Intent to Prepare an Environmental Impact Statement for the Green River/Tusher Diversion Dam Rehabilitation Project, Emery/Grand County, UT, 33049-33051 [2013-13062]
Download as PDF
Federal Register / Vol. 78, No. 106 / Monday, June 3, 2013 / Notices
Notice of extension of public
scoping comment period.
ACTION:
Comments must be received no
later than July 8, 2013.
SUMMARY: The Mt. Baker-Snoqualmie
National Forest hereby gives notice that
it is extending the public scoping
comment period for the Green Mountain
Lookout Removal Project. A notice was
originally published in the Federal
Register on May 2, 2013 (Volume 78,
No. 85), beginning a 30 day comment
period. Please see the Notice of Intent
(FR Doc. 2013–10322) for more
information related to the project. In
response to requests for additional time,
the Forest Service will extend the
comment period from June 3, 2013, to
July 8, 2013.
ADDRESSES: Send written comments to
Todd Griffin, Project Leader, Mt. BakerSnoqualmie National Forest, 2930
Wetmore Avenue, Suite 3A, Everett,
Washington 98201. Comments may also
be sent via email to
toddgriffin@fs.fed.us, or via facsimile to
(425) 783–0141.
FOR FURTHER INFORMATION CONTACT:
Todd Griffin, Project Leader, at the
address listed above or by telephone
(360) 677–2258.
DATES:
Dated: May 28, 2013.
Steve Kuennen,
Acting Forest Supervisor.
[FR Doc. 2013–13008 Filed 5–31–13; 8:45 am]
BILLING CODE 3410–11–P
DEPARTMENT OF AGRICULTURE
Grain Inspection, Packers and
Stockyards Administration
Advisory Committee Meeting
Grain Inspection, Packers and
Stockyards Administration, USDA.
ACTION: Notice of advisory committee
meeting.
AGENCY:
Pursuant to the Federal
Advisory Committee Act, this
constitutes notice of the upcoming
meeting of the Grain Inspection, Packers
and Stockyards Administration (GIPSA)
Grain Inspection Advisory Committee
(Advisory Committee). The Advisory
Committee meets twice annually to
advise the GIPSA Administrator on the
programs and services that GIPSA
delivers under the U.S. Grain Standards
Act. Recommendations by the Advisory
Committee help GIPSA better meet the
needs of its customers who operate in a
dynamic and changing marketplace.
DATES: June 18, 2013, 8:00 a.m. to 4:30
p.m.; and June 19, 2010, 8:00 a.m. to
Noon.
sroberts on DSK5SPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
16:40 May 31, 2013
Jkt 229001
The Advisory Committee
meeting will take place at GIPSA’s
National Grain Center, 10383 N.
Ambassador Drive, Kansas City,
Missouri 64153.
Requests to orally address the
Advisory Committee during the meeting
or written comments may be sent to:
Administrator, GIPSA, U.S. Department
of Agriculture, 1400 Independence
Avenue SW., STOP 3601, Washington,
DC 20250–3601. Requests and
comments may also be faxed to (202)
690–2173.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Terri L. Henry by phone at (202) 205–
8281 or by email at
Terri.L.Henry@usda.gov.
The
purpose of the Advisory Committee is to
provide advice to the GIPSA
Administrator with respect to the
implementation of the U.S. Grain
Standards Act (7 U.S.C. 71–87k).
Information about the Advisory
Committee is available on the GIPSA
Web site at https://www.gipsa.usda.gov/
fgis/adcommit.html.
The agenda will include an overview
of Federal Grain Inspection Service
operations-market overview,
international programs, moisture meter
implementation, update on biotech
proficiency program, Field Management
Division updates and initiatives, and an
overview of the quality pilot in New
Orleans and results to date.
For a copy of the agenda please
contact Terri L. Henry by phone at (202)
205–8281 or by email at
Terri.L.Henry@usda.gov.
Public participation will be limited to
written statements unless permission is
received from the Committee
Chairperson to orally address the
Advisory Committee. The meeting will
be open to the public.
