Winchendon Hydroelectric LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 29361-29362 [2013-11881]
Download as PDF
29361
Federal Register / Vol. 78, No. 97 / Monday, May 20, 2013 / Notices
FERC–539—GAS PIPELINE CERTIFICATES: IMPORT/EXPORT RELATED
Number of
respondents
Number of
responses per respondent
Total number of responses
Average burden hours per
response
Estimated total annual
burden
(A)
(B)
(A)×(B)=(C)
(D)
(C)×(D)
7
2
14
12
168
The total estimated annual cost
burden to respondents is $11,760[168
hours * $70/hour 5 = $11,760]
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: May 13, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11885 Filed 5–17–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 8012–007]
mstockstill on DSK4VPTVN1PROD with NOTICES
Winchendon Hydroelectric LLC; Notice
of Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Types of Application: Non-capacity
amendment of exemption.
b. Project No.: 8012–007.
c. Date Filed: April 5, 2013.
d. Applicant: Winchendon
Hydroelectric LLC.
e. Name of Project: Hunts Pond Dam
Hydroelectric Project.
f. Location: Millers River in Worcester
County, Massachusetts.
g. Filed Pursuant to: Federal Power Act,
16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Stephen J.
Fisk, Winchendon Hydroelectric,
5 Average salary (per hour) plus benefits per fulltime equivalent employee.
VerDate Mar<15>2010
19:09 May 17, 2013
Jkt 229001
LLC, 57 Suffolk Street, Suite 200,
Holyoke, MA 01040, (413) 536–6062.
i. FERC Contact: Alyssa Dorval, (212)
273–5955, Alyssa.Dorval@ferc.gov.
j. Deadline for filing comments, motions
to intervene, and protests: June 11,
2013.
All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–8012–007) on any
comments or motions filed.
k. Description of Application:
Winchendon Hydroelectric LLC is
requesting a non-capacity exemption
amendment to replace two cross-flow
turbines with a total generator
nameplate capacity of 120 kW to a
single double regulated Kaplan unit
with a generator capacity of 100 kW.
The historical data shows the annual
production to be approximately 305,000
kWh. The new Kaplan turbine is
estimated to produce an additional
201,000 kWh per year more than the
existing installed units resulting in an
estimated new annual production value
of 506,000 kWh. With the turbine
replacement, the hydraulic capacity
value will be reduced from the existing
units at approximately 172 cubic feet
per second (cfs) to the new unit at
approximately 110 cfs. The exemptee
also plans to address repairs to spalled
concrete, stoplog and needle beam
maintenance and replacement at the
dam as required by the Commission’s
Division of Dam Safety. To complete the
turbine replacement and required
maintenance, the exemptee will need to
temporarily draw down the project from
a normal operating elevation of 954.6
feet National Geodetic Vertical Datum
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
(NGVD) to below the crest of the dam,
with a lower limit of 944.48 feet NGVD,
for a period lasting from June 2013
through September 2013.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–8012) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
E:\FR\FM\20MYN1.SGM
20MYN1
29362
Federal Register / Vol. 78, No. 97 / Monday, May 20, 2013 / Notices
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 13, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11881 Filed 5–17–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–3984–000.
Applicants: City of Riverside,
California.
Description: Compliance Report to be
effective N/A.
Filed Date: 5/10/13.
Accession Number: 20130510–5145.
Comments Due: 5 p.m. ET 5/31/13.
Docket Numbers: ER12–2068–003;
ER10–2460–005; ER10–2461–005;
ER12–682–006; ER11–2201–009; ER13–
17–003; ER12–1311–005; ER10–2466–
006; ER11–4029–005; ER10–2463–005.
Applicants: Blue Sky East, LLC,
Canandaigua Power Partners I, LLC,
Canandaigua Power Partners II, LLC,
Erie Wind, LLC, Evergreen Wind Power,
LLC, Evergreen Wind Power III, LLC,
Niagara Wind Power, LLC, Stetson
Holdings, LLC, Stetson Wind II, LLC,
Vermont Wind, LLC.
VerDate Mar<15>2010
19:09 May 17, 2013
Jkt 229001
Description: Supplement to April 29,
2013 Notice of Change in Status of Blue
Sky East, LLC, et al.
Filed Date: 5/9/13.
Accession Number: 20130509–5111.
Comments Due: 5 p.m. ET 5/30/13.
Docket Numbers: ER13–1447–000.
Applicants: Public Service Company
of New Mexico.
Description: OATT Order 1000
Compliance Filing to be effective
10/1/2013.
Filed Date: 5/10/13.
Accession Number: 20130510–5026.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1448–000.
Applicants: NorthWestern
Corporation.
Description: OATT Order No. 1000
Interregional Compliance Filing—MT to
be effective 10/1/2013.
Filed Date: 5/10/13.
Accession Number: 20130510–5063.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1450–000.
Applicants: Arizona Public Service
Company.
Description: OATT Order No. 1000
Interregional Compliance Filing to be
effective 12/31/9998.
Filed Date: 5/10/13.
Accession Number: 20130510–5089.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1457–000.
Applicants: Deseret Generation &
Transmission Co-operative.
