Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 1; Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations, 33117-33120 [2013-13093]
Download as PDF
sroberts on DSK5SPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 106 / Monday, June 3, 2013 / Notices
6. Who will be required or asked to
report: Recipients of Federal Financial
Assistance provided by the NRC
(including Educational Institutions,
Other Nonprofit Organizations receiving
Federal Assistance, and Agreement
States).
7. An estimate of the number of
annual responses: 200.
8. The estimated number of annual
respondents: 200.
9. An estimate of the total number of
hours needed annually to complete the
requirement or request: 3,600 hours
(3,000 hrs. for reporting (5 hrs. per
respondent) and 600 hrs. for
recordkeeping (3 hrs. per
recordkeeper)).
10. Abstract: Part 5 implements the
provisions of Title IX of the Education
Amendments of 1972, as amended,
(except Sections 904 and 906 of these
amendments) (20 U.S.C. 1681, 1682,
1683, 1685, 1686, 1687, 1688), which is
designed to eliminate (with certain
exceptions) discrimination on the basis
of sex in any education program or
activity receiving Federal financial
assistance, whether or not such program
or activity is offered or sponsored by an
educational institution as defined in
these Title IX regulations.
The public may examine and have
copied for fee publicly available
documents, including the final
supporting statement, at the NRC’s
Public Document Room, Room O–1F21,
One White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852. The
OMB clearance requests are available at
the NRC’s Web site: https://www.nrc.gov/
public-involve/doc-comment/omb/. The
document will be available on the
NRC’s home page site for 60 days after
the signature date of this notice.
Comments and questions should be
directed to the OMB reviewer listed
below by July 3, 2013. Comments
received after this date will be
considered if it is practical to do so, but
assurance of consideration cannot be
given to comments received after this
date.
Chad Whiteman, Desk Officer, Office
of Information and Regulatory Affairs
(3150–0209), NEOB–10202, Office of
Management and Budget, Washington,
DC 20503.
Comments can also be emailed to
Chad_S_Whiteman@omb.eop.gov or
submitted by telephone at 202–395–
4718.
The NRC Clearance Officer is
Tremaine Donnell, 301–415–6258.
Dated at Rockville, Maryland, this 24th day
of May 2013.
VerDate Mar<15>2010
16:40 May 31, 2013
Jkt 229001
For the Nuclear Regulatory Commission.
Tremaine Donnell,
NRC Clearance Officer, Office of Information
Services.
[FR Doc. 2013–12976 Filed 5–31–13; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–390; NRC–2013–0109]
Tennessee Valley Authority; Watts Bar
Nuclear Plant, Unit 1; Applications and
Amendments to Facility Operating
Licenses Involving Proposed No
Significant Hazards Considerations
Nuclear Regulatory
Commission.
AGENCY:
License amendment request;
opportunity to comment, request a
hearing and petition for leave to
intervene.
ACTION:
Comments must be filed by June
17, 2013. A request for a hearing must
be filed by August 2, 2013.
DATES:
You may submit comment
by any of the following methods (unless
this document describes a different
method for submitting comments on a
specific subject):
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2013–0109. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–492–3668;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual(s) listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Cindy Bladey,
Chief, Rules, Announcements, and
Directives Branch (RADB), Office of
Administration, Mail Stop: TWB–05–
B01M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
For additional direction on accessing
information and submitting comments,
see ‘‘Accessing Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Andrew Hon, Project Manager, Office of
Nuclear Reactor Regulation, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–8480; email:
andrew.hon@nrc.gov.