Persons with disabilities who require
alternative means of communication of
program information or related
accommodations should contact Terri L.
Henry at the telephone number listed
above.
SUPPLEMENTARY INFORMATION:
Larry Mitchell,
Administrator, Grain Inspection, Packers and
Stockyards Administration.
[FR Doc. 2013–13063 Filed 5–31–13; 8:45 am]
BILLING CODE 3410–KD–P
PO 00000
Frm 00005
Fmt 4703
Sfmt 4703
33049
DEPARTMENT OF AGRICULTURE
Natural Resources Conservation
Service
Intent to Prepare an Environmental
Impact Statement for the Green River/
Tusher Diversion Dam Rehabilitation
Project, Emery/Grand County, UT
Natural Resources
Conservation Service, USDA.
ACTION: Notice of Intent (NOI) to Prepare
an Environmental Impact Statement.
AGENCY:
Pursuant to section 102(2)(c)
of the National Environmental Policy
Act (NEPA) of 1969, 42 U.S.C. 4321–
4370d, as implemented by the Council
of Environmental Quality regulations
(40 CFR parts 1500–1508) and Natural
Resources Conservation Service (NRCS)
regulations that implement NEPA at 7
CFR part 650, the NRCS Utah State
Office announces its intent to prepare
an Environmental Impact Statement
(EIS) for the Green River/Tusher
Diversion Dam Rehabilitation project.
The purpose of this notice is to alert
interested parties regarding the intent to
prepare the EIS, to provide information
on the nature of the proposed action and
possible alternatives, and to invite
public participation in the EIS process
(including providing comments on the
scope of the draft EIS, to announce that
a public scoping meeting will be
conducted, and to identify cooperating
agency contacts). The EIS process will
evaluate alternatives recommended for
detailed study as a result of previous
planning-level studies completed by
NRCS and any additional (new)
alternatives identified during scoping.
DATES: Written comments on the scope
of the draft EIS, including the project’s
purpose and need, the alternatives to be
considered, types of issues that should
be addressed, associated research that
should be considered, and the
methodologies to be used in impact
evaluations should be sent to NRCS
starting on May 29, 2013 and ending on
or before June 28, 2013 (5:00 p.m. MDT),
to the address listed in the ADDRESSES
section below. Comments submitted
after June 28, 2013 will be considered to
the extent practicable by the project
team.
Two scoping meetings to present the
project and develop the scope of the EIS
will be held on Wednesday, June 12,
2013, via Tele-briefings. Participants
should call (800) 346–7359 (entry code
840561) at least fifteen minutes prior to
the meeting and an operator will
connect you to the Tele-briefing. The
first Tele-briefing will start at 2:00 p.m.
(MDT) with a formal presentation and
SUMMARY:
E:\FR\FM\03JNN1.SGM
03JNN1
sroberts on DSK5SPTVN1PROD with NOTICES
33050
Federal Register / Vol. 78, No. 106 / Monday, June 3, 2013 / Notices
last until 2:45 p.m. An informal
question and answer period will be held
from 2:45 p.m. to 4:00 p.m. The second
Tele-briefing will start at 6:00 p.m.
(MDT) with a formal presentation and
last until 6:45 p.m. An informal
question and answer period will be held
from 6:45 p.m. to 8:00 p.m. Presentation
materials will be available on the project
Web site (https://www.ut.nrcs.usda.gov/
programs/EWP/) for
participants to download prior to the
meeting.
Any individual who requires special
assistance to participate in a scoping
meeting, such as hard copy
documentation of the meeting or other
assistance, should contact Mr. Greg
Allington, McMillen, LLC, (208) 342–
4214 or greenriver@mcmillen-llc.com by
Friday, May 24, 2013 to allow sufficient
time for documents to be mailed or
special arrangements to be made.
