Public Utility District No. 1 of Snohomish County; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests, 31912-31913 [2013-12506]
Download as PDF
31912
Federal Register / Vol. 78, No. 102 / Tuesday, May 28, 2013 / Notices
special needs. If you require special
accommodations due to a disability,
please contact Menice Santistevan at
least seven days in advance of the
meeting at the telephone number listed
above. Written statements may be filed
with the Committees either before or
after the meeting. Individuals who wish
to make oral statements pertaining to
agenda items should contact Menice
Santistevan at the address or telephone
number listed above. Requests must be
received five days prior to the meeting
and reasonable provision will be made
to include the presentation in the
agenda. The Deputy Designated Federal
Officer is empowered to conduct the
meeting in a fashion that will facilitate
the orderly conduct of business.
Individuals wishing to make public
comments will be provided a maximum
of five minutes to present their
comments.
Minutes: Minutes will be available by
writing or calling Menice Santistevan at
the address or phone number listed
above. Minutes and other Board
documents are on the Internet at:
https://www.nnmcab.energy.gov/.
Issued at Washington, DC on May 21, 2013.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2013–12559 Filed 5–24–13; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14295–001]
mstockstill on DSK4VPTVN1PROD with NOTICES
Public Utility District No. 1 of
Snohomish County; Notice of Intent To
File License Application, Filing of PreApplication Document (PAD),
Commencement of Pre-Filing Process,
and Scoping; Request for Comments
on the PAD and Scoping Document,
and Identification of Issues and
Associated Study Requests
a. Type of Filing: Notice of Intent to
File License Application for an Original
License and Commencing Pre-filing
Process.
b. Project No.: 14295–001.
c. Dated Filed: March 21, 2013.
d. Submitted By: Public Utility
District No. 1 of Snohomish County
(Snohomish PUD).
e. Name of Project: Sunset Fish
Passage and Energy Project.
f. Location: On the South Fork
Skykomish River, one mile south of the
town of Index in Snohomish County,
Washington. The project would not
occupy federal lands.
VerDate Mar<15>2010
17:46 May 24, 2013
Jkt 229001
g. Filed Pursuant to: 18 CFR Part 5 of
the Commission’s Regulations
h. Potential Applicant Contact: Kim
D. Moore, Assistant General Manager of
Generation, Water and Corporate
Services, Public Utility District No. 1 of
Snohomish County, 2320 California
Street, PO Box 1107, Everett, WA 98206.
i. FERC Contact: John Baummer at
(202) 502–6837 or email at
john.baummer@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item o below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
Part 402; (b) NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management
Act and implementing regulations at 50
CFR 600.920; and (c) the State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Snohomish PUD as the Commission’s
non-federal representative for carrying
out informal consultation, pursuant to
section 7 of the Endangered Species Act,
section 305 of the Magnuson-Stevens
Fishery Conservation and Management
Act, and section 106 of the National
Historic Preservation Act.
m. Snohomish PUD filed with the
Commission a Pre-Application
Document (PAD; including a proposed
process plan and schedule), pursuant to
18 CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
for inspection and reproduction at the
address in paragraph h.
Register online at https://www.ferc.
gov/docs-filing/esubscription.asp to be
notified via email of new filing and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
o. With this notice, we are soliciting
comments on the PAD and
Commission’s staff Scoping Document 1
(SD1), as well as study requests. All
comments on the PAD and SD1, and
study requests should be sent to the
address above in paragraph h. In
addition, all comments on the PAD and
SD1, study requests, requests for
cooperating agency status, and all
communications to and from
Commission staff related to the merits of
the potential application must be filed
with the Commission. Documents may
be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
send documents to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426.
All filings with the Commission must
include on the first page, the project
name (Sunset Falls Fish Passage and
Energy Project) and number (P–14295–
001), and bear the appropriate heading:
‘‘Comments on Pre-Application
Document,’’ ‘‘Study Requests,’’
‘‘Comments on Scoping Document 1,’’
‘‘Request for Cooperating Agency
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by July 19, 2013.
p. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, this
meeting will satisfy the NEPA scoping
requirements, irrespective of whether an
EA or EIS is issued by the Commission.
E:\FR\FM\28MYN1.SGM
28MYN1
Federal Register / Vol. 78, No. 102 / Tuesday, May 28, 2013 / Notices
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the time and place noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Evening Scoping Meeting
Date: Wednesday, June 12, 2013.
Time: 6:00 p.m.
Location: Town of Index Fire
Department, 512 Avenue A, Index,
WA 98256
Phone: (360) 793–0866
Daytime Scoping Meeting
Date: Thursday, June 13, 2013
Time: 10:00 a.m.
