On March 6, 2012, the Commission
staff granted Jordan Cove’s request to
utilize the Pre-Filing Process and
assigned Docket No. PF12–7 to staff
activities involved with Jordan Cove’s
Liquefaction Project. Now, as of the
filing of the application on May 21,
2013, the Pre-Filing Process for this
project has ended. From this time
forward, this proceeding will be
conducted in Docket No. CP13–483–
000, as noted in the caption of this
Notice.
Because the environmental review of
the Jordan Cove Energy Project must
also include the Pacific Connector Gas
Pipeline LP (Pacific Connector), as the
connecting supply pipeline to the LNG
terminal, the Commission cannot begin
preparation of the Environmental
Impact Statement (EIS) to comply with
the National Environmental Policy Act
of 1969, until Pacific Connector’s
application is filed. Within 90 days after
the Commission issues a Notice of
Application for the Pacific Connector
application, the Commission staff will
issue a Notice of Schedule for
Environmental Review that will indicate
the anticipated date for the
Commission’s staff issuance of the final
EIS analyzing both proposals. The
issuance of a Notice of Schedule for
Environmental Review will also serve to
notify federal and state agencies of the
timing for the completion of all
necessary reviews, and the subsequent
need to complete all federal
authorizations within 90 days of the
date of issuance of the Commission
staff’s final EIS.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, before the comment date of this
notice, file with the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426, a motion to
intervene in accordance with the
requirements of the Commission’s Rules
of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
VerDate Mar<15>2010
17:35 Jun 05, 2013
Jkt 229001
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on June 20, 2013.
Dated: May 30, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13398 Filed 6–5–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5379–008]
New Hampshire Water Resources
Board, Hydro Dynamics Corporation;
Notice of Transfer of Exemption
1. By letter filed April 16, 2013, New
Hampshire Water Resources Board coexemptee and the New Hampshire
Department of Environmental Services,
as successor agency, and Hydro
Dynamics Corporation as co-exemptee,
Goffstown Hydro Corporation, successor
in interest informed the Commission
that the exemption from licensing for
the Hadley Falls Project, FERC No.
5379, originally issued January 19,
1982,1 has been transferred to the New
Hampshire Department of
Environmental Service, as sole
exemptee. The project is located on the
Piscataquog River in Hillsborough
County, New Hampshire. The transfer of
1 18 FERC ¶ 62,032, Order Granting Exemption
From Licensing of a Small Hydroelectric Project of
5 Megawatts or Less.
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
an exemption does not require
Commission approval.
2. New Hampshire Department of
Environmental Services, located at 29
Hazen Drive, Concord, NH 03302 is now
the sole exemptee of the Hadley Falls
Project, FERC No. 5379.
Dated: May 30, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13393 Filed 6–5–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 8498–018]
Lois Von Morganroth; Shiloh Warm
Springs Ranch, LLC; Notice of
Application for Transfer of License,
and Soliciting Comments and Motions
To Intervene
On April 29, 2013, Lois Von
Morganroth (transferor) and Shiloh
Warm Springs Ranch, LLC (transferee)
filed an application for the transfer of
license for the L & M Angus Ranch
Project, FERC No. 8498, located on
Warm Springs Creek, a tributary to the
Salmon River in Custer County, Idaho.
Applicants seek Commission approval
to transfer the license for the L & M
Angus Ranch Project from the transferor
to the transferee.
Applicants’ Contact: For Transferor:
Ms. Lois Von Morganroth, 1223
Montana Avenue, Santa Monica, CA
90403, telephone (310) 451–8531. For
Transferee: Mr. Christopher W. James,
Shiloh Warm Springs Ranch, LLC, P.O.
Box 510, Challis, ID 83226–0510,
telephone (208) 879–4560 and Rekha K.
Rao, Esq., Duncan, Weinberg, Genzer,
and Pembroke, P.C., 1615 M Street NW.,
Suite 800, Washington, DC 20036,
telephone (202) 467–6370.
FERC Contact: Patricia W. Gillis (202)
502–8735, patricia.gillis@ferc.gov.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice by the
Commission. Comments and motions to
intervene may be filed electronically via
the Internet. See 18 CFR 385.2001(a)(1)
and the instructions on the
Commission’s Web site under https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
E:\FR\FM\06JNN1.SGM
06JNN1
Federal Register / Vol. 78, No. 109 / Thursday, June 6, 2013 / Notices
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project can
be viewed or printed on the eLibrary
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–8498) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Dated: May 30, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13394 Filed 6–5–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2161–034; 2207–045]
Wausau Paper Mills, LLC; Specialty
Papers Acquisition, LLC; Notice of
Application for Transfer of Licenses,
and Soliciting Comments and Motions
To Intervene
On April 22, 2013, Wausau Paper
Mills, LLC (transferor) and Specialty
Papers Acquisition, LLC (transferee)
filed an application for transfer of
licenses for the Rhinelander
Hydroelectric Project, FERC No. 2161
and the Mosinee Hydroelectric Project,
FERC No. 2207. The Rhinelander
Hydroelectric Project is located on the
upper Wisconsin River in Oneida
County, Wisconsin. The Mosinee
Hydroelectric Project is located on the
Wisconsin River in Marathon County,
Wisconsin.
Applicants seek Commission approval
to transfer the licenses for Rhinelander
Hydroelectric Project and the Mosinee
Hydroelectric Project from transferor to
transferee.
Applicants’ Contact: Transferor: Ms.