Scoping meeting presentation
materials will be available on the NRCS
Utah Emergency Watershed Protection
Web site (https://www.ut.nrcs.usda.gov/
programs/EWP/) prior to the
meeting. Electronic copies of the
scoping materials may also be obtained
from Mr. Greg Allington, McMillen,
LLC, (208) 342–4214 or
greenriver@mcmillen-llc.com.
Representatives of Native American
tribal governments and of federal, State,
regional and local agencies that may
have an interest in any aspect of the
project will be invited to be cooperating
agencies, as appropriate.
ADDRESSES: Formal scoping comments
may be submitted via mail, email, fax,
or oral telephone comment to:
• Contact: Mr. Greg Allington,
McMillen, LLC,
• Mail: 1401 Shoreline Dr., Boise,
Idaho 83702
• Email: greenriver@mcmillen-llc.com
• Fax: (208) 342–4216
• Telephone: (208) 342–4214.
Details of the public scoping meeting
are given above under DATES.
Comments should be submitted by
close-of-business (5:00 p.m. MDT) June
28, 2013. Respondents should provide
contact information if you wish to be
included on the EIS mailing list. Please
note that any respondent’s entire
scoping comment, including their
personal contact information, may be
made publicly available at any time
during the EIS process.
FOR FURTHER INFORMATION CONTACT: Mr.
Bronson Smart, State Conservation
Engineer, Wallace F. Bennett Federal
Building, 125 South State Street, Room
4010, Salt Lake City, Utah 84138–1100,
or via email at
bronson.smart@ut.usda.gov. Information
VerDate Mar<15>2010
16:40 May 31, 2013
Jkt 229001
may also be obtained from Mr. Greg
Allington, McMillen, LLC, 1401
Shoreline Dr., Boise, Idaho 83702, or via
email at greenriver@mcmillen-llc.com.
SUPPLEMENTARY INFORMATION:
Background—The NRCS and Utah
Department of Agriculture and Food
(UDAF) are analyzing alternatives to
rehabilitate the Green River/Tusher
Diversion Dam due to damage from the
late 2010 and early 2011 flood events.
The dam was constructed in the early
1900’s and has been modified over the
years to maintain the structure. During
the 2010/2011 flood events, flows in the
Green River caused severe damage to
the diversion structure compromising
its structural integrity. If the dam fails,
water delivery to two irrigation canals,
a historic irrigation water wheel
delivery system, and one hydropower
plant would be eliminated.
The rehabilitation of the diversion
dam would be funded through the
NRCS Emergency Watershed Protection
(EWP) program (CFR, Title 7:
Agriculture, Part 624—Emergency
Watershed Protection) via technical
assistance and partial construction
funding. A National Environmental
Policy Act (NEPA) Programmatic EIS
was prepared by NRCS for the overall
EWP program in 2004; however, the
rehabilitation of this diversion dam does
not fit within the analysis parameters of
the Programmatic EIS. Therefore,
additional NEPA analysis is required for
this project.
The project started out under the
analysis of an Environmental
Assessment (EA) during the first
scoping period that was opened from
October 30, 2012 to November 30, 2012.
A public scoping meeting was held on
November 15, 2012 at Green River City
Hall in Green River, Utah. Through
additional consultation with the Utah
State Historic Preservation Office
(SHPO) under Section 106 of the
National Historic Preservation Act, it
was determined that the diversion dam
may be eligible for listing on the
National Register of Historic Places. Any
modifications to the dam may be
considered an ‘‘adverse effect’’ which
may make it ineligible for listing after
rehabilitation. A wide range of
alternatives is being considered for the
project as listed in the Alternatives
section below. Some of the impacts to
the diversion dam from these
alternatives may be considered
‘‘significant’’ to cultural resources and
as a result, NRCS has decided to prepare
an EIS for the project. The EIS will be
prepared consistent with Title 390, The
National Emergency Watershed
Protection Program Manual.