Description: OATT Order No. 1000
Interregional Compliance Filing to be
effective 10/1/2013.
Filed Date: 5/10/13.
Accession Number: 20130510–5101.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1461–000.
Applicants: Tucson Electric Power
Company.
Description: OATT Order No. 1000
Interregional Compliance Filing to be
effective 12/31/9998.
Filed Date: 5/10/13.
Accession Number: 20130510–5125.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1462–000.
Applicants: UNS Electric, Inc.
Description: OATT Order No. 1000
Interregional Compliance Filing to be
effective 12/31/9998.
Filed Date: 5/10/13.
Accession Number: 20130510–5127.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1463–000.
Applicants: Portland General Electric
Company.
Description: OATT Order No. 1000
Interregional Compliance Filing to be
effective 10/1/2013.
Filed Date: 5/10/13.
Accession Number: 20130510–5128.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1465–000.
Applicants: El Paso Electric Company.
Description: OATT Order No. 1000
Compliance Filing—Interregional to be
effective 12/31/9998.
Filed Date: 5/10/13.
Accession Number: 20130510–5135.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1466–000.
Applicants: NV Energy, Inc.
Description: OATT Order No. 1000
Interregional Compliance Filing to be
effective 12/31/9998.
Filed Date: 5/10/13.
Accession Number: 20130510–5141.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1467–000.
Applicants: Idaho Power Company.
Description: OATT Order No. 1000
Interregional Compliance Filing to be
effective 10/1/2013.
Filed Date: 5/10/13.
Accession Number: 20130510–5143.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1468–000.
Applicants: Massachusetts Electric
Company.
Description: Interconnection
Agreement Between MECo and IPS Inc.
for Granby Landfill to be effective
7/10/2013.
Filed Date: 5/10/13.
Accession Number: 20130510–5144.
Comments Due: 5 p.m. ET 5/31/13.
Docket Numbers: ER13–1469–000.
Applicants: Public Service Company
of Colorado.
Description: 2013–05–10–OATT
Order No. 1000 Compliance Filing to be
effective 12/31/9998.
Filed Date: 5/10/13.
Accession Number: 20130510–5155.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1470–000.
Applicants: California Independent
System Operator Corporation.
Description: 2013–05–10 Order 1000
Interregional Compliance to be effective
10/1/2013.
Filed Date: 5/10/13.
Accession Number: 20130510–5158.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1471–000.
Applicants: Cheyenne Light, Fuel and
Power Company.
Description: Order No. 1000
Compliance Filing to be effective
10/1/2013.
Filed Date: 5/10/13.
Accession Number: 20130510–5159.
Comments Due: 5 p.m. ET 6/24/13.
Docket Numbers: ER13–1472–000.
Applicants: Black Hills Power, Inc.
Description: Order No. 1000
Interregional Compliance Filing to be
effective 10/1/2013.
E:\FR\FM\20MYN1.SGM
20MYN1
Agencies
[Federal Register Volume 78, Number 97 (Monday, May 20, 2013)]
[Notices]
[Pages 29361-29362]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-11881]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 8012-007]
Winchendon Hydroelectric LLC; Notice of Application Accepted for
Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Types of Application: Non-capacity amendment of exemption.
b. Project No.: 8012-007.
c. Date Filed: April 5, 2013.
d. Applicant: Winchendon Hydroelectric LLC.
e. Name of Project: Hunts Pond Dam Hydroelectric Project.
f. Location: Millers River in Worcester County, Massachusetts.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Stephen J. Fisk, Winchendon Hydroelectric,
LLC, 57 Suffolk Street, Suite 200, Holyoke, MA 01040, (413) 536-6062.
i. FERC Contact: Alyssa Dorval, (212) 273-5955, Alyssa.Dorval@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protests:
June 11, 2013.
All documents may be filed electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments. Please include the
project number (P-8012-007) on any comments or motions filed.
k. Description of Application: Winchendon Hydroelectric LLC is
requesting a non-capacity exemption amendment to replace two cross-flow
turbines with a total generator nameplate capacity of 120 kW to a
single double regulated Kaplan unit with a generator capacity of 100
kW. The historical data shows the annual production to be approximately
305,000 kWh. The new Kaplan turbine is estimated to produce an
additional 201,000 kWh per year more than the existing installed units
resulting in an estimated new annual production value of 506,000 kWh.
With the turbine replacement, the hydraulic capacity value will be
reduced from the existing units at approximately 172 cubic feet per
second (cfs) to the new unit at approximately 110 cfs. The exemptee
also plans to address repairs to spalled concrete, stoplog and needle
beam maintenance and replacement at the dam as required by the
Commission's Division of Dam Safety. To complete the turbine
replacement and required maintenance, the exemptee will need to
temporarily draw down the project from a normal operating elevation of
954.6 feet National Geodetic Vertical Datum (NGVD) to below the crest
of the dam, with a lower limit of 944.48 feet NGVD, for a period
lasting from June 2013 through September 2013.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (P-8012) to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the
address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
[[Page 29362]]
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the amendment application.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 13, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-11881 Filed 5-17-13; 8:45 am]
BILLING CODE 6717-01-P