Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles, 31614-31615 [2013-12422]
Download as PDF
31614
Federal Register / Vol. 78, No. 101 / Friday, May 24, 2013 / Notices
The following MCC compacts are closed and, therefore, do not have any quarterly disbursements: Benin, Cape Verde I, Honduras, Madagascar, Nicaragua and Vanuatu.
[FR Doc. 2013–12371 Filed 5–23–13; 8:45 am]
BILLING CODE 9211–03–P
NEIGHBORHOOD REINVESTMENT
CORPORATION
Corporate Administration Committee
Board of Directors Meeting; Sunshine
Act
& DATE: 11:00 a.m., Thursday, May
24, 2012,
PLACE: 999 North Capitol St. NE., Suite
800, Boardroom, Washington, DC 20002.
STATUS: Open.
CONTACT PERSON FOR MORE INFORMATION:
Erica Hall, Assistant Corporate
Secretary, (202) 220–2376;
ehall@nw.org.
AGENDA:
I. Call To Order
II. Executive Session
III. Board Elections & Appointments
IV. Corporate Administration
Committee Charter
V. DC Office Move Debrief
VI. Human Resources Updates
VII. Benefits Activities
VIII. Adjournment
TIME
Erica Hall,
Assistant Corporate Secretary.
[FR Doc. 2013–12540 Filed 5–22–13; 11:15 am]
BILLING CODE 7570–02–P
NUCLEAR REGULATORY
COMMISSION
*The schedule for Commission
meetings is subject to change on short
notice. To verify the status of meetings,
call (recording)—301–415–1292.
Contact person for more information:
Rochelle Bavol, 301–415–1651.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
*
*
*
*
*
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.
braille, large print), please notify
Kimberly Meyer, NRC Disability
Program Manager, at 301–287–0727, or
by email at kimberly.meyerchambers@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
*
*
*
*
*
This notice is distributed
electronically to subscribers. If you no
longer wish to receive it, or would like
to be added to the distribution, please
contact the Office of the Secretary,
Washington, DC 20555 (301–415–1969),
or send an email to
darlene.wright@nrc.gov.
Dated: May 21, 2013.
Rochelle C. Bavol,
Policy Coordinator, Office of the Secretary.
[NRC–2013–0001]
[FR Doc. 2013–12571 Filed 5–22–13; 4:15 pm]
Sunshine Act Meeting
BILLING CODE 7590–01–P
AGENCY HOLDING THE MEETINGS: Nuclear
Regulatory Commission.
DATE: Week of May 27, 2013.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
mstockstill on DSK4VPTVN1PROD with NOTICES
Week of May 27, 2013
Tuesday, May 28, 2013
1:00 p.m. Discussion of Management
and Personnel Issues (Closed—Ex. 2 and
6).
*
*
*
*
*
NUCLEAR REGULATORY
COMMISSION
[NRC–2012–0247]
Implementation of Regulatory Guide
1.221 on Design-Basis Hurricane and
Hurricane Missiles
Nuclear Regulatory
Commission.
ACTION: Interim staff guidance; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) staff is issuing its
SUMMARY:
• ADAMS
Accession No.
ML13015A688 ....
ML13015A693 ....
VerDate Mar<15>2010
Final Interim Staff Guidance (ISG) DC/
COL–ISG–024. The purpose of this ISG
is to provide the staff guidance
regarding the application of Regulatory
Guide (RG) 1.221, ‘‘Design-Basis
Hurricane and Hurricane Missiles for
Nuclear Power Plants,’’ in support of
NRC reviews of early site permit (ESP),
standard design certification (DC), and
combined license (COL) applications
being performed under the March 2007
version of NUREG–0800, ‘‘Standard
Review Plan for the Review of Safety
Analysis Reports for Nuclear Power
Plants: LWR Edition.’’ This ISG applies
to reviews of ESP, DC and COL
applications where the resolution of the
applicant’s conformance with RG 1.221
has not already been achieved as of the
effective date of this guidance.
The effective date of this COL–
ISG is June 24, 2013.
DATES:
Please refer to Docket ID
NRC–2012–0247 when contacting the
NRC about the availability of
information regarding this document.
You may access information related to
this document, which the NRC
possesses and is publicly available,
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2012–0247. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–492–3668;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual(s) listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publicly
available documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
Final ISG is under ADAMS Accession
No. ML13015A693.
ADDRESSES:
Document title
Interim Staff Guidance-024 on Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles
(Package).
