Columbia Gas Transmission, LLC; Notice of Application, 33399-33400 [2013-13115]
Download as PDF
Federal Register / Vol. 78, No. 107 / Tuesday, June 4, 2013 / Notices
FOR FURTHER INFORMATION CONTACT:
Beatriz Ceja, U.S. Department of
Education, 400 Maryland Avenue SW.,
Room 4C107, Washington, DC 20202–
5930. Telephone: (202) 205–5009. FAX:
(202) 401–8466 or by email:
Schoolleadershipmatters@ed.gov.
If you use a telecommunications
device for the deaf(TDD) or a text
telephone (TTY), call the Federal Relay
Service, toll free, at 1–800–877–8339.
Accessible Format: Individuals with
disabilities can obtain this document
and a copy of the application package in
an accessible format (e.g., braille, large
print, audiotape, or compact disc) on
request to the program contact person
listed under FOR FURTHER INFORMATION
CONTACT.
Electronic Access to This Document:
The official version of this document is
the document published in the Federal
Register. Free Internet access to the
official edition of the Federal Register
and the Code of Federal Regulations is
available via the Federal Digital System
at: www.gpo.gov/fdsys. At this site you
can view this document, as well as all
other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF). To use PDF you must
have Adobe Acrobat Reader, which is
available free at the site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at: www.federalregister.gov.
Specifically, through the advanced
search feature at this site, you can limit
your search to documents published by
the Department.
Dated: May 29, 2013.
James H. Shelton, III,
Assistant Deputy Secretary for Innovation and
Improvement.
[FR Doc. 2013–13192 Filed 6–3–13; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–478–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Application
Take notice that on May 10, 2013,
Columbia Gas Transmission, LLC.
(Columbia) filed with the Federal
Energy Regulatory Commission an
application under section 7 of the
Natural Gas Act for a certificate
authorizing the replacement of 18.52
miles of 20-inch-diameter bare steel
pipeline on its Line 1570 between
VerDate Mar<15>2010
18:33 Jun 03, 2013
Jkt 229001
Columbia’s existing Waynesburg
Compressor Station (CS) and its Redd
Farm Regulator Station in Washington
County, PA, with new coated 24-inchdiameter steel pipeline. Columbia also
proposes to replace three existing 1,080
horsepower (hp) turbine compressors
with a new 4,700 hp turbine compressor
at the Waynesburg CS. To transport gas
for shippers supporting its proposal,
Columbia proposes to use 6,400 hp (of
the total 9,400hp) that is proposed in its
concurrently filed Smithfield III
Expansion Project in Docket No. CP13–
477–000. Columbia’s proposal is
referred to as the Line 1570 Project and
is estimated to cost approximately
$121,739,422.00, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. This filing is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the
application should be directed to
Fredric J. George, Senior Counsel,
Columbia Gas Transmission, LLC, P.O.
Box 1273, Charleston, West Virginia,
25325–1273, by phone at 304–357–2359
or by email at fgeorge@nisource.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
PO 00000
Frm 00075
Fmt 4703
Sfmt 4703
33399
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and seven copies of the protest or
E:\FR\FM\04JNN1.SGM
04JNN1
33400
Federal Register / Vol. 78, No. 107 / Tuesday, June 4, 2013 / Notices
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on June 18, 2013.
Dated: May 24, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13115 Filed 6–3–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–477–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Application
Take notice that on May 10, 2013,
Columbia Gas Transmission, LLC
(Columbia) filed with the Federal
Energy Regulatory Commission an
application under section 7 of the
Natural Gas Act to construct, and
operate a new 9,400 horsepower (hp)
compressor station in Washington
County, Pennsylvania (Redd Farm CS);
two additional compressor units totaling
15,600 hp at its existing Glenville CS in
Gilmer County, West Virginia; new
station piping, control systems, and
other appurtenant facilities at its
existing Smithfield CS and Clendenin
CS in Wetzel and Kanawah Counties
respectively; and other minor
appurtenances at several other sites on
its system. Columbia’s proposal, known
as the Smithfield III Expansion Project,
will provide an additional 444 MDth per
day of delivery capacity from receipt
points in Pennsylvania and West
Virginia to an interconnection with
Columbia Gulf located near Leach,
Kentucky. The total cost of the project
is estimated to be approximately
$81,779,079.00, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. This filing is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the
application should be directed to
Fredric J. George, Senior Counsel,
Columbia Gas Transmission, LLC, P.O.
Box 1273, Charleston, West Virginia
VerDate Mar<15>2010
18:33 Jun 03, 2013
Jkt 229001
25325–1273, by phone at 304–357–2359
or by email at fgeorge@nisource.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and seven copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on June 18, 2013.
Dated: May 24, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13114 Filed 6–3–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 13346–003]
Free Flow Power Corporation; Notice
Soliciting Scoping Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: P–13346–003.
c. Date filed: December 3, 2012.
d. Applicant: Free Flow Power
Corporation (Free Flow Power), on
behalf of its subsidiary PayneBridge,
LLC.
e. Name of Project: Williams Dam
Water Power Project.
f. Location: At the existing Williams
dam owned by the Indiana Department
E:\FR\FM\04JNN1.SGM
04JNN1
Agencies
[Federal Register Volume 78, Number 107 (Tuesday, June 4, 2013)]
[Notices]
[Pages 33399-33400]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13115]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP13-478-000]
Columbia Gas Transmission, LLC; Notice of Application
Take notice that on May 10, 2013, Columbia Gas Transmission, LLC.
(Columbia) filed with the Federal Energy Regulatory Commission an
application under section 7 of the Natural Gas Act for a certificate
authorizing the replacement of 18.52 miles of 20-inch-diameter bare
steel pipeline on its Line 1570 between Columbia's existing Waynesburg
Compressor Station (CS) and its Redd Farm Regulator Station in
Washington County, PA, with new coated 24-inch-diameter steel pipeline.
Columbia also proposes to replace three existing 1,080 horsepower (hp)
turbine compressors with a new 4,700 hp turbine compressor at the
Waynesburg CS. To transport gas for shippers supporting its proposal,
Columbia proposes to use 6,400 hp (of the total 9,400hp) that is
proposed in its concurrently filed Smithfield III Expansion Project in
Docket No. CP13-477-000. Columbia's proposal is referred to as the Line
1570 Project and is estimated to cost approximately $121,739,422.00,
all as more fully set forth in the application which is on file with
the Commission and open to public inspection. This filing is available
for review at the Commission in the Public Reference Room or may be
viewed on the Commission's Web site web at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding the application should be directed to
Fredric J. George, Senior Counsel, Columbia Gas Transmission, LLC, P.O.
Box 1273, Charleston, West Virginia, 25325-1273, by phone at 304-357-
2359 or by email at fgeorge@nisource.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit seven copies of filings made in the proceeding with the
Commission and must mail a copy to the applicant and to every other
party. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and seven copies of the protest or
[[Page 33400]]
intervention to the Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern Time on June 18, 2013.
Dated: May 24, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-13115 Filed 6-3-13; 8:45 am]
BILLING CODE 6717-01-P