Combined Notice of Filings, 32644 [2013-12936]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
32644
Federal Register / Vol. 78, No. 105 / Friday, May 31, 2013 / Notices
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: July 15, 2013.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
m. The application is not ready for
environmental analysis at this time.
n. The Corbett Project would consist
of the following features: (1) The
existing 10-inch-diameter, 2-mile-long
buried steel pipeline from the North
Fork diversion structure; (2) the existing
10-inch-diameter, 2-mile-long buried
ductile iron pipeline from the South
Fork diversion structure; (3) a new 10kilowatt Turgo turbine; (4) a small new
building housing the turbine, induction
motor generator, and controls
constructed atop an existing filter pond
influent diversion structure; and (5)
appurtenant facilities. The project’s
power would be used to offset power
needs at the water treatment plant. The
project is estimated to generate about
8.4 megawatt-hours annually. The
project would be located on both private
and federal lands.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
VerDate Mar<15>2010
17:40 May 30, 2013
Jkt 229001
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate
(e.g., if scoping is waived, the schedule
would be shortened).
Issue Deficiency and/or Additional
Information Request—July 2013
Issue Notice of Acceptance—August
2013
Issue Scoping Document—August 2013
Issue Notice of Ready for Environmental
Analysis—October 2013
Commission issues EA—February 2013
Dated: May 23, 2013.
Kimberly D. Bose,
Secretary.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated: May 24, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–12936 Filed 5–30–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2013–12889 Filed 5–30–13; 8:45 am]
[Project No. 14468–000]
BILLING CODE 6717–01–P
Las Vegas Wash Hydro LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP13–480–000.
Applicants: Columbia Gas
Transmission, LLC, and Columbia Gulf
Transmission, LLC.
Description: Columbia Gas
Transmission, LLC and Columbia Gulf
Transmission, LLC submit Joint
Application for Authorization to Lease
and Abandon Capacity.
Filed Date: 5/15/13.
Accession Number: 20130515–5099.
Comments Due: 5 p.m. ET 5/31/13.
Docket Numbers: RP13–927–000.
Applicants: Ozark Gas Transmission,
L.L.C.
Description: May 2013 Clean-up
Filing to be effective 7/1/2013.
Filed Date: 5/24/13.
Accession Number: 20130524–5022.
Comments Due: 5 p.m. ET 6/5/13.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
On November 16, 2012, Las Vegas
Wash Hydro LLC, filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Las Vegas Wash Hydroelectric
Project (project) to be located on the Las
Vegas Wash, in Clark County, Nevada.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
an existing concrete diversion/inlet
structure for the Las Vegas Wash that
passes beneath Lake Las Vegas via two
84-inch-diameter penstocks for a
distance of 10,208 feet. Las Vegas Wash
Hydro LLC proposes to tie into the
existing penstocks and construct a new
powerhouse. One of the two existing 84inch diameter penstocks would be
E:\FR\FM\31MYN1.SGM
31MYN1
Agencies
[Federal Register Volume 78, Number 105 (Friday, May 31, 2013)]
[Notices]
[Page 32644]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-12936]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP13-480-000.
Applicants: Columbia Gas Transmission, LLC, and Columbia Gulf
Transmission, LLC.
Description: Columbia Gas Transmission, LLC and Columbia Gulf
Transmission, LLC submit Joint Application for Authorization to Lease
and Abandon Capacity.
Filed Date: 5/15/13.
Accession Number: 20130515-5099.
Comments Due: 5 p.m. ET 5/31/13.
Docket Numbers: RP13-927-000.
Applicants: Ozark Gas Transmission, L.L.C.
Description: May 2013 Clean-up Filing to be effective 7/1/2013.
Filed Date: 5/24/13.
Accession Number: 20130524-5022.
Comments Due: 5 p.m. ET 6/5/13.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, and service can be found at:
https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other
information, call (866) 208-3676 (toll free). For TTY, call (202) 502-
8659.
Dated: May 24, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-12936 Filed 5-30-13; 8:45 am]
BILLING CODE 6717-01-P