PO 00000
Frm 00006
Fmt 4703
Sfmt 4703
The Upper Colorado Endangered Fish
Recovery Program (Recovery Program) is
proposing to fund and install a fish
barrier in the west irrigation and
hydropower plant canal to prevent
Endangered Species Act (ESA) listed
fish species from entering the canal and/
or hydropower plant. As part of the dam
repair, upstream and downstream fish
passage may also be incorporated into
the design. These fish protection and
passage components are proposed for
inclusion in the Green River diversion
rehabilitation project to help reduce
mortality of ESA listed fish species
populations in the Green River.
Scoping Process—NRCS invites all
interested individuals and
organizations, public agencies, and
Native American Tribes to comment on
the scope of the EIS, including the
project’s purpose and need, alternatives
proposed to date, new alternatives that
should be considered, specific areas of
study that might be needed, and
evaluation methods to be used.
Background information including the
project purpose and need and
alternatives developed to date will be
available prior to the scoping meeting
on the NRCS Utah EWP Web site
(https://www.ut.nrcs.usda.gov/programs/
EWP/). Electronic and hard
copies of supporting documentation are
also available from Mr. Greg Allington,
McMillen, LLC, (208) 342–4214 or
greg.allington@mcmillen-llc.com.
Once the scope of the EIS is
confirmed upon the close of scoping,
NRCS will begin preparation of the draft
EIS. A summary of comments received
during the scoping period will be
compiled in a scoping report which will
be available on the NRCS Utah EWP
Web site.
Project Study Area and
Environmental Setting—The proposed
project is located approximately 6.6
miles north of the city of Green River in
Emery/Grand Counties, Utah. The
project study area includes land that is
unincorporated on both sides of the
Green River. The primary study area
includes the diversion dam where
rehabilitation activities would occur.
Secondary study areas include areas
required for alternatives of the project as
described in the Alternatives section
below such as the powerhouse raceway,
irrigation canal on the east side of the
diversion dam, construction staging
areas on both sides of the river, and
potential impacts to the river and
riparian area upstream of the diversion
dam.
The environmental setting for the
project area is primarily located in a
riverine environment surrounded by a
relatively narrow riparian plant
E:\FR\FM\03JNN1.SGM
03JNN1
sroberts on DSK5SPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 106 / Monday, June 3, 2013 / Notices
community adjacent to the river.
Beyond the riparian community are
agricultural fields on the east side of the
diversion dam and BLM land on the
west side of the diversion dam that is
primarily comprised of desert shrubs
and grasses.
Environmental resources consist of
the natural and man-made environment.
Preliminary resource concerns
associated with the rehabilitation of the
diversion dam may include both
beneficial and negative impacts to water
quality and supply, fish, threatened and
endangered species, cultural, recreation,
aesthetics, and public health and safety.
Alternatives—NRCS is analyzing the
following conceptual alternatives to
rehabilitate the diversion dam:
• Repair Existing Diversion Dam:
Repair the existing diversion to safely
pass flood events.
• Replace Existing Diversion Dam:
Demolish the existing diversion dam
and install a new dam in the same
location.
• Replace Diversion Dam
Downstream: Demolish the existing
diversion dam and install a new
diversion dam downstream.
• Replace Diversion Dam Upstream:
Demolish the existing diversion dam
and install a new diversion dam
upstream.
• Diversion Decommissioning:
Completely remove the diversion dam
from the river and stabilize the
diversion site. The existing water rights
at the dam would be supplemented via
pumping out of the river or other
options to provide water to the water
rights holders.
• Fish Passage Upstream/
Downstream: Construct a passage
system(s) on the dam to allow safe
upstream and downstream passage of
fish over the diversion dam.
• Electric Fish Barrier: Install an
electric fish barrier to prevent fish from
swimming into the powerhouse and
irrigation canal on the west side of the
diversion dam.
• Fish Barrier: Install a fish barrier to
prevent fish from swimming into
irrigation canal on the east side of the
diversion dam.
• Boat Passage Upstream/
Downstream: Construct a passage
system(s) on the dam to allow safe
downstream passage of boats past the
diversion dam.
