Federal Register / Vol. 78, No. 104 / Thursday, May 30, 2013 / Notices
Accordingly, his motion to intervene is
denied.5
Under section 313(a) of the Federal
Power Act, 16 U.S.C. 825l (2006), a
request for rehearing may be filed only
by a party to the proceeding. Pat
Kelleher is not a party to this
proceeding. Therefore, his request for
rehearing is rejected.
This notice constitutes final agency
action. Requests for rehearing by the
Commission of this notice must be filed
within 30 days of the date of issuance
of this notice pursuant to section 313(a)
of the FPA, 16 U.S.C. 825l (2006), and
section 385.713 of the Commission’s
regulations, 18 CFR 385.713 (2012).
Dated: May 21, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–12785 Filed 5–29–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL13–64–000]
TKELLEY on DSK3SPTVN1PROD with NOTICES
Exelon Generation Company, LLC;
CER Generation II, LLC; Constellation
Mystic Power, LLC; Constellation
NewEnergy, Inc.; Constellation Power
Source Generation, Inc.; Criterion
Power Partners, LLC; Notice of Petition
for Declaratory Order
Take notice that on May 16, 2013,
pursuant to section 305(a) of the Federal
Power Act (FPA), 16 USC 825d(a) and
Rule 207of the Federal Energy
Regulatory Commission’s (Commission)
Rules of Practice and Procedure, 18 CFR
385.207, Exelon Generation Company,
LLC, CER Generation II, LLC,
Constellation Mystic Power, LLC,
Constellation NewEnergy, Inc.,
Constellation Power Source Generation,
Inc. and Criterion Power Partners, LLC
(collectively, Petitioner) filed a petition
for declaratory order requesting that the
Commission declare that the payment of
dividends, as more fully described in
this petition, are not implicated by
section 305(a) of the FPA.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
5 See Alabama Power Co., 141 FERC ¶ 61,039
(2012); Union Electric Co., 140 FERC ¶ 61,210
(2012); Alabama Power Co., 140 FERC ¶ 61,037
(2012); PPL Holtwood, LLC, 140 FERC ¶ 61,038
(2012).
VerDate Mar<15>2010
16:25 May 29, 2013
Jkt 229001
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on June 17, 2013.
Dated: May 21, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–12786 Filed 5–29–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13630–001]
Lewis County Development
Corporation; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On May 2, 2013, the Lewis County
Development Corporation (Lewis
County Corp), filed an application for a
successive preliminary permit, pursuant
to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Croghan Dam Hydroelectric
Project (project) to be located at the
existing Croghan Dam, on the Beaver
River, in Lewis County, New York. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
32385
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist
of: (1) An existing concrete gravity dam
structure consisting of an 11.5-foot-high
by 120-foot-long section, and a 9.5-foothigh by 103-foot-long section; (2) an
existing impoundment with a normal
water surface elevation of 818 feet mean
sea level extending 2.7 miles upstream;
(3) a new 75-foot-long by 35-foot-wide
powerhouse; (4) a new turbine generator
unit with a total installed capacity of
500 kilowatts; (5) a new 13.2-kilovolt
transmission line interconnecting with
the National Grid; and (6) appurtenant
facilities. The proposed project would
operate in run-of-river mode and
generate an estimated average annual
generation of 1,387 megawatt-hours.
Applicant Contact: Larry Dolhof,
Lewis County Development
Corporation, P.O. Box 308, Lyons Falls,
NY 13368, (315) 348–4066.
FERC Contact: Timothy Looney, (202)
502–6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
E:\FR\FM\30MYN1.SGM
30MYN1
Agencies
[Federal Register Volume 78, Number 104 (Thursday, May 30, 2013)]
[Notices]
[Page 32385]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-12786]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL13-64-000]
Exelon Generation Company, LLC; CER Generation II, LLC;
Constellation Mystic Power, LLC; Constellation NewEnergy, Inc.;
Constellation Power Source Generation, Inc.; Criterion Power Partners,
LLC; Notice of Petition for Declaratory Order
Take notice that on May 16, 2013, pursuant to section 305(a) of the
Federal Power Act (FPA), 16 USC 825d(a) and Rule 207of the Federal
Energy Regulatory Commission's (Commission) Rules of Practice and
Procedure, 18 CFR 385.207, Exelon Generation Company, LLC, CER
Generation II, LLC, Constellation Mystic Power, LLC, Constellation
NewEnergy, Inc., Constellation Power Source Generation, Inc. and
Criterion Power Partners, LLC (collectively, Petitioner) filed a
petition for declaratory order requesting that the Commission declare
that the payment of dividends, as more fully described in this
petition, are not implicated by section 305(a) of the FPA.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Petitioner.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on June 17, 2013.
Dated: May 21, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-12786 Filed 5-29-13; 8:45 am]