Winchendon Hydroelectric LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 29361-29362 [2013-11881]

Download as PDF 29361 Federal Register / Vol. 78, No. 97 / Monday, May 20, 2013 / Notices FERC–539—GAS PIPELINE CERTIFICATES: IMPORT/EXPORT RELATED Number of respondents Number of responses per respondent Total number of responses Average burden hours per response Estimated total annual burden (A) (B) (A)×(B)=(C) (D) (C)×(D) 7 2 14 12 168 The total estimated annual cost burden to respondents is $11,760[168 hours * $70/hour 5 = $11,760] Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: May 13, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–11885 Filed 5–17–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 8012–007] mstockstill on DSK4VPTVN1PROD with NOTICES Winchendon Hydroelectric LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Types of Application: Non-capacity amendment of exemption. b. Project No.: 8012–007. c. Date Filed: April 5, 2013. d. Applicant: Winchendon Hydroelectric LLC. e. Name of Project: Hunts Pond Dam Hydroelectric Project. f. Location: Millers River in Worcester County, Massachusetts. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Stephen J. Fisk, Winchendon Hydroelectric, 5 Average salary (per hour) plus benefits per fulltime equivalent employee. VerDate Mar<15>2010 19:09 May 17, 2013 Jkt 229001 LLC, 57 Suffolk Street, Suite 200, Holyoke, MA 01040, (413) 536–6062. i. FERC Contact: Alyssa Dorval, (212) 273–5955, Alyssa.Dorval@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: June 11, 2013. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P–8012–007) on any comments or motions filed. k. Description of Application: Winchendon Hydroelectric LLC is requesting a non-capacity exemption amendment to replace two cross-flow turbines with a total generator nameplate capacity of 120 kW to a single double regulated Kaplan unit with a generator capacity of 100 kW. The historical data shows the annual production to be approximately 305,000 kWh. The new Kaplan turbine is estimated to produce an additional 201,000 kWh per year more than the existing installed units resulting in an estimated new annual production value of 506,000 kWh. With the turbine replacement, the hydraulic capacity value will be reduced from the existing units at approximately 172 cubic feet per second (cfs) to the new unit at approximately 110 cfs. The exemptee also plans to address repairs to spalled concrete, stoplog and needle beam maintenance and replacement at the dam as required by the Commission’s Division of Dam Safety. To complete the turbine replacement and required maintenance, the exemptee will need to temporarily draw down the project from a normal operating elevation of 954.6 feet National Geodetic Vertical Datum PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 (NGVD) to below the crest of the dam, with a lower limit of 944.48 feet NGVD, for a period lasting from June 2013 through September 2013. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field (P–8012) to access the document. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone E:\FR\FM\20MYN1.SGM 20MYN1 29362 Federal Register / Vol. 78, No. 97 / Monday, May 20, 2013 / Notices number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment application. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: May 13, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–11881 Filed 5–17–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK4VPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–3984–000. Applicants: City of Riverside, California. Description: Compliance Report to be effective N/A. Filed Date: 5/10/13. Accession Number: 20130510–5145. Comments Due: 5 p.m. ET 5/31/13. Docket Numbers: ER12–2068–003; ER10–2460–005; ER10–2461–005; ER12–682–006; ER11–2201–009; ER13– 17–003; ER12–1311–005; ER10–2466– 006; ER11–4029–005; ER10–2463–005. Applicants: Blue Sky East, LLC, Canandaigua Power Partners I, LLC, Canandaigua Power Partners II, LLC, Erie Wind, LLC, Evergreen Wind Power, LLC, Evergreen Wind Power III, LLC, Niagara Wind Power, LLC, Stetson Holdings, LLC, Stetson Wind II, LLC, Vermont Wind, LLC. VerDate Mar<15>2010 19:09 May 17, 2013 Jkt 229001 Description: Supplement to April 29, 2013 Notice of Change in Status of Blue Sky East, LLC, et al. Filed Date: 5/9/13. Accession Number: 20130509–5111. Comments Due: 5 p.m. ET 5/30/13. Docket Numbers: ER13–1447–000. Applicants: Public Service Company of New Mexico. Description: OATT Order 1000 Compliance Filing to be effective 10/1/2013. Filed Date: 5/10/13. Accession Number: 20130510–5026. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1448–000. Applicants: NorthWestern Corporation. Description: OATT Order No. 1000 Interregional Compliance Filing—MT to be effective 10/1/2013. Filed Date: 5/10/13. Accession Number: 20130510–5063. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1450–000. Applicants: Arizona Public Service Company. Description: OATT Order No. 1000 Interregional Compliance Filing to be effective 12/31/9998. Filed Date: 5/10/13. Accession Number: 20130510–5089. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1457–000. Applicants: Deseret Generation & Transmission Co-operative. Description: OATT Order No. 1000 Interregional Compliance Filing to be effective 10/1/2013. Filed Date: 5/10/13. Accession Number: 20130510–5101. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1461–000. Applicants: Tucson Electric Power Company. Description: OATT Order No. 1000 Interregional Compliance Filing to be effective 12/31/9998. Filed Date: 5/10/13. Accession Number: 20130510–5125. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1462–000. Applicants: UNS Electric, Inc. Description: OATT Order No. 1000 Interregional Compliance Filing to be effective 12/31/9998. Filed Date: 5/10/13. Accession Number: 20130510–5127. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1463–000. Applicants: Portland General Electric Company. Description: OATT Order No. 1000 Interregional Compliance Filing to be effective 10/1/2013. Filed Date: 5/10/13. Accession Number: 20130510–5128. PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1465–000. Applicants: El Paso Electric Company. Description: OATT Order No. 1000 Compliance Filing—Interregional to be effective 12/31/9998. Filed Date: 5/10/13. Accession Number: 20130510–5135. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1466–000. Applicants: NV Energy, Inc. Description: OATT Order No. 1000 Interregional Compliance Filing to be effective 12/31/9998. Filed Date: 5/10/13. Accession Number: 20130510–5141. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1467–000. Applicants: Idaho Power Company. Description: OATT Order No. 1000 Interregional Compliance Filing to be effective 10/1/2013. Filed Date: 5/10/13. Accession Number: 20130510–5143. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1468–000. Applicants: Massachusetts Electric Company. Description: Interconnection Agreement Between MECo and IPS Inc. for Granby Landfill to be effective 7/10/2013. Filed Date: 5/10/13. Accession Number: 20130510–5144. Comments Due: 5 p.m. ET 5/31/13. Docket Numbers: ER13–1469–000. Applicants: Public Service Company of Colorado. Description: 2013–05–10–OATT Order No. 1000 Compliance Filing to be effective 12/31/9998. Filed Date: 5/10/13. Accession Number: 20130510–5155. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1470–000. Applicants: California Independent System Operator Corporation. Description: 2013–05–10 Order 1000 Interregional Compliance to be effective 10/1/2013. Filed Date: 5/10/13. Accession Number: 20130510–5158. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1471–000. Applicants: Cheyenne Light, Fuel and Power Company. Description: Order No. 1000 Compliance Filing to be effective 10/1/2013. Filed Date: 5/10/13. Accession Number: 20130510–5159. Comments Due: 5 p.m. ET 6/24/13. Docket Numbers: ER13–1472–000. Applicants: Black Hills Power, Inc. Description: Order No. 1000 Interregional Compliance Filing to be effective 10/1/2013. E:\FR\FM\20MYN1.SGM 20MYN1