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
33117
I. Accessing Information and
Submitting Comments
A. Accessing Information
Please refer to Docket ID NRC–2013–
0109 when contacting the NRC about
the availability of information regarding
this document. You may access
information related to this document,
which the NRC possesses and is
publicly-available, by the following
methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2013–0109.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publiclyavailable documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this notice (if
that document is available in ADAMS)
is provided the first time that a
document is referenced. The application
for amendment, dated May 22, 2013, is
available electronically in ADAMS
under Accession No. ML13143A166.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2013–
0109 in the subject line of your
comment submission, in order to ensure
that the NRC is able to make your
comment submission available to the
public in this docket.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC posts all comment
submissions at https://
www.regulations.gov as well as entering
the comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
E:\FR\FM\03JNN1.SGM
03JNN1
33118
Federal Register / Vol. 78, No. 106 / Monday, June 3, 2013 / Notices
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
sroberts on DSK5SPTVN1PROD with NOTICES
II. Introduction
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an amendment to Facility
Operating License No. 50–390, issued to
Tennessee Valley Authority (the
licensee), for operation of the Watts Bar
Nuclear Plant (WBN), Unit 1, located in
Tennessee, Rhea County.
The proposed amendment would
revise the WBN Unit 1 Technical
Specifications (TSs) to allow a one-time
extension to the Completion Time for
TS Limiting Condition for Operation
(LCO) 3.6.6 Required Action A.1 from
72 hours to 7 days for an inoperable
Containment Spray (CS) Train B. This
change is necessary to provide sufficient
time to replace a leaking mechanical
seal on CS Pump 1B–B. The pump
repair is currently scheduled for the
week of June 24, 2013. TVA requested
this proposed TS change under exigent
circumstances that the NRC expedite the
review of the requested change to
support approval by June 22, 2013.
Before issuance of the proposed
license amendment, the Commission
will have made findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and the Commission’s
regulations.
Section 50.91(a)(6) of Title 10 of the
Code of Federal Regulations (10 CFR)
for amendments to be granted under
exigent circumstances, the NRC staff
must determine that the amendment
request involves no significant hazards
consideration. Under the Commission’s
regulations in 10 CFR 50.92, this means
that operation of the facility in
accordance with the proposed
amendment would not (1) involve a
significant increase in the probability or
consequences of an accident previously
evaluated; or (2) create the possibility of
a new or different kind of accident from
any accident previously evaluated; or
(3) involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
The proposed change does not alter any
plant equipment or operating practices in
such a manner that the probability of an
accident is increased. The proposed change
will not alter assumptions relative to the
VerDate Mar<15>2010
16:40 May 31, 2013
Jkt 229001
mitigation of an accident or transient event.
The proposed change has been evaluated for
Incremental Core Damage Probability
(ICCDP) and Incremental Large Early Release
Probability (ICLERP) for the requested seven
day period of CS Train B inoperability, and
the results demonstrate that the change is
acceptable.
Therefore, this proposed change does not
increase the probability or consequences of
an accident previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
The proposed change does not involve a
physical alteration of the plant (no new or
different type of equipment will be installed)
or a change in the methods governing normal
plant operation.
Therefore, this proposed change does not
create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Based on the Operability of the required
containment ESF [engineered safety feature]
systems for containment heat removal, the
proposed change ensures that the accident
analysis assumptions continue to be met. The
design and operation of these systems are not
affected by the proposed change. The safety
analysis acceptance criteria are not altered by
the proposed change.
Therefore, the proposed change does not
involve a significant reduction in the margin
of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 14 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of the 14-day notice period.
However, should circumstances change
during the notice period, such that
failure to act in a timely way would
result, for example, in derating or
shutdown of the facility, the
Commission may issue the license
amendment before the expiration of the
14-day notice period, provided that its
final determination is that the
amendment involves no significant
hazards consideration. The final
determination will consider all public
and State comments received. Should
the Commission take this action, it will
publish in the Federal Register a notice
of issuance. The Commission expects
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
that the need to take this action will
occur very infrequently.