Elizabeth W. Whittle, Partner, Nixon
Peabody LLP, 401 Ninth Street NW.,
Suite 900, Washington, DC 20004,
telephone (202) 585–8338. For
Transferee: Mr. Carl L. Reisner, Partner,
Paul, Weiss, Rifkind, Wharton &
Garrison LLP, 1285 Avenue of the
Americas, New York, NY 10019–6064,
telephone (212) 373–3017.
FERC Contact: Patricia W. Gillis (202)
502–8735.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice by the
Commission. Comments and motions to
intervene may be filed electronically via
the Internet. See 18 CFR 385.2001(a)(1)
and the instructions on the
Commission’s Web site under https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project can
34091
be viewed or printed on the eLibrary
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/elibrary.
asp. Enter the docket numbers (P–2161
or P–2207) in the docket number field
to access the document. For assistance,
call toll-free 1–866–208–3372.
Dated: May 30, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13401 Filed 6–5–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP13–73–000; CP13–74–000]
Sierrita Gas Pipeline LLC; Notice of
Public Meeting for the Proposed
Sierrita Pipeline Project
On June 18, 2013, the Federal Energy
Regulatory Commission (FERC or
Commission) Office of Energy Projects
staff will hold a meeting to discuss
Sierrita Gas Pipeline LLC’s (Sierrita)
plans for restoring the proposed Sierrita
Pipeline Project right-of-way. The
meeting is open to the public; however,
the intent of the meeting is to provide
the Altar Valley Conservation Alliance
members and the landowners directly
affected by the Sierrita Pipeline Project
the opportunity to provide input on the
design of Sierrita’s restoration measures.
The FERC staff will conduct this public
meeting as part of its preparation of an
environmental impact statement for the
project. The meeting is scheduled as
follows:
Location
Tuesday, June 18, 2013, 9:00 a.m. local time .........................................
mstockstill on DSK4VPTVN1PROD with NOTICES
Date and time
Casino Del Sol Conference Room, 5655 W Valencia Road, Tucson, AZ
85757.
All public meetings will be posted on
the Commission’s calendar located at
www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Additional information about the
Sierrita Pipeline Project is available
from the Commission’s Office of
External Affairs, at (866) 208–FERC, or
on the FERC Web site at www.ferc.gov
using the ‘‘eLibrary’’ link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number, excluding
the last three digits, in the Docket
Number field (i.e., CP13–73). Be sure
you have selected an appropriate date
range. For assistance, please contact
FERC Online Support at
VerDate Mar<15>2010
17:35 Jun 05, 2013
Jkt 229001
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659.
Dated: May 30, 2013.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
Frm 00061
Fmt 4703
Federal Energy Regulatory
Commission
[Docket No. OR13–24–000]
[FR Doc. 2013–13396 Filed 6–5–13; 8:45 am]
PO 00000
DEPARTMENT OF ENERGY
Enterprise Liquids Pipeline LLC;
Notice of Petition for Declaratory Order
Take notice that on May 29, 2013,
pursuant to Rule 207(a)(2) or the
Commission’s Rules of Practices and
Procedures, 18 CFR 385.207(a)(2)(2012),
Enterprise Liquids Pipeline LLC filed a
petition seeking a declaratory order
approving a proposed proration policy
for its new Aegis Pipeline project. The
project is designed to provide capacity
Sfmt 4703
E:\FR\FM\06JNN1.SGM
06JNN1
Agencies
[Federal Register Volume 78, Number 109 (Thursday, June 6, 2013)]
[Notices]
[Pages 34090-34091]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13394]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 8498-018]
Lois Von Morganroth; Shiloh Warm Springs Ranch, LLC; Notice of
Application for Transfer of License, and Soliciting Comments and
Motions To Intervene
On April 29, 2013, Lois Von Morganroth (transferor) and Shiloh Warm
Springs Ranch, LLC (transferee) filed an application for the transfer
of license for the L & M Angus Ranch Project, FERC No. 8498, located on
Warm Springs Creek, a tributary to the Salmon River in Custer County,
Idaho.
Applicants seek Commission approval to transfer the license for the
L & M Angus Ranch Project from the transferor to the transferee.
Applicants' Contact: For Transferor: Ms. Lois Von Morganroth, 1223
Montana Avenue, Santa Monica, CA 90403, telephone (310) 451-8531. For
Transferee: Mr. Christopher W. James, Shiloh Warm Springs Ranch, LLC,
P.O. Box 510, Challis, ID 83226-0510, telephone (208) 879-4560 and
Rekha K. Rao, Esq., Duncan, Weinberg, Genzer, and Pembroke, P.C., 1615
M Street NW., Suite 800, Washington, DC 20036, telephone (202) 467-
6370.
FERC Contact: Patricia W. Gillis (202) 502-8735,
patricia.gillis@ferc.gov.
Deadline for filing comments and motions to intervene: 30 days from
the issuance date of this notice by the Commission. Comments and
motions to intervene may be filed electronically via the Internet. See
18 CFR 385.2001(a)(1) and the instructions on the Commission's Web site
under https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. If unable to be filed
[[Page 34091]]
electronically, documents may be paper-filed. To paper-file, an
original plus seven copies should be mailed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. More information about this project can be viewed
or printed on the eLibrary link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-8498)
in the docket number field to access the document. For assistance, call
toll-free 1-866-208-3372.
Dated: May 30, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-13394 Filed 6-5-13; 8:45 am]
BILLING CODE 6717-01-P