Federal Register / Vol. 78, No. 95 / Thursday, May 16, 2013 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2009–154]
tkelley on DSK3SPTVN1PROD with NOTICES
Virginia Electric and Power Company;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project Use
of Project Lands and Waters.
b. Project No: 2009–154.
c. Date Filed: February 28, 2013.
d. Applicant: Virginia Electric and
Power Company d/b/a Dominion North
Carolina Power.
e. Name of Project: Roanoke Rapids
and Gaston Hydroelectric Project.
f. Location: The Roanoke Rapids and
Gaston Hydroelectric Project is located
on the Roanoke River, on the VirginiaNorth Carolina border, in Brunswick
and Mecklenburg counties, Virginia,
and in Halifax, Northampton, and
Warren counties, North Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C .791a–825r.
h. Applicant Contact: James
Thornton, Virginia Electric and Power
Company, 5000 Dominion Boulevard,
Glen Allen, Virginia 23060; Phone: (804)
273–3257.
i. FERC Contact: Patricia A. Grant at
(312) 596–4435, or email:
patricia.grant@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: June
10, 2013.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. Please include the project
number (P–2009–154) on any
VerDate Mar<15>2010
18:13 May 15, 2013
Jkt 229001
comments, motions, or
recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Virginia
Electric and Power Company requests
permission to authorize Dockside
Associates LLC to construct 45 new boat
slips on four new pile-supported docks
along approximately 1,850 linear feet of
lake shoreline owned by the licensee.
This docking facility, on licensee land,
will support a new commercial
development to be known as Dockside
Landing at Pea Hill, to be constructed
on the adjacent 7.7-acre commercial
property in Northampton County, North
Carolina.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document (P–2009). You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the licensee’s offices.
Agencies may obtain copies of the
application directly from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: May 10, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11657 Filed 5–15–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 12613–004]
Tygart, LLC; Notice of Application
Tendered for Filing With the
Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: 12613–004.
c. Date Filed: April 30, 2013.
d. Applicant: Tygart, LLC.
e. Name of Project: Tygart
Hydroelectric Project.
f. Location: The proposed project
would be located at the U.S. Army
Corps of Engineers’ (Corps) Tygart Dam
on the Tygart River in Taylor County,
West Virginia. The project would
occupy 1 acre of federal land managed
by the Corps.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
E:\FR\FM\16MYN1.SGM
16MYN1
28831
Federal Register / Vol. 78, No. 95 / Thursday, May 16, 2013 / Notices
h. Applicant Contact: David Sinclair,
President, Advanced Hydro Solutions,
3000 Auburn Drive, Suite 430,
Beachwood, OH 44122–4340 or by
email at David.Sinclair@advancedhydro
solutions.com.
i. FERC Contact: Allyson Conner,
(202) 502–6082 or
allyson.conner@ferc.gov.
j. The application is not ready for
environmental analysis at this time.
k. The proposed project would utilize
the Corps’ existing Tygart Dam, and
would consist of the following new
facilities: (1) A 15-foot-wide by 21-foothigh steel intake structure; (2) a 270foot-long penstock which would
bifurcate into a 110-foot-long and a 150foot-long penstock; (3) a 121-foot-long
by 99-foot-wide concrete powerhouse;
(4) two unequal-sized turbines with a
combined capacity of 30 megawatts; (5)
an excavated 60-foot-wide by 160-footlong tailrace; (6) a 1.54-mile-long
transmission line; and (7) a switchyard
with appurtenant facilities. The average
annual generation is estimated to be
108,600 megawatt-hours.
The proposed project would operate
in a run-of-release mode using flows
made available by the Corps.
The proposed project boundary would
enclose all of the generating facilities
located on 1 acre of Corps’ land as well
as the transmission line located on 7
acres of privately owned land.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Milestone
Date
Notice of Acceptance/Notice of Ready for Environmental Analysis .......................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .....................................................
Commission issues Non-Draft EA ...........................................................................................................................................
Comments on EA ....................................................................................................................................................................