III. Opportunity To Request a Hearing;
Petition for Leave To Intervene
Within 60 days of this notice, any
person(s) whose interest may be affected
may file a request for hearing/petition to
intervene. As required by 10 CFR 2.309,
a petition for leave to intervene shall set
forth with particularity the interest of
the requestor/petitioner in the
proceeding, and how that interest may
be affected by the results of the
proceeding. The petition should
specifically explain the reasons why
intervention should be permitted with
particular reference to the following
general requirements: (1) The name,
address, and telephone number of the
requestor or petitioner; (2) the nature of
the requestor’s/petitioner’s right under
the Act to be made a party to the
proceeding; (3) the nature and extent of
the requestor’s/petitioner’s property,
financial, or other interest in the
proceeding; and (4) the possible effect of
any decision or order which may be
entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the requestor/
petitioner seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the requestor/petitioner shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The requestor/petitioner must
also provide references to those specific
sources and documents of which the
requestor/petitioner is aware and on
which the requestor/petitioner intends
to rely to establish those facts or expert
opinion. The requestor/petitioner must
provide sufficient information to show
that a genuine dispute exists with the
applicant on a material issue of law or
fact. Contentions shall be limited to
matters within the scope of the
amendment under consideration. The
contention must be one which, if
proven, would entitle the requestor/
petitioner to relief. A requestor/
petitioner who fails to satisfy these
requirements with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
E:\FR\FM\03JNN1.SGM
03JNN1
Federal Register / Vol. 78, No. 106 / Monday, June 3, 2013 / Notices
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, then any hearing held
would take place before the issuance of
any amendment.
sroberts on DSK5SPTVN1PROD with NOTICES
IV. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E-Filing rule
(72 FR 49139; August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
VerDate Mar<15>2010
16:40 May 31, 2013
Jkt 229001
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
apply-certificates.html. System
requirements for accessing the ESubmittal server are detailed in the
NRC’s ‘‘Guidance for Electronic
Submission,’’ which is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html. Participants may
attempt to use other software not listed
on the Web site, but should note that the
NRC’s E-Filing system does not support
unlisted software, and the NRC Meta
System Help Desk will not be able to
offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through the Electronic
Information Exchange System, users
will be required to install a Web
browser plug-in from the NRC’s Web
site. Further information on the Webbased submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with the NRC
guidance available on the NRC’s public
Web site at https://www.nrc.gov/sitehelp/e-submittals.html. A filing is
considered complete at the time the
documents are submitted through the
NRC’s E-Filing system. To be timely, an
electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the EFiling system time-stamps the document
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
PO 00000
Frm 00075
Fmt 4703
Sfmt 4703
33119
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC Meta System Help Desk through
the ‘‘Contact Us’’ link located on the
NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call to 1–866–672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) first class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852, Attention: Rulemaking
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/ehd/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. However, a request to
intervene will require including
information on local residence in order
to demonstrate a proximity assertion of
interest in the proceeding. With respect
E:\FR\FM\03JNN1.SGM
03JNN1
33120
Federal Register / Vol. 78, No. 106 / Monday, June 3, 2013 / Notices
to copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
Petitions for leave to intervene must
be filed no later than 30 days from June
3, 2013. Requests for hearing, petitions
for leave to intervene, and motions for
leave to file new or amended
contentions that are filed after the 60day deadline will not be entertained
absent a determination by the presiding
officer that the filing demonstrates good
cause by satisfying the following three
factors in 10 CFR 2.309(c)(1): (i) The
information upon which the filing is
based was not previously available; (ii)
the information upon which the filing is
based is materially different from
information previously available; and
(iii) the filing has been submitted in a
timely fashion based on the availability
of the subsequent information.
For further details with respect to this
exigent license application, see the
application for amendment dated May
22, 2013.
Attorney for licensee: General
Counsel, Tennessee Valley Authority,
400 West Summit Hill Drive, ET 11A,
Knoxville, Tennessee 37902.
Dated at Rockville, Maryland, this day of
May 24, 2013.
For the Nuclear Regulatory Commission.
Andrew Hon,
Project Manager, Plant Licensing Branch II–
2, Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 2013–13093 Filed 5–31–13; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2012–0070]
Final Interim Staff Guidance LR–ISG–
2011–04; Updated Aging Management
Criteria for Reactor Vessel Internal
Components for Pressurized Water
Reactors
Nuclear Regulatory
Commission.