NRCS will consider any viable
alternatives brought forward during
scoping if it is substantially different
from the alternatives described above.
NRCS will also study a No-Action
alternative which would consist of no
Federal money used for the
rehabilitation of the diversion dam.
VerDate Mar<15>2010
16:40 May 31, 2013
Jkt 229001
Cooperating Agencies—Federal, state,
and local agencies that may be
interested in or affected by the project
may request or be requested by NRCS to
become a cooperating agency in the
development of the EIS.
Signed this 24th day of May, 2013, in Salt
Lake City, Utah.
David C Brown,
Utah State Conservationist, Natural
Resources Conservation Service.
[FR Doc. 2013–13062 Filed 5–31–13; 8:45 am]
BILLING CODE 3410–16–P
DEPARTMENT OF AGRICULTURE
Natural Resources Conservation
Service
Non-Rock Alternatives to Shoreline
Protection Demonstration Project (LA–
16) Iberia, Jefferson, and Lafourche
Parishes, LA
Natural Resources
Conservation Service, Department of
Agriculture.
ACTION: Notice of Finding of No
Significant Impact.
AGENCY:
Pursuant to Section 102(2)(C)
of the National Environmental Policy
Act of 1969; the Council on
Environmental Quality Guidelines (40
CFR part 1500); and the Natural
Resources Conservation Service
Guidelines (7 CFR part 650); the Natural
Resources Conservation Service, U.S.
Department of Agriculture, gives notice
that an environmental impact statement
is not being prepared for the Non-Rock
Alternatives to Shoreline Protection
Demonstration Project (LA–16), Iberia,
Jefferson, and Lafourche Parishes,
Louisiana.
SUMMARY:
33051
shoreline protection systems will be
demonstrated in up to three (3) test sites
in coastal Louisiana. Up to five (5)
‘‘non-rock’’ shoreline protection systems
will be installed in 500 linear foot
sections at each site, extending a
maximum of 4,200 linear feet (including
buffer areas) along the shoreline at each
site. The sites selected include the
western side of the peninsula separating
Vermilion and Weeks Bay in Iberia
Parish; the southeast shoreline of Lake
Salvador in Jefferson Parish; and the
western shoreline of Bayou Perot in
Lafourche Parish.
The Notice of Finding of No
Significant Impact (FONSI) has been
forwarded to the Environmental
Protection Agency and to various
federal, state, and local agencies and
interested parties. A limited number of
copies of the FONSI are available to fill
single copy requests at the above
address. Basic data collected during the
environmental assessment are on file
and may be reviewed by contacting W.
Britt Paul.
No administrative action on
implementation of the proposal will be
taken until 30 days after the date of this
publication in the Federal Register.
W. Britt Paul,
Acting State Conservationist.
[FR Doc. 2013–13060 Filed 5–31–13; 8:45 am]
BILLING CODE 3410–16–P
DEPARTMENT OF COMMERCE
Foreign-Trade Zones Board
[B–53–2013]
FOR FURTHER INFORMATION CONTACT:
Notification of Proposed Production
Activity, The Gas Company, LLC dba
Hawai’i Gas, Subzone 9F (Synthetic
Natural Gas), Kapolei, Hawaii
An
environmental assessment of the
federally assisted action indicates that
the project will not cause significant
local, regional, or national impacts on
the environment. As a result of these
findings, W. Britt Paul, Acting State
Conservationist, has determined that
preparation and review of an
environmental impact statement is not
needed for this project.
The project will install and monitor
various shoreline protection systems in
areas of the state where physical,
logistical and environmental limitations
preclude the use of rock structures. The
The Gas Company, LLC dba Hawai’i
Gas (Hawai’i Gas), operator of Subzone
9F, submitted a notification of proposed
production activity to the Foreign-Trade
Zones (FTZ) Board for their facility in
Kapolei, Hawaii. The notification
conforming to the requirements of the
regulations of the FTZ Board (15 CFR
400.22) was received on May 22, 2013.
