in approximate position: 43°10′27″ N, 070°36′25″ W (NAD 83). deviation, call or email Mr. Jim Rousseau, Bridge Administration Branch Fifth District, Coast Guard; telephone (757) 398–6557, email James. L.Rousseau2@uscg.mil. If you have questions on reviewing the docket, call Barbara Hairston, Program Manager, Docket Operations, 202–366–9826. SUPPLEMENTARY INFORMATION: The Norfolk Southern Corporation, who owns and operates this drawbridge, has requested a temporary deviation from the current operating regulations set out in 33 CFR 117.5 to facilitate thermite welding on the rails. Under the regular operating schedule, the Norfolk Southern #5 Railroad Bridge, mile 1.1, in Norfolk, VA, the draw must open promptly and fully for the passage of vessels when a request or signal to open is given. The draw normally is open and only closes for train crossings or periodic maintenance. The Norfolk Southern #5 Railroad Bridge, at mile 1.1, across the Elizabeth River (Eastern Branch) in Norfolk, VA, has a vertical clearance in the closed position to vessels of 6 feet above mean high water. Under this temporary deviation, the drawbridge will be maintained in the closed to navigation position from 11 a.m. to 1 p.m. on July 8, 9, 10, 15 and 16, 2013 the bridge will operate under normal operating schedule at all other times. The bridge normally operates in the open position with several vessels transiting a week and only closes when trains transit. Emergency openings cannot be provided. There are no alternate routes for vessels transiting this section of the Elizabeth River Eastern Branch but vessels may pass before 11 a.m. and after 1 p.m. The Elizabeth River Eastern Branch is used by a variety of vessels including military, tugs, commercial, and recreational vessels. The Coast Guard has carefully coordinated the restrictions with these waterway users. The Coast Guard will also inform additional waterway users through our Local and Broadcast Notice to Mariners of the closure periods for the bridge so that vessels can arrange their transits to minimize any impacts caused by the PO 00000 Frm 00026 Fmt 4700 Sfmt 4700 temporary deviation. Mariners able to pass under the bridge in the closed position may do so at any time and are advised to proceed with caution. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: May 30, 2013. Waverly W. Gregory, Jr., Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2013–13759 Filed 6–10–13; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2013–0411] Drawbridge Operation Regulation; Middle River, Near Stockton, CA Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: SUMMARY: The Coast Guard has issued a temporary deviation from the operating regulation that governs the Bacon Island Drawbridge across Middle River, mile 8.6, near Stockton, CA. The deviation is to allow San Joaquin County Public Works Department to perform structural maintenance work to the bridge. This deviation allows the bridge to remain in the closed-to-navigation position during the repairs. DATES: This deviation is effective from 12:01 a.m. on September 30, 2013 to 11:59 p.m. on October 31, 2013. ADDRESSES: The docket for this deviation, [USCG–2013–0411], is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management E:\FR\FM\11JNR1.SGM 11JNR1

Agencies

[Federal Register Volume 78, Number 112 (Tuesday, June 11, 2013)]
[Rules and Regulations]
[Page 34892]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13759]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2013-0394]


Drawbridge Operation Regulation; Elizabeth River, Eastern Branch, 
Norfolk, VA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulations.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the draw of the Norfolk Southern 
5 Railroad Bridge, across the Elizabeth River Eastern Branch, 
mile 1.1, Norfolk, VA. This deviation is necessary to facilitate 
thermite welding on rail joints on the Norfolk Southern 5 
Railroad drawbridge. This temporary deviation allows the drawbridge to 
remain in the closed to navigation position.

DATES: This deviation is effective from 11 a.m. on July 8, 2013 to 1 
p.m. July 16, 2013.

ADDRESSES: The docket for this deviation, [USCG-2013-0394] is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation. You may also visit the Docket 
Management Facility in Room W12-140 on the ground floor of the 
Department of Transportation West Building, 1200 New Jersey Avenue SE., 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Jim Rousseau, Bridge 
Administration Branch Fifth District, Coast Guard; telephone (757) 398-
6557, email James.L.Rousseau2@uscg.mil. If you have questions on 
reviewing the docket, call Barbara Hairston, Program Manager, Docket 
Operations, 202-366-9826.

SUPPLEMENTARY INFORMATION: The Norfolk Southern Corporation, who owns 
and operates this drawbridge, has requested a temporary deviation from 
the current operating regulations set out in 33 CFR 117.5 to facilitate 
thermite welding on the rails.
    Under the regular operating schedule, the Norfolk Southern 
5 Railroad Bridge, mile 1.1, in Norfolk, VA, the draw must 
open promptly and fully for the passage of vessels when a request or 
signal to open is given. The draw normally is open and only closes for 
train crossings or periodic maintenance. The Norfolk Southern 
5 Railroad Bridge, at mile 1.1, across the Elizabeth River 
(Eastern Branch) in Norfolk, VA, has a vertical clearance in the closed 
position to vessels of 6 feet above mean high water.
    Under this temporary deviation, the drawbridge will be maintained 
in the closed to navigation position from 11 a.m. to 1 p.m. on July 8, 
9, 10, 15 and 16, 2013 the bridge will operate under normal operating 
schedule at all other times. The bridge normally operates in the open 
position with several vessels transiting a week and only closes when 
trains transit. Emergency openings cannot be provided. There are no 
alternate routes for vessels transiting this section of the Elizabeth 
River Eastern Branch but vessels may pass before 11 a.m. and after 1 
p.m.
    The Elizabeth River Eastern Branch is used by a variety of vessels 
including military, tugs, commercial, and recreational vessels. The 
Coast Guard has carefully coordinated the restrictions with these 
waterway users. The Coast Guard will also inform additional waterway 
users through our Local and Broadcast Notice to Mariners of the closure 
periods for the bridge so that vessels can arrange their transits to 
minimize any impacts caused by the temporary deviation. Mariners able 
to pass under the bridge in the closed position may do so at any time 
and are advised to proceed with caution.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the designated 
time period.
    This deviation from the operating regulations is authorized under 
33 CFR 117.35.

    Dated: May 30, 2013.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2013-13759 Filed 6-10-13; 8:45 am]
BILLING CODE 9110-04-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.