ACTION: Interim staff guidance; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing the final
License Renewal Interim Staff Guidance
(LR–ISG), LR–ISG–2011–04, ‘‘Updated
Aging Management Criteria for Reactor
Vessel Internal Components for
Pressurized Water Reactors.’’ This final
LR–ISG revises the guidance in
NUREG–1800, Revision 2, ‘‘Standard
sroberts on DSK5SPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
16:40 May 31, 2013
Jkt 229001
Review Plan for Review of License
Renewal Applications for Nuclear
Power Plants’’ (SRP–LR) and NUREG–
1801, Revision 2, ‘‘Generic Aging
Lessons Learned Report’’ (GALL
Report), for the aging management of
Pressurized Water Reactors (PWR)
reactor vessel internals components
exposed to reactor coolant
environments.
ADDRESSES: Please refer to Docket ID
NRC–2012–0070 when contacting the
NRC about the availability of
information regarding this document.
You may access information related to
this document, which the NRC
possesses and is publicly available,
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2012–0070. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–492–3668;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual(s) listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publicly
available documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The LR–
ISG–2011–04 is available in ADAMS
under Accession No. ML12270A436.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
• NRC’s License Renewal Interim
Staff Guidance Web site: LR–ISG
documents are available online, for a
limited time, at https://www.nrc.gov/
reading-rm/doc-collections/isg/licenserenewal.html.
FOR FURTHER INFORMATION CONTACT: Mr.
On Yee, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–1905; email:
On.Yee@nrc.gov.
SUPPLEMENTARY INFORMATION:
Background Information
The NRC issues LR–ISGs to
communicate insights and lessons
learned and to address emergent issues
not covered in license renewal guidance
documents, such as the GALL Report
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
and SRP–LR. In this way, the NRC staff
and stakeholders may use the guidance
in an LR–ISG document before it is
incorporated into a formal license
renewal guidance document revision.
The NRC staff issues LR–ISGs in
accordance with the LR–ISG Process,
Revision 2 (ADAMS Accession No.
ML100920158), for which a notice of
availability was published in the
Federal Register on June 22, 2010 (75
FR 35510).
The NRC staff developed LR–ISG–
2011–04 to update its guidance in SRP–
LR and GALL Report based on the
conclusions of the NRC’s revised safety
evaluation on Electric Power Research
Institute (EPRI) Technical Report No.
1022863, Materials Reliability Program:
Pressurized Water Reactor Internals
Inspection and Evaluation Guidelines
(MRP–227–A), dated December 2011
(ADAMS Accession No. ML12017A193
[Transmittal letter from the EPRI–MRP]
and ADAMS Accession Nos.
ML12017A194, ML12017A196,
ML12017A197, ML12017A191,
ML12017A192, ML12017A195 and
ML12017A199 [Final Report]). The
NRC’s revised safety evaluation of EPRI
Technical Report No. 1022863 may be
accessed in ADAMS under Accession
No. ML11308A770. The LR–ISG–2011–
04 revises the recommendations in the
GALL Report and the NRC staff’s
acceptance criteria and review
procedures in the SRP–LR to ensure
consistency with MRP–227–A and
provides a framework to ensure that
PWR license renewal applicants will
adequately address age-related
degradation and aging management of
reactor vessel internal components
during the term of the renewed license.
On March 20, 2012, (77 FR 16270),
the NRC requested public comments on
draft LR–ISG–2011–04. Subsequently, as
published on April 19, 2012, (77 FR
23513), the NRC issued an editorial
correction to the original notice to
specifically identify the ADAMS
Accession No. for additional documents
associated with draft LR–ISG–2011–04.
The NRC received comments from the
Nuclear Energy Institute by letter dated
May 21, 2012 (ADAMS Accession No.
ML12144A147), and from the Electric
Power Research Institute and the
Pressurized Water Reactor Owners
Group Materials Subcommittee by letter
dated May, 21, 2012 (ADAMS Accession
No. ML12146A267). No other comments
were submitted. The NRC considered
these comments in developing the final
LR–ISG. Detailed responses to the
comments can be found in Appendix C
of the final LR–ISG.
