Columbia Gas Transmission, LLC; Notice of Application, 33400 [2013-13114]
Download as PDF
33400
Federal Register / Vol. 78, No. 107 / Tuesday, June 4, 2013 / Notices
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on June 18, 2013.
Dated: May 24, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13115 Filed 6–3–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–477–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Application
Take notice that on May 10, 2013,
Columbia Gas Transmission, LLC
(Columbia) filed with the Federal
Energy Regulatory Commission an
application under section 7 of the
Natural Gas Act to construct, and
operate a new 9,400 horsepower (hp)
compressor station in Washington
County, Pennsylvania (Redd Farm CS);
two additional compressor units totaling
15,600 hp at its existing Glenville CS in
Gilmer County, West Virginia; new
station piping, control systems, and
other appurtenant facilities at its
existing Smithfield CS and Clendenin
CS in Wetzel and Kanawah Counties
respectively; and other minor
appurtenances at several other sites on
its system. Columbia’s proposal, known
as the Smithfield III Expansion Project,
will provide an additional 444 MDth per
day of delivery capacity from receipt
points in Pennsylvania and West
Virginia to an interconnection with
Columbia Gulf located near Leach,
Kentucky. The total cost of the project
is estimated to be approximately
$81,779,079.00, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. This filing is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the
application should be directed to
Fredric J. George, Senior Counsel,
Columbia Gas Transmission, LLC, P.O.
Box 1273, Charleston, West Virginia
VerDate Mar<15>2010
18:33 Jun 03, 2013
Jkt 229001
25325–1273, by phone at 304–357–2359
or by email at fgeorge@nisource.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and seven copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on June 18, 2013.
Dated: May 24, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–13114 Filed 6–3–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 13346–003]
Free Flow Power Corporation; Notice
Soliciting Scoping Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: P–13346–003.
c. Date filed: December 3, 2012.
d. Applicant: Free Flow Power
Corporation (Free Flow Power), on
behalf of its subsidiary PayneBridge,
LLC.
e. Name of Project: Williams Dam
Water Power Project.
f. Location: At the existing Williams
dam owned by the Indiana Department
E:\FR\FM\04JNN1.SGM
04JNN1
Agencies
[Federal Register Volume 78, Number 107 (Tuesday, June 4, 2013)]
[Notices]
[Page 33400]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13114]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP13-477-000]
Columbia Gas Transmission, LLC; Notice of Application
Take notice that on May 10, 2013, Columbia Gas Transmission, LLC
(Columbia) filed with the Federal Energy Regulatory Commission an
application under section 7 of the Natural Gas Act to construct, and
operate a new 9,400 horsepower (hp) compressor station in Washington
County, Pennsylvania (Redd Farm CS); two additional compressor units
totaling 15,600 hp at its existing Glenville CS in Gilmer County, West
Virginia; new station piping, control systems, and other appurtenant
facilities at its existing Smithfield CS and Clendenin CS in Wetzel and
Kanawah Counties respectively; and other minor appurtenances at several
other sites on its system. Columbia's proposal, known as the Smithfield
III Expansion Project, will provide an additional 444 MDth per day of
delivery capacity from receipt points in Pennsylvania and West Virginia
to an interconnection with Columbia Gulf located near Leach, Kentucky.
The total cost of the project is estimated to be approximately
$81,779,079.00, all as more fully set forth in the application which is
on file with the Commission and open to public inspection. This filing
is available for review at the Commission in the Public Reference Room
or may be viewed on the Commission's Web site web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding the application should be directed to
Fredric J. George, Senior Counsel, Columbia Gas Transmission, LLC, P.O.
Box 1273, Charleston, West Virginia 25325-1273, by phone at 304-357-
2359 or by email at fgeorge@nisource.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit seven copies of filings made in the proceeding with the
Commission and must mail a copy to the applicant and to every other
party. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and seven copies of the protest or intervention to
the Federal Energy regulatory Commission, 888 First Street NE.,
Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern Time on June 18, 2013.
Dated: May 24, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-13114 Filed 6-3-13; 8:45 am]
BILLING CODE 6717-01-P