Location: Washington Department of
Ecology Headquarters, 300 Desmond
Drive SE., Lacey, WA 98503
Phone: (360) 407–6000
Scoping Document 1 (SD1), which
outlines the subject areas to be
addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
mstockstill on DSK4VPTVN1PROD with NOTICES
Environmental Site Review
Snohomish PUD will conduct an
environmental site review of the project
on Wednesday, June 12, 2013, starting at
2:00 p.m. All participants should meet
at the Gold Bar Park and Ride, located
at Intersection State Road 2 and 2nd
Street, Gold Bar, WA 98251. All
participants are responsible for their
own transportation. Anyone with
questions about the site visit should
contact Ms. Dawn Pressler of
Snohomish PUD at (425) 783–1709 on
or before June 6, 2013.
VerDate Mar<15>2010
17:46 May 24, 2013
Jkt 229001
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
Dated: May 20, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–12506 Filed 5–24–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP13–914–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Tenaska Negotiated Rate
Agreement to be effective 5/16/2013.
Filed Date: 5/16/13.
Accession Number: 20130516–5046.
Comments Due: 5 p.m. ET 5/28/13.
Docket Numbers: RP13–915–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Macquarie Negotiated
Rate Agreement to be effective
5/16/2013.
Filed Date: 5/16/13.
Accession Number: 20130516–5055.
Comments Due: 5 p.m. ET 5/28/13.
Docket Numbers: RP13–916–000.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
31913
Applicants: Natural Gas Pipeline
Company of America.
Description: Renaissance LPS–RO to
be effective 5/16/2013.
Filed Date: 5/16/13.
Accession Number: 20130516–5095.
Comments Due: 5 p.m. ET 5/28/13.
Docket Numbers: RP13–917–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: NJR Energy Negotiated
Rate Agreement to be effective
5/16/2013.
Filed Date: 5/16/13.
Accession Number: 20130516–5104.
Comments Due: 5 p.m. ET 5/28/13.
Docket Numbers: RP13–918–000.
Applicants: White River Hub, LLC.
Description: 2013 Fuel Gas
Reimbursement Report of White River
Hub, LLC.
Filed Date: 5/16/13.
Accession Number: 20130516–5140.
Comments Due: 5 p.m. ET 5/28/13.
Docket Numbers: RP13–919–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Natural Gas Pipeline
Company of America LLC submits tariff
filing per 154.204: Negotiated Rate
Filing—Interstate Power to be effective
5/21/2013.
Filed Date: 5/17/13.
Accession Number: 20130517–5131.
Comments Due: 5 p.m. ET 5/29/13.
Docket Numbers: RP13–920–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Natural Gas Pipeline
Company of America LLC submits tariff
filing per 154.204: BP Canada Energy
Negotiated Rate to be effective 6/1/2013.
Filed Date: 5/17/13.
Accession Number: 20130517–5146.
Comments Due: 5 p.m. ET 5/29/13.
Docket Numbers: RP13–921–000.
Applicants: Empire Pipeline, Inc.
Description: Empire Pipeline, Inc.
submits tariff filing per 154.204:
Correction to GTC Sec 14 to be effective
10/28/2011.
Filed Date: 5/17/13.
Accession Number: 20130517–5151.
Comments Due: 5 p.m. ET 5/29/13.
Docket Numbers: RP13–922–000.
Applicants: Equitrans, L.P.
Description: Equitrans, L.P. submits
tariff filing per 154.203: Compliance
Filing—Sunrise Retainage to be effective
7/1/2013.
Filed Date: 5/20/13.
Accession Number: 20130520–5024.
Comments Due: 5 p.m. ET 6/3/13.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
E:\FR\FM\28MYN1.SGM
28MYN1
Agencies
[Federal Register Volume 78, Number 102 (Tuesday, May 28, 2013)]
[Notices]
[Pages 31912-31913]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-12506]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14295-001]
Public Utility District No. 1 of Snohomish County; Notice of
Intent To File License Application, Filing of Pre-Application Document
(PAD), Commencement of Pre-Filing Process, and Scoping; Request for
Comments on the PAD and Scoping Document, and Identification of Issues
and Associated Study Requests
a. Type of Filing: Notice of Intent to File License Application for
an Original License and Commencing Pre-filing Process.
b. Project No.: 14295-001.
c. Dated Filed: March 21, 2013.
d. Submitted By: Public Utility District No. 1 of Snohomish County
(Snohomish PUD).
e. Name of Project: Sunset Fish Passage and Energy Project.
f. Location: On the South Fork Skykomish River, one mile south of
the town of Index in Snohomish County, Washington. The project would
not occupy federal lands.
g. Filed Pursuant to: 18 CFR Part 5 of the Commission's Regulations
h. Potential Applicant Contact: Kim D. Moore, Assistant General
Manager of Generation, Water and Corporate Services, Public Utility
District No. 1 of Snohomish County, 2320 California Street, PO Box
1107, Everett, WA 98206.
i. FERC Contact: John Baummer at (202) 502-6837 or email at
john.baummer@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item o below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See 94 FERC ]
61,076 (2001).