The final LR–ISG–2011–04 is
approved for NRC staff and stakeholder
E:\FR\FM\03JNN1.SGM
03JNN1
Agencies
[Federal Register Volume 78, Number 106 (Monday, June 3, 2013)]
[Notices]
[Pages 33117-33120]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13093]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-390; NRC-2013-0109]
Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 1;
Applications and Amendments to Facility Operating Licenses Involving
Proposed No Significant Hazards Considerations
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment request; opportunity to comment, request a
hearing and petition for leave to intervene.
-----------------------------------------------------------------------
DATES: Comments must be filed by June 17, 2013. A request for a hearing
must be filed by August 2, 2013.
ADDRESSES: You may submit comment by any of the following methods
(unless this document describes a different method for submitting
comments on a specific subject):
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0109. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-492-
3668; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section
of this document.
Mail comments to: Cindy Bladey, Chief, Rules,
Announcements, and Directives Branch (RADB), Office of Administration,
Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
For additional direction on accessing information and submitting
comments, see ``Accessing Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Andrew Hon, Project Manager, Office of
Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001; telephone: 301-415-8480; email:
andrew.hon@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Accessing Information and Submitting Comments
A. Accessing Information
Please refer to Docket ID NRC-2013-0109 when contacting the NRC
about the availability of information regarding this document. You may
access information related to this document, which the NRC possesses
and is publicly-available, by the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0109.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly-available documents online in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number
for each document referenced in this notice (if that document is
available in ADAMS) is provided the first time that a document is
referenced. The application for amendment, dated May 22, 2013, is
available electronically in ADAMS under Accession No. ML13143A166.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2013-0109 in the subject line of your
comment submission, in order to ensure that the NRC is able to make
your comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC posts all comment submissions at https://www.regulations.gov as well as entering the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment
[[Page 33118]]
submissions to remove such information before making the comment
submissions available to the public or entering the comment submissions
into ADAMS.
II. Introduction
The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of an amendment to Facility Operating License No. 50-390,
issued to Tennessee Valley Authority (the licensee), for operation of
the Watts Bar Nuclear Plant (WBN), Unit 1, located in Tennessee, Rhea
County.
The proposed amendment would revise the WBN Unit 1 Technical
Specifications (TSs) to allow a one-time extension to the Completion
Time for TS Limiting Condition for Operation (LCO) 3.6.6 Required
Action A.1 from 72 hours to 7 days for an inoperable Containment Spray
(CS) Train B. This change is necessary to provide sufficient time to
replace a leaking mechanical seal on CS Pump 1B-B. The pump repair is
currently scheduled for the week of June 24, 2013. TVA requested this
proposed TS change under exigent circumstances that the NRC expedite
the review of the requested change to support approval by June 22,
2013.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
Section 50.91(a)(6) of Title 10 of the Code of Federal Regulations
(10 CFR) for amendments to be granted under exigent circumstances, the
NRC staff must determine that the amendment request involves no
significant hazards consideration. Under the Commission's regulations
in 10 CFR 50.92, this means that operation of the facility in
accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
The proposed change does not alter any plant equipment or
operating practices in such a manner that the probability of an
accident is increased. The proposed change will not alter
assumptions relative to the mitigation of an accident or transient
event. The proposed change has been evaluated for Incremental Core
Damage Probability (ICCDP) and Incremental Large Early Release
Probability (ICLERP) for the requested seven day period of CS Train
B inoperability, and the results demonstrate that the change is
acceptable.
Therefore, this proposed change does not increase the
probability or consequences of an accident previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
The proposed change does not involve a physical alteration of
the plant (no new or different type of equipment will be installed)
or a change in the methods governing normal plant operation.
Therefore, this proposed change does not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Based on the Operability of the required containment ESF
[engineered safety feature] systems for containment heat removal,
the proposed change ensures that the accident analysis assumptions
continue to be met. The design and operation of these systems are
not affected by the proposed change. The safety analysis acceptance
criteria are not altered by the proposed change.