Interim Staff Guidance-024 on Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles.
21:14 May 23, 2013
Jkt 229001
PO 00000
Frm 00100
Fmt 4703
Sfmt 4703
E:\FR\FM\24MYN1.SGM
24MYN1
Federal Register / Vol. 78, No. 101 / Friday, May 24, 2013 / Notices
31615
• ADAMS
Accession No.
Document title
ML13015A696 ....
Comment Response Document—Interim Staff Guidance-024 on Implementation of Regulatory Guide 1.221 on Design-Basis
Hurricane and Hurricane Missiles.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, MD 20852.
FOR FURTHER INFORMATION CONTACT: Mr.
Joseph Colaccino, Office of New
Reactors, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–7102 or by
email at joseph .colaccino@nrc.gov
SUPPLEMENTARY INFORMATION: The staff
issues DC/COL–ISGs to facilitate staff
activities associated with its review of
ESP, DC, and COL applications. This
ISG supplements the guidance
contained in RG 1.206, Revision 0,
‘‘Combined License Applications for
Nuclear Power Plants, (LWR Edition)’’
(ML070630003) In addition, this ISG
supplements the guidance provided for
staff review of ESP, DC, and COL
applications contained in NUREG–0800,
Standard Review Plan (SRP), dated
March 2007 (ML070630003). On
October 22, 2012 (77 FR 64564), the staff
issued the proposed DC/COL–ISG–024
‘‘Interim Staff Guidance Implementation
of Regulatory Guide 1.221 on DesignBasis Hurricane and Hurricane
Missiles,’’ ADAMS Accession No.
ML12132A508. The staff received
questions and editorial comments from
three commenters which were
considered in the development of the
final ISG–024. The questions,
comments, and staff answers and
resolutions of those questions and
comments are contained in ‘‘ISG–024
Comment Resolution’’ which can be
found in ADAMS under Accession No.
ML13015A696.
The NRC posts all final ISGs on the
NRC’s public Web page at https://
www.nrc.gov/reading-rm/doccollections/isg/, which is where the
public may easily obtain access to ISG
DC/COL–ISG–024.
mstockstill on DSK4VPTVN1PROD with NOTICES
Backfitting and Issue Finality
Issuance of this final ISG does not
constitute backfitting as defined in
Section 50.109 of Title 10 of the Code
of Federal Regulations (10 CFR) (the
Backfit Rule), and is not otherwise
inconsistent with the issue finality
provisions in 10 CFR Part 52, with
respect to current and future applicants
other than COL applicants referencing
one of the four current final design
certification rules. The NRC staff’s
VerDate Mar<15>2010
21:14 May 23, 2013
Jkt 229001
position is based upon the following
considerations:
• The ISG positions do not constitute
backfitting, inasmuch as the ISG is
internal guidance directed at the NRC
staff with respect to their regulatory
responsibilities.
• Backfitting and issue finality do not
protect these current or future
applicants.
Issuance of this final ISG may be
viewed as constituting backfitting as
defined in 10 CFR 50.109 (the Backfit
Rule) and may be considered to be
inconsistent with the issue finality
provisions in 10 CFR Part 52, with
respect to current and future COL
applicants referencing the ABWR design
certification rule (10 CFR Part 52,
Appendix A), or the AP1000 design
certification rule (10 CFR Part 52,
Appendix D). Backfitting and issue
finality concerns are limited to the ISG
discussion of consideration of hurricane
winds and hurricane missiles. The NRC
staff has determined that the guidance
in the ISG with respect to consideration
of hurricane wind and hurricane
missiles, when imposed on COL
applicants referencing these two design
certification rules, would be necessary
to provide adequate protection to public
health and safety with respect to
hurricane winds and missiles. In
addition, the imposition would correct
an omission where two approved design
certifications do not have site
parameters for hurricane winds and
hurricane missiles, which are needed to
provide compliance with General
Design Criterion (GDC) 2 and GDC 4 in
10 CFR Part 50, Appendix A. If a
nuclear power plant using these
certified designs is located at a site
where the hurricane loads and/or the
hurricane-generated missile spectra are
not bounded by tornado loads and
tornado missile spectra, then safetyrelated structures required to withstand
hurricane loads and hurricane-generated
missiles may not be adequate and
therefore would be in non-compliance
with GDC 2 and GDC 4, and would not
provide adequate protection to public
health and safety against hurricanes of
credible intensity that might impact the
site. Therefore, any future action to
impose this ISG on current and future
COL applicants referencing the ABWR
design certification rule (10 CFR Part 52,
Appendix A), or the AP1000 design
certification rule (10 CFR Part 52,
PO 00000
Frm 00101
Fmt 4703
Sfmt 4703
Appendix D) would meet the Backfit
Rule and would be permitted under the
issue finality provisions in 10 CFR
52.63(a).