The subzone currently has authority
to produce synthetic natural gas, carbon
dioxide, hydrogen, hydrocarbon gas
mixtures and zinc sulfide using certain
foreign-status feedstocks produced
within Subzone 9A. The current request
would allow Hawai’i Gas to admit the
feedstocks listed below from any source
in foreign status. Pursuant to 15 CFR
400.14(b), FTZ activity would be limited
to the specific foreign-status materials
and components and specific finished
W.
Britt Paul, Acting State Conservationist,
Natural Resources Conservation Service,
3737 Government Street, Alexandria,
Louisiana 71302; telephone (318) 473–
7751.
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
E:\FR\FM\03JNN1.SGM
03JNN1
Agencies
[Federal Register Volume 78, Number 106 (Monday, June 3, 2013)]
[Notices]
[Pages 33049-33051]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-13062]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Natural Resources Conservation Service
Intent to Prepare an Environmental Impact Statement for the Green
River/Tusher Diversion Dam Rehabilitation Project, Emery/Grand County,
UT
AGENCY: Natural Resources Conservation Service, USDA.
ACTION: Notice of Intent (NOI) to Prepare an Environmental Impact
Statement.
-----------------------------------------------------------------------
SUMMARY: Pursuant to section 102(2)(c) of the National Environmental
Policy Act (NEPA) of 1969, 42 U.S.C. 4321-4370d, as implemented by the
Council of Environmental Quality regulations (40 CFR parts 1500-1508)
and Natural Resources Conservation Service (NRCS) regulations that
implement NEPA at 7 CFR part 650, the NRCS Utah State Office announces
its intent to prepare an Environmental Impact Statement (EIS) for the
Green River/Tusher Diversion Dam Rehabilitation project.
The purpose of this notice is to alert interested parties regarding
the intent to prepare the EIS, to provide information on the nature of
the proposed action and possible alternatives, and to invite public
participation in the EIS process (including providing comments on the
scope of the draft EIS, to announce that a public scoping meeting will
be conducted, and to identify cooperating agency contacts). The EIS
process will evaluate alternatives recommended for detailed study as a
result of previous planning-level studies completed by NRCS and any
additional (new) alternatives identified during scoping.
DATES: Written comments on the scope of the draft EIS, including the
project's purpose and need, the alternatives to be considered, types of
issues that should be addressed, associated research that should be
considered, and the methodologies to be used in impact evaluations
should be sent to NRCS starting on May 29, 2013 and ending on or before
June 28, 2013 (5:00 p.m. MDT), to the address listed in the ADDRESSES
section below. Comments submitted after June 28, 2013 will be
considered to the extent practicable by the project team.
Two scoping meetings to present the project and develop the scope
of the EIS will be held on Wednesday, June 12, 2013, via Tele-
briefings. Participants should call (800) 346-7359 (entry code 840561)
at least fifteen minutes prior to the meeting and an operator will
connect you to the Tele-briefing. The first Tele-briefing will start at
2:00 p.m. (MDT) with a formal presentation and
[[Page 33050]]
last until 2:45 p.m. An informal question and answer period will be
held from 2:45 p.m. to 4:00 p.m. The second Tele-briefing will start at
6:00 p.m. (MDT) with a formal presentation and last until 6:45 p.m. An
informal question and answer period will be held from 6:45 p.m. to 8:00
p.m. Presentation materials will be available on the project Web site
(https://www.ut.nrcs.usda.gov/programs/EWP/) for participants
to download prior to the meeting.
Any individual who requires special assistance to participate in a
scoping meeting, such as hard copy documentation of the meeting or
other assistance, should contact Mr. Greg Allington, McMillen, LLC,
(208) 342-4214 or llc.com">greenriver@mcmillen-llc.com by Friday, May 24, 2013
to allow sufficient time for documents to be mailed or special
arrangements to be made.
Scoping meeting presentation materials will be available on the
NRCS Utah Emergency Watershed Protection Web site (https://www.ut.nrcs.usda.gov/programs/EWP/) prior to the meeting.