Therefore, the proposed change does not involve a significant
reduction in the margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 14 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of the 14-day notice period. However, should circumstances
change during the notice period, such that failure to act in a timely
way would result, for example, in derating or shutdown of the facility,
the Commission may issue the license amendment before the expiration of
the 14-day notice period, provided that its final determination is that
the amendment involves no significant hazards consideration. The final
determination will consider all public and State comments received.
Should the Commission take this action, it will publish in the Federal
Register a notice of issuance. The Commission expects that the need to
take this action will occur very infrequently.
III. Opportunity To Request a Hearing; Petition for Leave To Intervene
Within 60 days of this notice, any person(s) whose interest may be
affected may file a request for hearing/petition to intervene. As
required by 10 CFR 2.309, a petition for leave to intervene shall set
forth with particularity the interest of the requestor/petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address, and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the requestor/petitioner
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
requestor/petitioner shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
requestor/petitioner must also provide references to those specific
sources and documents of which the requestor/petitioner is aware and on
which the requestor/petitioner intends to rely to establish those facts
or expert opinion. The requestor/petitioner must provide sufficient
information to show that a genuine dispute exists with the applicant on
a material issue of law or fact. Contentions shall be limited to
matters within the scope of the amendment under consideration. The
contention must be one which, if proven, would entitle the requestor/
petitioner to relief. A requestor/petitioner who fails to satisfy these
requirements with respect to at least one contention will not be
permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to
[[Page 33119]]
participate fully in the conduct of the hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, then any hearing
held would take place before the issuance of any amendment.
IV. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139;
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to request (1) a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a request or
petition for hearing (even in instances in which the participant, or
its counsel or representative, already holds an NRC-issued digital ID
certificate). Based upon this information, the Secretary will establish
an electronic docket for the hearing in this proceeding if the
Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in the NRC's ``Guidance for
Electronic Submission,'' which is available on the NRC's public Web
site at https://www.nrc.gov/site-help/e-submittals.html. Participants
may attempt to use other software not listed on the Web site, but
should note that the NRC's E-Filing system does not support unlisted
software, and the NRC Meta System Help Desk will not be able to offer
assistance in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through the Electronic Information Exchange System,
users will be required to install a Web browser plug-in from the NRC's
Web site. Further information on the Web-based submission form,
including the installation of the Web browser plug-in, is available on
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with the NRC guidance
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC's public
Web site at https://www.nrc.gov/site-help/e-submittals.html, by email to
MSHD.Resource@nrc.gov, or by a toll-free call to 1-866-672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) first class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information.
However, a request to intervene will require including information on
local residence in order to demonstrate a proximity assertion of
interest in the proceeding. With respect
[[Page 33120]]
to copyrighted works, except for limited excerpts that serve the
purpose of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
Petitions for leave to intervene must be filed no later than 30
days from June 3, 2013. Requests for hearing, petitions for leave to
intervene, and motions for leave to file new or amended contentions
that are filed after the 60-day deadline will not be entertained absent
a determination by the presiding officer that the filing demonstrates
good cause by satisfying the following three factors in 10 CFR
2.309(c)(1): (i) The information upon which the filing is based was not
previously available; (ii) the information upon which the filing is
based is materially different from information previously available;
and (iii) the filing has been submitted in a timely fashion based on
the availability of the subsequent information.
For further details with respect to this exigent license
application, see the application for amendment dated May 22, 2013.
Attorney for licensee: General Counsel, Tennessee Valley Authority,
400 West Summit Hill Drive, ET 11A, Knoxville, Tennessee 37902.
Dated at Rockville, Maryland, this day of May 24, 2013.
For the Nuclear Regulatory Commission.
Andrew Hon,
Project Manager, Plant Licensing Branch II-2, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2013-13093 Filed 5-31-13; 8:45 am]
BILLING CODE 7590-01-P