Congressional Review Act
This interim staff guidance is a rule as
defined in the Congressional Review
Act (5 U.S.C. 801–808). However, OMB
has not found it to be a major rule as
designated in the Congressional Review
Act.
SUPPLEMENTARY INFORMATION: The
agency posts its issued staff guidance in
the agency external Web page (https://
www.nrc.gov/reading-rm/doccollections/isg/).
Dated at Rockville, Maryland, this 14th day
of May 2013.
For the Nuclear Regulatory Commission.
Joseph Colaccino,
Chief, Policy Branch, Division of Advanced
Reactors and Rulemaking, Office of New
Reactors.
[FR Doc. 2013–12422 Filed 5–23–13; 8:45 am]
BILLING CODE 7590–01–P
SECURITIES AND EXCHANGE
COMMISSION
Sunshine Act Meeting
Notice is hereby given, pursuant to
the provisions of the Government in the
Sunshine Act, Public Law 94–409, that
the Securities and Exchange
Commission will hold a Closed Meeting
on Thursday, May 30, 2013 at 2:00 p.m.
Commissioners, Counsel to the
Commissioners, the Secretary to the
Commission, and recording secretaries
will attend the Closed Meeting. Certain
staff members who have an interest in
the matters also may be present.
The General Counsel of the
Commission, or her designee, has
certified that, in her opinion, one or
more of the exemptions set forth in 5
U.S.C. 552b(c)(3), (5), (7), 9(B) and (10)
and 17 CFR 200.402(a)(3), (5), (7), 9(ii)
and (10), permit consideration of the
scheduled matters at the Closed
Meeting.
Commissioner Paredes, as duty
officer, voted to consider the items
listed for the Closed Meeting in a closed
session.
The subject matter of the Closed
Meeting will be:
Institution and settlement of
injunctive actions;
E:\FR\FM\24MYN1.SGM
24MYN1
Agencies
[Federal Register Volume 78, Number 101 (Friday, May 24, 2013)]
[Notices]
[Pages 31614-31615]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-12422]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2012-0247]
Implementation of Regulatory Guide 1.221 on Design-Basis
Hurricane and Hurricane Missiles
AGENCY: Nuclear Regulatory Commission.
ACTION: Interim staff guidance; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff is issuing
its Final Interim Staff Guidance (ISG) DC/COL-ISG-024. The purpose of
this ISG is to provide the staff guidance regarding the application of
Regulatory Guide (RG) 1.221, ``Design-Basis Hurricane and Hurricane
Missiles for Nuclear Power Plants,'' in support of NRC reviews of early
site permit (ESP), standard design certification (DC), and combined
license (COL) applications being performed under the March 2007 version
of NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis
Reports for Nuclear Power Plants: LWR Edition.'' This ISG applies to
reviews of ESP, DC and COL applications where the resolution of the
applicant's conformance with RG 1.221 has not already been achieved as
of the effective date of this guidance.
DATES: The effective date of this COL-ISG is June 24, 2013.
ADDRESSES: Please refer to Docket ID NRC-2012-0247 when contacting the
NRC about the availability of information regarding this document. You
may access information related to this document, which the NRC
possesses and is publicly available, using any of the following
methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2012-0247. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-492-
3668; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section
of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly available documents online in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. The Final ISG is under ADAMS
Accession No. ML13015A693.
------------------------------------------------------------------------
ADAMS Accession No. Document title
------------------------------------------------------------------------
ML13015A688......................... Interim Staff Guidance-024 on
Implementation of Regulatory
Guide 1.221 on Design-Basis
Hurricane and Hurricane Missiles
(Package).
ML13015A693......................... Interim Staff Guidance-024 on
Implementation of Regulatory
Guide 1.221 on Design-Basis
Hurricane and Hurricane Missiles.
[[Page 31615]]
ML13015A696......................... Comment Response Document--Interim
Staff Guidance-024 on
Implementation of Regulatory
Guide 1.221 on Design-Basis
Hurricane and Hurricane Missiles.
------------------------------------------------------------------------
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, MD 20852.