Electronic copies of the scoping materials may also be obtained from
Mr. Greg Allington, McMillen, LLC, (208) 342-4214 or
llc.com">greenriver@mcmillen-llc.com. Representatives of Native American tribal
governments and of federal, State, regional and local agencies that may
have an interest in any aspect of the project will be invited to be
cooperating agencies, as appropriate.
ADDRESSES: Formal scoping comments may be submitted via mail, email,
fax, or oral telephone comment to:
Contact: Mr. Greg Allington, McMillen, LLC,
Mail: 1401 Shoreline Dr., Boise, Idaho 83702
Email: llc.com">greenriver@mcmillen-llc.com
Fax: (208) 342-4216
Telephone: (208) 342-4214.
Details of the public scoping meeting are given above under DATES.
Comments should be submitted by close-of-business (5:00 p.m. MDT) June
28, 2013. Respondents should provide contact information if you wish to
be included on the EIS mailing list. Please note that any respondent's
entire scoping comment, including their personal contact information,
may be made publicly available at any time during the EIS process.
FOR FURTHER INFORMATION CONTACT: Mr. Bronson Smart, State Conservation
Engineer, Wallace F. Bennett Federal Building, 125 South State Street,
Room 4010, Salt Lake City, Utah 84138-1100, or via email at
bronson.smart@ut.usda.gov. Information may also be obtained from Mr.
Greg Allington, McMillen, LLC, 1401 Shoreline Dr., Boise, Idaho 83702,
or via email at llc.com">greenriver@mcmillen-llc.com.
SUPPLEMENTARY INFORMATION:
Background--The NRCS and Utah Department of Agriculture and Food
(UDAF) are analyzing alternatives to rehabilitate the Green River/
Tusher Diversion Dam due to damage from the late 2010 and early 2011
flood events. The dam was constructed in the early 1900's and has been
modified over the years to maintain the structure. During the 2010/2011
flood events, flows in the Green River caused severe damage to the
diversion structure compromising its structural integrity. If the dam
fails, water delivery to two irrigation canals, a historic irrigation
water wheel delivery system, and one hydropower plant would be
eliminated.
The rehabilitation of the diversion dam would be funded through the
NRCS Emergency Watershed Protection (EWP) program (CFR, Title 7:
Agriculture, Part 624--Emergency Watershed Protection) via technical
assistance and partial construction funding. A National Environmental
Policy Act (NEPA) Programmatic EIS was prepared by NRCS for the overall
EWP program in 2004; however, the rehabilitation of this diversion dam
does not fit within the analysis parameters of the Programmatic EIS.
Therefore, additional NEPA analysis is required for this project.
The project started out under the analysis of an Environmental
Assessment (EA) during the first scoping period that was opened from
October 30, 2012 to November 30, 2012. A public scoping meeting was
held on November 15, 2012 at Green River City Hall in Green River,
Utah. Through additional consultation with the Utah State Historic
Preservation Office (SHPO) under Section 106 of the National Historic
Preservation Act, it was determined that the diversion dam may be
eligible for listing on the National Register of Historic Places. Any
modifications to the dam may be considered an ``adverse effect'' which
may make it ineligible for listing after rehabilitation. A wide range
of alternatives is being considered for the project as listed in the
Alternatives section below. Some of the impacts to the diversion dam
from these alternatives may be considered ``significant'' to cultural
resources and as a result, NRCS has decided to prepare an EIS for the
project. The EIS will be prepared consistent with Title 390, The
National Emergency Watershed Protection Program Manual.
The Upper Colorado Endangered Fish Recovery Program (Recovery
Program) is proposing to fund and install a fish barrier in the west
irrigation and hydropower plant canal to prevent Endangered Species Act
(ESA) listed fish species from entering the canal and/or hydropower
plant. As part of the dam repair, upstream and downstream fish passage
may also be incorporated into the design. These fish protection and
passage components are proposed for inclusion in the Green River
diversion rehabilitation project to help reduce mortality of ESA listed
fish species populations in the Green River.