k. With this notice, we are initiating informal consultation with:
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under
section 7 of the Endangered Species Act and the joint agency
regulations thereunder at 50 CFR Part 402; (b) NOAA Fisheries under
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act and implementing regulations at 50 CFR 600.920; and (c)
the State Historic Preservation Officer, as required by section 106,
National Historical Preservation Act, and the implementing regulations
of the Advisory Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Snohomish PUD as the
Commission's non-federal representative for carrying out informal
consultation, pursuant to section 7 of the Endangered Species Act,
section 305 of the Magnuson-Stevens Fishery Conservation and Management
Act, and section 106 of the National Historic Preservation Act.
m. Snohomish PUD filed with the Commission a Pre-Application
Document (PAD; including a proposed process plan and schedule),
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in paragraph h.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. With this notice, we are soliciting comments on the PAD and
Commission's staff Scoping Document 1 (SD1), as well as study requests.
All comments on the PAD and SD1, and study requests should be sent to
the address above in paragraph h. In addition, all comments on the PAD
and SD1, study requests, requests for cooperating agency status, and
all communications to and from Commission staff related to the merits
of the potential application must be filed with the Commission.
Documents may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, send documents to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
All filings with the Commission must include on the first page, the
project name (Sunset Falls Fish Passage and Energy Project) and number
(P-14295-001), and bear the appropriate heading: ``Comments on Pre-
Application Document,'' ``Study Requests,'' ``Comments on Scoping
Document 1,'' ``Request for Cooperating Agency Status,'' or
``Communications to and from Commission Staff.'' Any individual or
entity interested in submitting study requests, commenting on the PAD
or SD1, and any agency requesting cooperating status must do so by July
19, 2013.
p. Although our current intent is to prepare an environmental
assessment (EA), there is the possibility that an Environmental Impact
Statement (EIS) will be required. Nevertheless, this meeting will
satisfy the NEPA scoping requirements, irrespective of whether an EA or
EIS is issued by the Commission.
[[Page 31913]]
Scoping Meetings
Commission staff will hold two scoping meetings in the vicinity of
the project at the time and place noted below. The daytime meeting will
focus on resource agency, Indian tribes, and non-governmental
organization concerns, while the evening meeting is primarily for
receiving input from the public. We invite all interested individuals,
organizations, and agencies to attend one or both of the meetings, and
to assist staff in identifying particular study needs, as well as the
scope of environmental issues to be addressed in the environmental
document. The times and locations of these meetings are as follows:
Evening Scoping Meeting
Date: Wednesday, June 12, 2013.
Time: 6:00 p.m.
Location: Town of Index Fire Department, 512 Avenue A, Index, WA 98256
Phone: (360) 793-0866
Daytime Scoping Meeting
Date: Thursday, June 13, 2013
Time: 10:00 a.m.
Location: Washington Department of Ecology Headquarters, 300 Desmond
Drive SE., Lacey, WA 98503
Phone: (360) 407-6000
Scoping Document 1 (SD1), which outlines the subject areas to be
addressed in the environmental document, was mailed to the individuals
and entities on the Commission's mailing list. Copies of SD1 will be
available at the scoping meetings, or may be viewed on the web at
https://www.ferc.gov, using the ``eLibrary'' link. Follow the directions
for accessing information in paragraph n. Based on all oral and written
comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a
revised process plan and schedule, as well as a list of issues,
identified through the scoping process.
Environmental Site Review
Snohomish PUD will conduct an environmental site review of the
project on Wednesday, June 12, 2013, starting at 2:00 p.m. All
participants should meet at the Gold Bar Park and Ride, located at
Intersection State Road 2 and 2nd Street, Gold Bar, WA 98251. All
participants are responsible for their own transportation. Anyone with
questions about the site visit should contact Ms. Dawn Pressler of
Snohomish PUD at (425) 783-1709 on or before June 6, 2013.
Meeting Objectives
At the scoping meetings, staff will: (1) Initiate scoping of the
issues; (2) review and discuss existing conditions and resource
management objectives; (3) review and discuss existing information and
identify preliminary information and study needs; (4) review and
discuss the process plan and schedule for pre-filing activity that
incorporates the time frames provided for in Part 5 of the Commission's
regulations and, to the extent possible, maximizes coordination of
federal, state, and tribal permitting and certification processes; and
(5) discuss the appropriateness of any federal or state agency or
Indian tribe acting as a cooperating agency for development of an
environmental document.
Meeting participants should come prepared to discuss their issues
and/or concerns. Please review the PAD in preparation for the scoping
meetings. Directions on how to obtain a copy of the PAD and SD1 are
included in item n. of this document.
Meeting Procedures
The meetings will be recorded by a stenographer and will be placed
in the public records of the project.
Dated: May 20, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-12506 Filed 5-24-13; 8:45 am]
BILLING CODE 6717-01-P