Modified Terms and Conditions ...............................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: May 10, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11659 Filed 5–15–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR13–49–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Mountaineer Gas Company v.
Washington Gas Light Company;
Notice of Complaint
Take notice that on April 30, 2013,
Mountaineer Gas Company
(Mountaineer or Complainant) filed a
complaint against Washington Gas Light
Company (WGL or Respondent),
pursuant to the Natural Gas Act (NGA),
15 U.S.C. 717–717z, and Rule 206, 18
CFR 385.206, of the Federal Energy
Regulatory Commission’s Rules of
Practice and Procedure, alleging that the
WGL is charging Mountaineer increased
rates for lost and unaccounted for
(LAUF) gas that have not been approved
or otherwise ruled upon by the
Commission in Docket Nos. PR13–6 and
VerDate Mar<15>2010
18:13 May 15, 2013
Jkt 229001
PR13–7. Complainant alleges that
WGL’s unauthorized LAUF percentage
increase violates the procedural
requirements of section 4 of the NGA, is
inconsistent with the Commission’s
established processing for WGL’s LAUF
applications, and is inconsistent with
the terms of the parties’ transportation
agreement and WGL’s tariff.
Mountaineer Gas Company certifies
that copies of the complaint were served
on the contacts of Washington Gas Light
Company as listed on the Commission’s
list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
PO 00000
Frm 00036
Fmt 4703
Sfmt 9990
June 29, 2013.
August 28, 2013.
December 26, 2013.
January 25, 2014.
March 26, 2014.
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 20, 2013
Dated: May 10, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–11662 Filed 5–15–13; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 78, Number 95 (Thursday, May 16, 2013)]
[Notices]
[Pages 28830-28831]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-11659]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ Project No. 12613-004]
Tygart, LLC; Notice of Application Tendered for Filing With the
Commission and Establishing Procedural Schedule for Licensing and
Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License.
b. Project No.: 12613-004.
c. Date Filed: April 30, 2013.
d. Applicant: Tygart, LLC.
e. Name of Project: Tygart Hydroelectric Project.
f. Location: The proposed project would be located at the U.S. Army
Corps of Engineers' (Corps) Tygart Dam on the Tygart River in Taylor
County, West Virginia. The project would occupy 1 acre of federal land
managed by the Corps.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
[[Page 28831]]
h. Applicant Contact: David Sinclair, President, Advanced Hydro
Solutions, 3000 Auburn Drive, Suite 430, Beachwood, OH 44122-4340 or by
email at David.Sinclair@advancedhydrosolutions.com.
i. FERC Contact: Allyson Conner, (202) 502-6082 or
allyson.conner@ferc.gov.
j. The application is not ready for environmental analysis at this
time.
k. The proposed project would utilize the Corps' existing Tygart
Dam, and would consist of the following new facilities: (1) A 15-foot-
wide by 21-foot-high steel intake structure; (2) a 270-foot-long
penstock which would bifurcate into a 110-foot-long and a 150-foot-long
penstock; (3) a 121-foot-long by 99-foot-wide concrete powerhouse; (4)
two unequal-sized turbines with a combined capacity of 30 megawatts;
(5) an excavated 60-foot-wide by 160-foot-long tailrace; (6) a 1.54-
mile-long transmission line; and (7) a switchyard with appurtenant
facilities. The average annual generation is estimated to be 108,600
megawatt-hours.
The proposed project would operate in a run-of-release mode using
flows made available by the Corps.
The proposed project boundary would enclose all of the generating
facilities located on 1 acre of Corps' land as well as the transmission
line located on 7 acres of privately owned land.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item h
above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule will be made as appropriate.
------------------------------------------------------------------------
Milestone Date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready June 29, 2013.
for Environmental Analysis.
Filing of recommendations, August 28, 2013.
preliminary terms and conditions,
and fishway prescriptions.
Commission issues Non-Draft EA...... December 26, 2013.
Comments on EA...................... January 25, 2014.
Modified Terms and Conditions....... March 26, 2014.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: May 10, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-11659 Filed 5-15-13; 8:45 am]