Notice of Commission Staff Attendance, 28839-28840 [2013-11664]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 95 / Thursday, May 16, 2013 / Notices
capacity of 825 acre-feet at an elevation
of 888.6 feet mean sea level (msl); (3) an
existing 22-foot-long by 50-foot-wide by
30-foot-high powerhouse with three
turbine-generator units having a
combined capacity of 1,500 kilowatts
and three identical 20-foot-wide, 10foot-high, 5-foot-long direct intakes; (4)
an existing 50-foot-long, 50-foot-wide
canal to direct flows to the intakes; (5)
an existing 50-foot-wide, 180-foot-long
concrete lined tailrace; (6) an existing
150-foot-long, 33-kilovolt transmission
line; and (7) appurtenant facilities. The
proposed project would have an annual
generation of 7,000 megawatt-hours.
Applicant Contact: Mark
Boumansour, Hamilton Street Hydro,
LLC, 1401 Walnut Street, Suite 301,
Boulder, CO 80302; phone: (303) 440–
3378.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14507–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
VerDate Mar<15>2010
18:13 May 15, 2013
Jkt 229001
Dated: May 8, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11669 Filed 5–15–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14502–000]
ECOsponsible, Incorporated; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 25, 2013, ECOsponsible,
Incorporated filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of
hydropower at the Rochester Gas and
Electric Company’s (RG&E) Mount
Morris Power Dam located on the
Genesee River, near the town of Mount
Morris, Livingston County, New York.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) An existing 30-foothigh, 334-foot-long stone and concrete
gravity dam; (2) a single, proposed, lowhead, horizontal bulb turbine having a
total installed capacity of 1,100
kilowatts; (3) a proposed automatic
trash rack cleaner; (4) an existing
operation and maintenance building
that will be used to house the
supervisory control and data acquisition
system; (5) a proposed overhead 200foot-long, 2,400-volt transmission line
connecting with RG&E’s system; and (6)
appurtenant facilities. The proposed
project would have an average annual
generation of 4,105 megawatt-hours,
which would be sold to RG&E.
Applicant Contact: Mr. Dennis Ryan,
Executive Director, ECOsponsible,
Incorporated, 120 Mitchell Road, East
Aurora, NY 14052; phone: (716) 203–
1508.
FERC Contact: Tim Looney; phone:
(202) 502–6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
28839
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14502) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: May 8, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11668 Filed 5–15–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following joint stakeholder meeting
related to the transmission planning
activities of PJM Interconnection, L.L.C.,
ISO New England, Inc., and New York
Independent System Operator, Inc.:
Inter-Regional Planning Stakeholder
Advisory Committee—New York/New
England
May 13, 2013, 1:00 p.m.–3:00 p.m.,
Local Time
The above-referenced meeting will be
held over conference call.
E:\FR\FM\16MYN1.SGM
16MYN1
tkelley on DSK3SPTVN1PROD with NOTICES
28840
Federal Register / Vol. 78, No. 95 / Thursday, May 16, 2013 / Notices
The above-referenced meeting is open
to stakeholders.
Further information may be found at
www.pjm.com/committees-and-groups/
stakeholder-meetings/stakeholdergroups/ipsac-ny-ne.aspx.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. ER08–1281, New York
Independent System Operator, Inc.
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. EL10–52, Central
Transmission, LLC v. PJM
Interconnection, L.L.C.
Docket No. ER10–253 and EL10–14,
Primary Power, L.L.C.
Docket No. EL12–69, Primary Power
LLC v. PJM Interconnection, L.L.C.
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1178, PJM
Interconnection, L.L.C.
Docket No. ER13–90, Public Service
Electric and Gas Company and PJM
Interconnection, L.L.C.
Docket No. ER13–102, New York
Independent System Operator, Inc.
Docket No. ER13–193, ISO New England
Inc.
Docket No. ER13–195, Indicated PJM
Transmission Owners
Docket No. ER13–196, ISO New England
Inc.
Docket No. ER13–198, PJM
Interconnection, L.L.C
Docket No. ER13–397, PJM
Interconnection, L.L.C.
Docket No. ER13–673, PJM
Interconnection, L.L.C
Docket No. ER13–703, PJM
Interconnection, L.L.C.
Docket No. ER13–887, PJM
Interconnection, L.L.C.
Docket No. ER13–1052, PJM
Interconnection, L.L.C. and the
Midwest Independent Transmission
System Operator, Inc.
Docket No. ER13–1054, PJM
Interconnection, L.L.C. and the
Midwest Independent Transmission
System Operator, Inc.
For more information, contact
Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6604 or jonathan.fernandez@ferc.gov.
Dated: May 10, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11664 Filed 5–15–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
18:13 May 15, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of FERC Staff Attendance at the
Entergy Regional State Committee
Meeting
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of its staff may
attend the meeting noted below. Their
attendance is part of the Commission’s
ongoing outreach efforts.
Entergy Regional State Committee
May 29, 2013 (9:00 a.m.–3:00 p.m.).
This meeting will be held at the
Windsor Court Hotel, 300 Gravier Street,
New Orleans, LA 70130.
The discussions may address matters
at issue in the following proceedings:
Docket No. EL01–88, Louisiana Public
Service Commission v. Entergy
Services, Inc.
Docket No. EL09–50, Louisiana Public
Service Commission v. Entergy
Services, Inc.