Agencies

[Federal Register Volume 78, Number 97 (Monday, May 20, 2013)]
[Notices]
[Pages 29361-29362]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-11881]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 8012-007]


Winchendon Hydroelectric LLC; Notice of Application Accepted for 
Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:

a. Types of Application: Non-capacity amendment of exemption.
b. Project No.: 8012-007.
c. Date Filed: April 5, 2013.
d. Applicant: Winchendon Hydroelectric LLC.
e. Name of Project: Hunts Pond Dam Hydroelectric Project.
f. Location: Millers River in Worcester County, Massachusetts.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Stephen J. Fisk, Winchendon Hydroelectric, 
LLC, 57 Suffolk Street, Suite 200, Holyoke, MA 01040, (413) 536-6062.
i. FERC Contact: Alyssa Dorval, (212) 273-5955, Alyssa.Dorval@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protests: 
June 11, 2013.

    All documents may be filed electronically via the Internet. See, 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be 
filed electronically, documents may be paper-filed. To paper-file, an 
original and seven copies should be mailed to: Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426. Commenters can submit brief comments up to 6,000 characters, 
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and 
contact information at the end of your comments. Please include the 
project number (P-8012-007) on any comments or motions filed.
    k. Description of Application: Winchendon Hydroelectric LLC is 
requesting a non-capacity exemption amendment to replace two cross-flow 
turbines with a total generator nameplate capacity of 120 kW to a 
single double regulated Kaplan unit with a generator capacity of 100 
kW. The historical data shows the annual production to be approximately 
305,000 kWh. The new Kaplan turbine is estimated to produce an 
additional 201,000 kWh per year more than the existing installed units 
resulting in an estimated new annual production value of 506,000 kWh. 
With the turbine replacement, the hydraulic capacity value will be 
reduced from the existing units at approximately 172 cubic feet per 
second (cfs) to the new unit at approximately 110 cfs. The exemptee 
also plans to address repairs to spalled concrete, stoplog and needle 
beam maintenance and replacement at the dam as required by the 
Commission's Division of Dam Safety. To complete the turbine 
replacement and required maintenance, the exemptee will need to 
temporarily draw down the project from a normal operating elevation of 
954.6 feet National Geodetic Vertical Datum (NGVD) to below the crest 
of the dam, with a lower limit of 944.48 feet NGVD, for a period 
lasting from June 2013 through September 2013.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field (P-8012) to access the document. You 
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the 
address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone

[[Page 29362]]

number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the amendment application. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: May 13, 2013.
Kimberly D. Bose,
Secretary.