Scoping Process--NRCS invites all interested individuals and
organizations, public agencies, and Native American Tribes to comment
on the scope of the EIS, including the project's purpose and need,
alternatives proposed to date, new alternatives that should be
considered, specific areas of study that might be needed, and
evaluation methods to be used.
Background information including the project purpose and need and
alternatives developed to date will be available prior to the scoping
meeting on the NRCS Utah EWP Web site (https://www.ut.nrcs.usda.gov/programs/EWP/). Electronic and hard copies of supporting
documentation are also available from Mr. Greg Allington, McMillen,
LLC, (208) 342-4214 or llc.com">greg.allington@mcmillen-llc.com.
Once the scope of the EIS is confirmed upon the close of scoping,
NRCS will begin preparation of the draft EIS. A summary of comments
received during the scoping period will be compiled in a scoping report
which will be available on the NRCS Utah EWP Web site.
Project Study Area and Environmental Setting--The proposed project
is located approximately 6.6 miles north of the city of Green River in
Emery/Grand Counties, Utah. The project study area includes land that
is unincorporated on both sides of the Green River. The primary study
area includes the diversion dam where rehabilitation activities would
occur. Secondary study areas include areas required for alternatives of
the project as described in the Alternatives section below such as the
powerhouse raceway, irrigation canal on the east side of the diversion
dam, construction staging areas on both sides of the river, and
potential impacts to the river and riparian area upstream of the
diversion dam.
The environmental setting for the project area is primarily located
in a riverine environment surrounded by a relatively narrow riparian
plant
[[Page 33051]]
community adjacent to the river. Beyond the riparian community are
agricultural fields on the east side of the diversion dam and BLM land
on the west side of the diversion dam that is primarily comprised of
desert shrubs and grasses.
Environmental resources consist of the natural and man-made
environment. Preliminary resource concerns associated with the
rehabilitation of the diversion dam may include both beneficial and
negative impacts to water quality and supply, fish, threatened and
endangered species, cultural, recreation, aesthetics, and public health
and safety.
Alternatives--NRCS is analyzing the following conceptual
alternatives to rehabilitate the diversion dam:
Repair Existing Diversion Dam: Repair the existing
diversion to safely pass flood events.
Replace Existing Diversion Dam: Demolish the existing
diversion dam and install a new dam in the same location.
Replace Diversion Dam Downstream: Demolish the existing
diversion dam and install a new diversion dam downstream.
Replace Diversion Dam Upstream: Demolish the existing
diversion dam and install a new diversion dam upstream.
Diversion Decommissioning: Completely remove the diversion
dam from the river and stabilize the diversion site. The existing water
rights at the dam would be supplemented via pumping out of the river or
other options to provide water to the water rights holders.
Fish Passage Upstream/Downstream: Construct a passage
system(s) on the dam to allow safe upstream and downstream passage of
fish over the diversion dam.
Electric Fish Barrier: Install an electric fish barrier to
prevent fish from swimming into the powerhouse and irrigation canal on
the west side of the diversion dam.
Fish Barrier: Install a fish barrier to prevent fish from
swimming into irrigation canal on the east side of the diversion dam.
Boat Passage Upstream/Downstream: Construct a passage
system(s) on the dam to allow safe downstream passage of boats past the
diversion dam.
NRCS will consider any viable alternatives brought forward during
scoping if it is substantially different from the alternatives
described above. NRCS will also study a No-Action alternative which
would consist of no Federal money used for the rehabilitation of the
diversion dam.
Cooperating Agencies--Federal, state, and local agencies that may
be interested in or affected by the project may request or be requested
by NRCS to become a cooperating agency in the development of the EIS.
Signed this 24th day of May, 2013, in Salt Lake City, Utah.
David C Brown,
Utah State Conservationist, Natural Resources Conservation Service.
[FR Doc. 2013-13062 Filed 5-31-13; 8:45 am]
BILLING CODE 3410-16-P