Docket No. EL09–61, Louisiana Public
Service Commission v. Entergy
Services, Inc.
Docket No. EL10–55, Louisiana Public
Service Commission v. Entergy
Services, Inc.
Docket No. EL10–65, Louisiana Public
Service Commission v. Entergy
Services, Inc.
Docket No. EL11–63, Louisiana Public
Service Commission v. Entergy
Services, Inc.
Docket No. EL11–65, Louisiana Public
Service Commission v. Entergy
Services, Inc.
Docket No. EL13–41, Occidental
Chemical Company v. Midwest
Independent System Transmission
Operator, Inc.
Docket No. EL13–43, Council of the City
of New Orleans, Mississippi Public
Service Commission, Arkansas
Public Service Commission, Public
Utility Commission of Texas,
Louisiana Public Service
Commission
Docket No. ER05–1065, Entergy
Services, Inc.
Docket No. ER07–682, Entergy Services,
Inc.
Docket No. ER07–956, Entergy Services,
Inc.
Docket No. ER08–1056, Entergy
Services, Inc.
Docket No. ER09–1224, Entergy
Services, Inc.
Docket No. ER10–794, Entergy Services,
Inc.
Docket No. ER10–1350, Entergy
Services, Inc.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Docket No. ER10–2001, Entergy
Arkansas, Inc.
Docket No. ER10–3357, Entergy
Arkansas, Inc.
Docket No. ER11–2161, Entergy Texas,
Inc.
Docket No. ER11–3657, Entergy
Arkansas, Inc.
Docket No. ER12–480, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1428, Entergy
Arkansas, Inc.
Docket No. ER12–1881, Entergy
Arkansas, Inc.
Docket No. ER12–1882, Entergy Gulf
States, Louisiana L.L.C.
Docket No. ER12–1883, Entergy
Louisiana LLC
Docket No. ER12–1884, Entergy
Mississippi, Inc.
Docket No. ER12–1885, Entergy New
Orleans, Inc.
Docket No. ER12–1886, Entergy Texas,
Inc.
Docket Nos. ER12–2681, et al. Entergy
Corp., Midwest Independent
Transmission System Operator, Inc.
and ITC Holdings Corp.
Docket No. ER12–2682, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–2683, Entergy
Services, Inc.
Docket No. ER12–2693, Entergy
Services, Inc.
Docket No. ER13–288, Entergy Services,
Inc.
Docket No. ER13–432, Entergy Services,
Inc.
Docket No. ER13–665, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER13–708, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER13–769, Entergy
Arkansas, Inc. and Entergy
Mississippi, Inc.
Docket No. ER13–770, Entergy
Arkansas, Inc. and Entergy
Louisiana, LLC.
Docket No. ER13–782, ITC Arkansas
LLC, et al.
Docket No. ER13–868, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER13–945, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER13–948, Entergy Services,
Inc.
Docket No. ER13–1184, Entergy Power,
LLC.
Docket No. ER13–1194, Entergy
Services, Inc.
Docket No. ER13–1195, Entergy
Services, Inc.
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 78, Number 95 (Thursday, May 16, 2013)]
[Notices]
[Pages 28839-28840]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-11664]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission's staff may attend the following
joint stakeholder meeting related to the transmission planning
activities of PJM Interconnection, L.L.C., ISO New England, Inc., and
New York Independent System Operator, Inc.:
Inter-Regional Planning Stakeholder Advisory Committee--New York/New
England
May 13, 2013, 1:00 p.m.-3:00 p.m., Local Time
The above-referenced meeting will be held over conference call.
[[Page 28840]]
The above-referenced meeting is open to stakeholders.
Further information may be found at www.pjm.com/committees-and-groups/stakeholder-meetings/stakeholder-groups/ipsac-ny-ne.aspx.
The discussions at the meeting described above may address matters
at issue in the following proceedings:
Docket No. ER08-1281, New York Independent System Operator, Inc.
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. EL10-52, Central Transmission, LLC v. PJM Interconnection,
L.L.C.
Docket No. ER10-253 and EL10-14, Primary Power, L.L.C.
Docket No. EL12-69, Primary Power LLC v. PJM Interconnection, L.L.C.
Docket No. ER11-1844, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-1178, PJM Interconnection, L.L.C.
Docket No. ER13-90, Public Service Electric and Gas Company and PJM
Interconnection, L.L.C.
Docket No. ER13-102, New York Independent System Operator, Inc.
Docket No. ER13-193, ISO New England Inc.
Docket No. ER13-195, Indicated PJM Transmission Owners
Docket No. ER13-196, ISO New England Inc.
Docket No. ER13-198, PJM Interconnection, L.L.C
Docket No. ER13-397, PJM Interconnection, L.L.C.
Docket No. ER13-673, PJM Interconnection, L.L.C
Docket No. ER13-703, PJM Interconnection, L.L.C.
Docket No. ER13-887, PJM Interconnection, L.L.C.
Docket No. ER13-1052, PJM Interconnection, L.L.C. and the Midwest
Independent Transmission System Operator, Inc.
Docket No. ER13-1054, PJM Interconnection, L.L.C. and the Midwest
Independent Transmission System Operator, Inc.
For more information, contact Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy Regulatory Commission at (202) 502-
6604 or jonathan.fernandez@ferc.gov.
Dated: May 10, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-11664 Filed 5-15-13; 8:45 am]
BILLING CODE 6717-01-P