FOR FURTHER INFORMATION CONTACT: Mr. Joseph Colaccino, Office of New
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-7102 or by email at joseph .colaccino@nrc.gov
SUPPLEMENTARY INFORMATION: The staff issues DC/COL-ISGs to facilitate
staff activities associated with its review of ESP, DC, and COL
applications. This ISG supplements the guidance contained in RG 1.206,
Revision 0, ``Combined License Applications for Nuclear Power Plants,
(LWR Edition)'' (ML070630003) In addition, this ISG supplements the
guidance provided for staff review of ESP, DC, and COL applications
contained in NUREG-0800, Standard Review Plan (SRP), dated March 2007
(ML070630003). On October 22, 2012 (77 FR 64564), the staff issued the
proposed DC/COL-ISG-024 ``Interim Staff Guidance Implementation of
Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane
Missiles,'' ADAMS Accession No. ML12132A508. The staff received
questions and editorial comments from three commenters which were
considered in the development of the final ISG-024. The questions,
comments, and staff answers and resolutions of those questions and
comments are contained in ``ISG-024 Comment Resolution'' which can be
found in ADAMS under Accession No. ML13015A696.
The NRC posts all final ISGs on the NRC's public Web page at https://www.nrc.gov/reading-rm/doc-collections/isg/, which is where the public
may easily obtain access to ISG DC/COL-ISG-024.
Backfitting and Issue Finality
Issuance of this final ISG does not constitute backfitting as
defined in Section 50.109 of Title 10 of the Code of Federal
Regulations (10 CFR) (the Backfit Rule), and is not otherwise
inconsistent with the issue finality provisions in 10 CFR Part 52, with
respect to current and future applicants other than COL applicants
referencing one of the four current final design certification rules.
The NRC staff's position is based upon the following considerations:
The ISG positions do not constitute backfitting, inasmuch
as the ISG is internal guidance directed at the NRC staff with respect
to their regulatory responsibilities.
Backfitting and issue finality do not protect these
current or future applicants.
Issuance of this final ISG may be viewed as constituting
backfitting as defined in 10 CFR 50.109 (the Backfit Rule) and may be
considered to be inconsistent with the issue finality provisions in 10
CFR Part 52, with respect to current and future COL applicants
referencing the ABWR design certification rule (10 CFR Part 52,
Appendix A), or the AP1000 design certification rule (10 CFR Part 52,
Appendix D). Backfitting and issue finality concerns are limited to the
ISG discussion of consideration of hurricane winds and hurricane
missiles. The NRC staff has determined that the guidance in the ISG
with respect to consideration of hurricane wind and hurricane missiles,
when imposed on COL applicants referencing these two design
certification rules, would be necessary to provide adequate protection
to public health and safety with respect to hurricane winds and
missiles. In addition, the imposition would correct an omission where
two approved design certifications do not have site parameters for
hurricane winds and hurricane missiles, which are needed to provide
compliance with General Design Criterion (GDC) 2 and GDC 4 in 10 CFR
Part 50, Appendix A. If a nuclear power plant using these certified
designs is located at a site where the hurricane loads and/or the
hurricane-generated missile spectra are not bounded by tornado loads
and tornado missile spectra, then safety-related structures required to
withstand hurricane loads and hurricane-generated missiles may not be
adequate and therefore would be in non-compliance with GDC 2 and GDC 4,
and would not provide adequate protection to public health and safety
against hurricanes of credible intensity that might impact the site.
Therefore, any future action to impose this ISG on current and future
COL applicants referencing the ABWR design certification rule (10 CFR
Part 52, Appendix A), or the AP1000 design certification rule (10 CFR
Part 52, Appendix D) would meet the Backfit Rule and would be permitted
under the issue finality provisions in 10 CFR 52.63(a).
Congressional Review Act
This interim staff guidance is a rule as defined in the
Congressional Review Act (5 U.S.C. 801-808). However, OMB has not found
it to be a major rule as designated in the Congressional Review Act.
SUPPLEMENTARY INFORMATION: The agency posts its issued staff guidance
in the agency external Web page (https://www.nrc.gov/reading-rm/doc-collections/isg/).
Dated at Rockville, Maryland, this 14th day of May 2013.
For the Nuclear Regulatory Commission.
Joseph Colaccino,
Chief, Policy Branch, Division of Advanced Reactors and Rulemaking,
Office of New Reactors.
[FR Doc. 2013-12422 Filed 5-23-13; 8:45 am]
BILLING CODE 7590-01-P