Drawbridge Operation Regulations; Saugatuck River, Westport, CT, 34893 [2013-13755]
Download as PDF
wreier-aviles on DSK5TPTVN1PROD with RULES
Federal Register / Vol. 78, No. 112 / Tuesday, June 11, 2013 / Rules and Regulations
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
email David H. Sulouff, Chief, Bridge
Section, Eleventh Coast Guard District;
telephone 510–437–3516, email
David.H.Sulouff@uscg.mil. If you have
questions on viewing the docket, call
Barbara Hairston, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: San
Joaquin County Department of Public
Works has requested a temporary
change to the operation of the Bacon
Island Drawbridge, mile 8.6, over
Middle River, near Stockton, CA. The
drawbridge navigation span provides a
vertical clearance of approximately 8
feet above Mean High Water in the
closed-to-navigation position. In
accordance with 33 CFR 117.171(a), the
draw opens on signal from May 15
through September 15 from 9 a.m. to 5
p.m. From September 16 through May
14, the draw opens on signal from 9 a.m.
to 5 p.m. from Thursday through
Monday. At all other times, the draw
shall open on signal if at least 12 hours
notice is given to the San Joaquin
County Department of Public Works at
Stockton. Navigation on the waterway is
commercial and recreational.
The drawspan will be secured in the
closed-to-navigation position from 12:01
a.m. on September 30, 2013 to 11:59
p.m. on October 31, 2013, due to
structural maintenance work in
replacing the approach deck slabs. The
work will require loss of power to the
bridge electrical systems.
This temporary deviation has been
coordinated with commercial operators
and various marinas. No objections to
the proposed temporary deviation were
raised. Vessels that can transit the
bridge, while in the closed-to-navigation
position, may continue to do so at any
time.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: May 24, 2013.
D. H. Sulouff,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2013–13762 Filed 6–10–13; 8:45 am]
BILLING CODE 9110–04–P
VerDate Mar<15>2010
15:08 Jun 10, 2013
Jkt 229001
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2013–0490]
Drawbridge Operation Regulations;
Saugatuck River, Westport, CT
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Route 136 Bridge
across the Saugatuck River, mile 1.3, at
Westport, Connecticut. The deviation is
necessary to facilitate emergency
repairs. Under this temporary deviation,
the bridge owner may require a 24 hour
advance notice for bridge openings from
June 2, 2013 through July 15, 2013.
DATES: This deviation is effective from
June 11, 2013 through July 15, 2013, and
has been enforced with actual notice
since June 2, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0391] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Ms. Judy LeungYee, Project Officer, First Coast Guard
District, judy.k.leung-yee@uscg.mil, or
(212) 668–7165. If you have questions
on viewing the docket, call Barbara
Hairston, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The Route
136 Bridge has a vertical clearance of 6
feet at mean high water in the closed
position. The existing drawbridge
operating regulations are found at 33
CFR 117.221(c).
The bridge owner, Connecticut
Department of Transportation, requested
a 24 hour advance notice requirement
for bridge openings to facilitate
emergency repairs to the mechanical
and electrical components at the bridge.
The emergency repairs are necessary
to repair storm damage from Hurricane
Sandy.
PO 00000
Frm 00027
Fmt 4700
Sfmt 4700
34893
Under this temporary deviation at
least a 24 hour advance notice shall be
required for bridge openings at the
Route 136 Bridge, mile 1.3, across the
Saugatuck River at Westport,
Connecticut, from June 2, 2013 through
July 15, 2013.
The Saugatuck River is predominantly
a recreational waterway. The bridge
rarely opens during the time period this
temporary deviation will be in effect.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated repair period.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: May 30, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2013–13755 Filed 6–10–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2013–0416]
Drawbridge Operation Regulations;
Reynolds Channel, Lawrence, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulations
governing the operation of the Atlantic
Beach Bridge, mile 0.4, across Reynolds
Channel, at Lawrence, New York. This
temporary deviation authorizes the
Atlantic Beach Bridge to operate under
an alternate schedule for 176 days, to
facilitate electrical and structural
rehabilitation at the bridge.
DATES: This deviation is effective from
June 9, 2013 through December 1, 2013.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2013–
0416 and are available online at
www.regulations.gov, inserting USCG–
2013–0416 in the ‘‘Keyword’’ and then
clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
E:\FR\FM\11JNR1.SGM
11JNR1
Agencies
[Federal Register Volume 78, Number 112 (Tuesday, June 11, 2013)]
[Rules and Regulations]
[Page 34893]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13755]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[USCG-2013-0490]
Drawbridge Operation Regulations; Saugatuck River, Westport, CT
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Route 136 Bridge across the Saugatuck River, mile 1.3, at Westport,
Connecticut. The deviation is necessary to facilitate emergency
repairs. Under this temporary deviation, the bridge owner may require a
24 hour advance notice for bridge openings from June 2, 2013 through
July 15, 2013.
DATES: This deviation is effective from June 11, 2013 through July 15,
2013, and has been enforced with actual notice since June 2, 2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0391] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140, on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Ms. Judy Leung-Yee, Project Officer,
First Coast Guard District, judy.k.leung-yee@uscg.mil, or (212) 668-
7165. If you have questions on viewing the docket, call Barbara
Hairston, Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Route 136 Bridge has a vertical
clearance of 6 feet at mean high water in the closed position. The
existing drawbridge operating regulations are found at 33 CFR
117.221(c).
The bridge owner, Connecticut Department of Transportation,
requested a 24 hour advance notice requirement for bridge openings to
facilitate emergency repairs to the mechanical and electrical
components at the bridge.
The emergency repairs are necessary to repair storm damage from
Hurricane Sandy.
Under this temporary deviation at least a 24 hour advance notice
shall be required for bridge openings at the Route 136 Bridge, mile
1.3, across the Saugatuck River at Westport, Connecticut, from June 2,
2013 through July 15, 2013.
The Saugatuck River is predominantly a recreational waterway. The
bridge rarely opens during the time period this temporary deviation
will be in effect.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
repair period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: May 30, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2013-13755 Filed 6-10-13; 8:45 am]
BILLING CODE 9110-04-P