ECOsponsible, Incorporated; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 28839 [2013-11668]

Download as PDF tkelley on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 78, No. 95 / Thursday, May 16, 2013 / Notices capacity of 825 acre-feet at an elevation of 888.6 feet mean sea level (msl); (3) an existing 22-foot-long by 50-foot-wide by 30-foot-high powerhouse with three turbine-generator units having a combined capacity of 1,500 kilowatts and three identical 20-foot-wide, 10foot-high, 5-foot-long direct intakes; (4) an existing 50-foot-long, 50-foot-wide canal to direct flows to the intakes; (5) an existing 50-foot-wide, 180-foot-long concrete lined tailrace; (6) an existing 150-foot-long, 33-kilovolt transmission line; and (7) appurtenant facilities. The proposed project would have an annual generation of 7,000 megawatt-hours. Applicant Contact: Mark Boumansour, Hamilton Street Hydro, LLC, 1401 Walnut Street, Suite 301, Boulder, CO 80302; phone: (303) 440– 3378. FERC Contact: Monir Chowdhury; phone: (202) 502–6736. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14507–000) in the docket number field to access the document. For assistance, contact FERC Online Support. VerDate Mar<15>2010 18:13 May 15, 2013 Jkt 229001 Dated: May 8, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–11669 Filed 5–15–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14502–000] ECOsponsible, Incorporated; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 25, 2013, ECOsponsible, Incorporated filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of hydropower at the Rochester Gas and Electric Company’s (RG&E) Mount Morris Power Dam located on the Genesee River, near the town of Mount Morris, Livingston County, New York. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) An existing 30-foothigh, 334-foot-long stone and concrete gravity dam; (2) a single, proposed, lowhead, horizontal bulb turbine having a total installed capacity of 1,100 kilowatts; (3) a proposed automatic trash rack cleaner; (4) an existing operation and maintenance building that will be used to house the supervisory control and data acquisition system; (5) a proposed overhead 200foot-long, 2,400-volt transmission line connecting with RG&E’s system; and (6) appurtenant facilities. The proposed project would have an average annual generation of 4,105 megawatt-hours, which would be sold to RG&E. Applicant Contact: Mr. Dennis Ryan, Executive Director, ECOsponsible, Incorporated, 120 Mitchell Road, East Aurora, NY 14052; phone: (716) 203– 1508. FERC Contact: Tim Looney; phone: (202) 502–6096. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 28839 intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14502) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: May 8, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–11668 Filed 5–15–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission’s staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection, L.L.C., ISO New England, Inc., and New York Independent System Operator, Inc.: Inter-Regional Planning Stakeholder Advisory Committee—New York/New England May 13, 2013, 1:00 p.m.–3:00 p.m., Local Time The above-referenced meeting will be held over conference call. E:\FR\FM\16MYN1.SGM 16MYN1

Agencies

[Federal Register Volume 78, Number 95 (Thursday, May 16, 2013)]
[Notices]
[Page 28839]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-11668]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14502-000]


ECOsponsible, Incorporated; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On February 25, 2013, ECOsponsible, Incorporated filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of 
hydropower at the Rochester Gas and Electric Company's (RG&E) Mount 
Morris Power Dam located on the Genesee River, near the town of Mount 
Morris, Livingston County, New York. The sole purpose of a preliminary 
permit, if issued, is to grant the permit holder priority to file a 
license application during the permit term. A preliminary permit does 
not authorize the permit holder to perform any land-disturbing 
activities or otherwise enter upon lands or waters owned by others 
without the owners' express permission.
    The proposed project would consist of the following: (1) An 
existing 30-foot-high, 334-foot-long stone and concrete gravity dam; 
(2) a single, proposed, low-head, horizontal bulb turbine having a 
total installed capacity of 1,100 kilowatts; (3) a proposed automatic 
trash rack cleaner; (4) an existing operation and maintenance building 
that will be used to house the supervisory control and data acquisition 
system; (5) a proposed overhead 200-foot-long, 2,400-volt transmission 
line connecting with RG&E's system; and (6) appurtenant facilities. The 
proposed project would have an average annual generation of 4,105 
megawatt-hours, which would be sold to RG&E.
    Applicant Contact: Mr. Dennis Ryan, Executive Director, 
ECOsponsible, Incorporated, 120 Mitchell Road, East Aurora, NY 14052; 
phone: (716) 203-1508.
    FERC Contact: Tim Looney; phone: (202) 502-6096.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and five copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14502) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: May 8, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-11668 Filed 5-15-13; 8:45 am]